[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271285":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1271285,858,1,"单选题","吊顶工程与设备相遇时，应调整并（ ）吊杆。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","减少",false,{"key":16,"text":17,"correct":14},"B","不增减",{"key":19,"text":20,"correct":21},"C","增设",true,{"key":23,"text":24,"correct":14},"D","加固","吊顶工程与设备相遇时，应调整并增设吊杆。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]