[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270829":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1270829,858,1,"单选题","砂和砂石地基的最优含水量可用（ ）求得。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","轻型击实试验",true,{"key":16,"text":17,"correct":18},"B","环刀取样试验",false,{"key":20,"text":21,"correct":18},"C","烘干试验",{"key":23,"text":24,"correct":18},"D","称重试验","《建筑地基基础工程施工质量验收规范》4.1.5条规定对灰土地基、砂和砂石地基、土工合成材料地基、粉煤灰地基、强夯地基、注浆地基、预压地基，其竣工后的结果（地基强度或承载力）必须达到设计要求的标准。检验数量，每单位工程不应少于3点，1000㎡以上工程，每100㎡至少应有1点，3000㎡以上工程，每300㎡至少应有1点。每一独立基础下至少应有1点，基槽每20延米应有1点。也可参照建筑地基处理规范50-100㎡不少于一个点，基槽10-20米一个点，独立柱基不少于1个点。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]