[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270790":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1270790,858,3,"判断题","施工单位在工程完工后对工程质量进行了检查，确认工程质量符合有关法律、法规和工程建设强制性标准，符合设计文件及合同要求，并提出工程竣工报告。工程竣工报告应经项目经理和施工单位有关负责人审核签字。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(土建质量)专业管理实务 岗位知识","建筑工程",0]