[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270927":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1270927,858,1,"单选题","地下连续墙施工时，混凝土应按每一个单元槽段留置一组抗压强度试件，每（ ）个单元槽段留置一组抗渗试件。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","4",{"key":19,"text":20,"correct":21},"C","5",true,{"key":23,"text":24,"correct":14},"D","6","地下连续墙施工时，混凝土应按每一个单元槽段留置一组抗压强度试件，每5个单元槽段留置一组抗渗试件",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]