[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271047":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1271047,858,1,"单选题","交货检验的湿拌砂浆试样应在（ ）随机采取。当从运输车中取样时，砂浆试样应在卸料过程中卸量的1\u002F4～3\u002F4之间采取，且应从同一运输车中采取。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","使用地点",false,{"key":16,"text":17,"correct":18},"B","交货地点",true,{"key":20,"text":21,"correct":14},"C","搅拌地点",{"key":23,"text":24,"correct":14},"D","出厂地点","交货检验的湿拌砂浆试样应在交货地点随机采取。当从运输车中取样时，砂浆试样应在卸料过程中卸量的1\u002F4～3\u002F4之间采取，且应从同一运输车中采取。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]