[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270770":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1270770,858,3,"判断题","《建筑地基基础工程施工质量验收规范》GB50202—2002中，土方开挖的顺序、方法必须与设计工况相一致，并遵循”开槽支撑，先撑后挖，分层开挖，严禁超挖”的原则。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(土建质量)专业管理实务 岗位知识","建筑工程",0]