[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1271026":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1271026,858,3,"判断题","砂、石材料进场后，一般每个工程检验一批即可满足规范要求。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"砂、石材料进场后，工程的每个检验批都必须满足规范要求。",{"id":6,"name":21,"category":22,"favorite":23},"(土建质量)专业管理实务 岗位知识","建筑工程",0]