[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270856":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1270856,858,1,"单选题","主控项目必须（ ）符合验收标准规定。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","80％及以上",false,{"key":16,"text":17,"correct":14},"B","90％及以上",{"key":19,"text":20,"correct":14},"C","95％",{"key":22,"text":23,"correct":24},"D","100％",true,"工程检验批质量验收要求为主控项目必须全部符合要求而一般项目应有80％合格",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]