[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270853":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1270853,858,1,"单选题","桩基工程应由（ ）组织验收。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总监理工程师或建设单位项目负责人",true,{"key":16,"text":17,"correct":18},"B","施工单位项目负责人",false,{"key":20,"text":21,"correct":18},"C","质监站人员",{"key":23,"text":24,"correct":18},"D","质量员","分部（子分部）工程验收应由总监理工程师或建设单位项目负责人组织勘察、设计单位及施工单位的项目负责人、技术质量负责人，共同按设计要求和本规范及其他有关规定进行验收",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]