[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270711":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1270711,858,1,"单选题","下列施工质量控制措施中，不属于事前控制的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","落实质量责任",false,{"key":16,"text":17,"correct":14},"B","设置质量管理点",{"key":19,"text":20,"correct":14},"C","明确质量目标",{"key":22,"text":23,"correct":24},"D","施工质量检查验收",true,"事前质量控制指在正式施工前进行的事前主动质量控制，通过编制施工质量计划，明确质量目标，制定施工方案，设置质量管理点，落实质量责任，分析可能导致质量目标偏离的各种影响因素，针对这些影响因素制定有效的防范措施，防患于未然。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)专业管理实务 岗位知识","建筑工程",0]