[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271120":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1271120,858,3,"判断题","钢网架结构总拼完成后及屋面工程完成后应分别测量其挠度值，且所测的挠度值不应超过相应设计值。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"钢网架结构总拼完成后及屋面工程完成后应分别测量其挠度值，且所测的挠度值不应超过相应设计值的1.15倍",{"id":6,"name":21,"category":22,"favorite":23},"(土建质量)专业管理实务 岗位知识","建筑工程",0]