[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270877":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1270877,858,3,"判断题","人工挖孔桩的桩位偏差不是其主控项目。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"人工挖孔桩的主控项目有桩位偏差，承载力，桩体质量检验",{"id":6,"name":21,"category":22,"favorite":23},"(土建质量)专业管理实务 岗位知识","建筑工程",0]