[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-857-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":388},{"id":5,"name":6,"category":7,"favorite":8},857,"(土建质量)基础知识","建筑工程",0,9,50,1275,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,248,260,272,284,290,296,308,320,326,334,346,352,364,376],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1269792,3,"判断题","项目结构图描述的是工作对象之间的关系。（ ）",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1269793,"施工项目作为一个管理整体，是以建筑施工企业为管理主体的。（ ）",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1269794,"安全检查可分为日常性检查、节假日前后的检查、专业性检查、季节性检查。（ ）",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1269795,"项目经理部是工程的主管部门，主要负责工程项目在保修期间问题的处理，包括因质量问题造成的返修、工程剩余价款的结算以及回收等。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1269796,"矩阵式项目组织适用于大型、复杂的施工项目，有利于人才的全面培养。（ ）",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1269797,"调整项目组织结构、任务分工、管理职能分工、工作流程组织和项目管理班子人员等属于管理措施。（ ）",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1269798,"工程项目中的生产要素在工程项目实施中必不可少，其费用一般占工程总费用的50％以上。（ ）",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1269799,"进度控制的组织措施包括建立进度报告制度和进度信息沟通网络。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1269800,"施工总承包方必要时可以代表业主方与设计方、工程监理方联系和协调。（ ）",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1269801,"电工、焊工、锅炉工、爆破工、起重机司机、打桩机司机和各种机动车司机，必须经过专门训练，考试合格后发给岗位证，方可独立操作。（ ）",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1269802,"贯彻安全第一方针，必须强调检查为主。（ ）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1269803,"进度控制的组织措施不包括建立进度控制小组，将进度控制任务落实到个人。（ ）",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1269804,"在施工成本控制中，把施工成本的实际值与计划值的差异叫作施工成本偏差。（ ）",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1269805,"施工方的项目管理工作主要在施工阶段进行，因此，施工方的项目管理工作不涉及设计阶段。（ ）",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1269806,"施工方项目管理应仅限服务于施工方本身的利益，不服务于项目的整体利益。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1269807,"施工项目管理的主体是施工作业管理层。（ ）",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1269808,"隐蔽工程在隐蔽前应由施工单位通知有关单位进行验收，并应形成验收文件。（ ）",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1269809,"制度保证体系的构成：岗位管理、措施管理、投入和物资管理。（ ）",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1269810,"分包方的成本目标是由分包合同确定的。（ ）",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1269811,"施工员主要从事项目施工组织和进度控制。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1269812,"施工项目管理的主体是建筑企业。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1269813,"质量事故的处理应达到安全可靠、不留隐患、满足生产和使用要求、施工方便、经济合理的目的。（ ）",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1269814,"在工程开工前，由项目经理组织编制施工项目管理实施规划，对施工项目管理从开工到交工验收进行全面的指导性规划。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1269815,"施工项目是指建筑企业自施工投标开始到保修期满为止的全部过程中完成的项目。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1269816,"对于重要的工序或对工程质量有重大影响的工序，应严格执行“三检”制度，未经监理工程师（或建设单位技术负责人）检查认可，不得进行下道工序施工。（ ）",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1269817,"在双代号网络计划中，以波形线表示工作的自由时差。（ ）",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1269818,"关键岗位和有危险作业活动的人员必须按有关规定，经培训、考核、持证上岗。（ ）",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1269819,"施工项目成本核算是指按照规定开支范围对施工费用进行归集，计算出施工费用的实际发生额，并根据成本分析对象，采用适当的方法，计算出该施工项目的总成本和单位成本。（ ）",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1269820,"组织分工反映一个组织系统中各子系统或各元素的工作任务分工和管理职能分工。（ ）",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1269821,"部门控制式项目组织一般适用于大型、工期要求紧迫的施工项目。（ ）",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1269822,"项目管理是指项目管理者为达到项目的目标，运用系统理论和方法对项目进行的策划、组织、控制、协调等活动过程的总称。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1269823,"当工程的某些部分的质量虽未达到规定的规范、标准或设计要求，存在一定的缺陷，但经过修补后还可达到标准的要求，在不影响使用功能或外观要求的情况下，可以不做处理。（ ）",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1269824,"项目是指为达到符合规定要求的目标，按限定时间、限定资源和限定质量标准等约束条件完成的，由一系列相互协调的受控活动组成的特定过程。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1269825,"组织结构模式和组织分工都是一种相对动态的组织关系，工作流程组织则可反映一个组织系统中各项工作之间的逻辑关系，是一种静态关系。（ ）",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1269826,"当进度发生偏差时，可通过改变某些工作的逻辑关系或改变某些工作的持续时间来进行纠偏。（ ）",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":234,"typeLabel":235,"stem":236,"options":237,"answer":246,"analysis":27},1269827,1,"单选题","施工项目的劳动组织不包括下列的（ ）。",[238,240,242,245],{"key":20,"text":239,"correct":26},"劳务输入",{"key":24,"text":241,"correct":26},"劳动力组织",{"key":243,"text":244,"correct":26},"C","项目经理部对劳务队伍的管理",{"key":246,"text":247,"correct":22},"D","劳务输出",{"id":249,"libraryId":5,"type":234,"typeLabel":235,"stem":250,"options":251,"answer":243,"analysis":27},1269828,"在施工成本控制的步骤中，（ ）是施工成本控制工作的核心。",[252,254,256,258],{"key":20,"text":253,"correct":26},"预测",{"key":24,"text":255,"correct":26},"检查",{"key":243,"text":257,"correct":22},"分析",{"key":246,"text":259,"correct":26},"纠偏",{"id":261,"libraryId":5,"type":234,"typeLabel":235,"stem":262,"options":263,"answer":20,"analysis":27},1269829,"施工安全管理体系的建立，必须适用于工程施工全过程的（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"安全管理和控制",{"key":24,"text":267,"correct":26},"进度管理和控制",{"key":243,"text":269,"correct":26},"成本管理和控制",{"key":246,"text":271,"correct":26},"质量管理和控制",{"id":273,"libraryId":5,"type":234,"typeLabel":235,"stem":274,"options":275,"answer":243,"analysis":27},1269830,"施工项目管理的主体是（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"建设单位",{"key":24,"text":279,"correct":26},"设计单位",{"key":243,"text":281,"correct":22},"施工单位",{"key":246,"text":283,"correct":26},"监理单位",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":25,"analysis":27},1269831,"组织结构模式和组织分工都是一种相对动态的组织关系。（ ）",[288,289],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":21,"analysis":27},1269832,"施工项目成本预测是施工项目成本计划与决策的依据。（ ）",[294,295],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":297,"libraryId":5,"type":234,"typeLabel":235,"stem":298,"options":299,"answer":246,"analysis":27},1269833,"难以直接用与定量分析，只能对定量分析起一定指导作用的成本偏差分析方法是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":26},"排列图法",{"key":24,"text":303,"correct":26},"表格法",{"key":243,"text":305,"correct":26},"横道图法",{"key":246,"text":307,"correct":22},"曲线法",{"id":309,"libraryId":5,"type":234,"typeLabel":235,"stem":310,"options":311,"answer":24,"analysis":27},1269834,"下列选项中关于施工项目管理的特点说法有误的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":26},"对象是施工项目",{"key":24,"text":315,"correct":22},"主体是建设单位",{"key":243,"text":317,"correct":26},"内容是按阶段变化的",{"key":246,"text":319,"correct":26},"要求强化组织协调工作",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":25,"analysis":27},1269835,"某施工项目为8000㎡的公共建筑工程施工，按照要求，须实行施工项目管理。",[324,325],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":327,"libraryId":5,"type":234,"typeLabel":235,"stem":328,"options":329,"answer":24,"analysis":27},1269836,"成本管理者能够综合了解处理数据的是（ ）。",[330,331,332,333],{"key":20,"text":301,"correct":26},{"key":24,"text":303,"correct":22},{"key":243,"text":305,"correct":26},{"key":246,"text":307,"correct":26},{"id":335,"libraryId":5,"type":234,"typeLabel":235,"stem":336,"options":337,"answer":20,"analysis":27},1269837,"调整项目组织结构、任务分工、进行管理职能分工，属于项目目标动态控制纠偏措施中的（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"组织措施",{"key":24,"text":341,"correct":26},"管理措施",{"key":243,"text":343,"correct":26},"经济措施",{"key":246,"text":345,"correct":26},"技术措施",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":25,"analysis":27},1269838,"项目组织结构图应主要表达出业主方的组织关系，而项目的参与单位等有关的各工作部门之间的组织关系则应省略。（ ）",[350,351],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":353,"libraryId":5,"type":234,"typeLabel":235,"stem":354,"options":355,"answer":243,"analysis":27},1269839,"以下选项，关于部门控制式项目组织的优点的说法不正确的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":26},"职责明确，职能专一，关系简单",{"key":24,"text":359,"correct":26},"从接受任务到组织运转启动，时间短",{"key":243,"text":361,"correct":22},"从接受任务到组织运转启动，时间长",{"key":246,"text":363,"correct":26},"相互熟悉的人组合，人事关系便于协调",{"id":365,"libraryId":5,"type":234,"typeLabel":235,"stem":366,"options":367,"answer":246,"analysis":27},1269840,"工序质量控制的实质是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":26},"对工序本身的控制",{"key":24,"text":371,"correct":26},"对人员的控制",{"key":243,"text":373,"correct":26},"对工序的实施方法的控制",{"key":246,"text":375,"correct":22},"对影响工序质量因素的控制",{"id":377,"libraryId":5,"type":234,"typeLabel":235,"stem":378,"options":379,"answer":246,"analysis":27},1269841,"施工现场实行封闭式管理，在现场周边应设置临时围护设施，市区主要路段的围挡高度不得低于（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":26},"1.8",{"key":24,"text":383,"correct":26},"2.0",{"key":243,"text":385,"correct":26},"2.2",{"key":246,"text":387,"correct":22},"2.5",[389,392,395,398,401,404],{"id":234,"name":390,"category":7,"favorite":391},"领导干部任职前廉政法规知识测试题",92,{"id":393,"name":394,"category":7,"favorite":234},595,"建筑结构与设备",{"id":396,"name":397,"category":7,"favorite":234},715,"招标采购专业知识与法律法规",{"id":399,"name":400,"category":7,"favorite":234},848,"市政方向-通用基础",{"id":402,"name":403,"category":7,"favorite":8},534,"BIM工程师",{"id":405,"name":403,"category":7,"favorite":8},535]