[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271201":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1271201,858,1,"单选题","填土时应为最优含水量。重要工程或大面积的地面填土前，应取土样，按击实试验确定（ ）与相应的最大干密度。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","最优含水量",true,{"key":16,"text":17,"correct":18},"B","最优含水率",false,{"key":20,"text":21,"correct":18},"C","最优加水量",{"key":23,"text":24,"correct":18},"D","最优加水率","填土时应为最优含水量。重要工程或大面积的地面填土前，应取土样，按击实试验确定最优含水量与相应的最大干密度。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]