[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270869":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1270869,858,1,"单选题","对灰土地基，强夯地基，其竣工后的地基强度或承载力检验数量，每单位工程不应少于（ ）点，每一独立基础下至少应有1点。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":21},"C","3",true,{"key":23,"text":24,"correct":14},"D","4","对灰土地基，强夯地基，其竣工后的地基强度或承载力检验数量，每单位工程不应少于3点，每一独立基础下至少应有1点，基槽没20延米应有1点",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]