[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-857-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":564},{"id":5,"name":6,"category":7,"favorite":8},857,"(土建质量)基础知识","建筑工程",0,8,50,1275,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,319,331,343,355,364,374,386,398,406,418,426,438,450,462,474,486,498,510,518,528,534,540,546,552,558],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1269742,1,"单选题","以下关于施工现场环境保护管理做法错误的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","施工现场泥浆、污水未经处理不得直接排人城市排水设施和河流、湖泊、池塘",false,{"key":24,"text":25,"correct":22},"B","高空施工的垃圾和废弃物应采用密闭式串筒或其他措施清理搬运",{"key":27,"text":28,"correct":22},"C","装载建筑材料、垃圾、渣土等散碎物料的车辆应有严密遮挡措施，防止飞扬、洒漏或流溢",{"key":30,"text":31,"correct":32},"D","经过施工现场的地下管线，应由发包人标出位置，加以保护",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1269743,"合同控制的技术措施主要包括：（ ）。①采用多级网络计划技术和其他先进适用的计划技术②加强合同管理，加强组织、指挥和协调，以保证合同进度目标的实现③严格控制合同变更，对各方提出的工程变更和设计变更，经监理工程师严格审查后补进合同文件④采用先进高效的技术和设备⑤加强风险管理，在合同中要充分考虑风险因素及其对进度的影响和处理办法",[38,40,42,44],{"key":20,"text":39,"correct":22},"①③⑤",{"key":24,"text":41,"correct":32},"②③⑤",{"key":27,"text":43,"correct":22},"③④⑤",{"key":30,"text":45,"correct":22},"①④⑤",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1269744,"某工程项目，在确定工期目标后，为保证项目按期完成，项目经理进一步确定了每月的进度目标。这项工作在运用动态控制原理进行进度控制的工作步骤中，属于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"将工程进度目标逐层分解",{"key":24,"text":53,"correct":22},"定期比较工程进度的实际值与计划值",{"key":27,"text":55,"correct":22},"收集工程进度实际值",{"key":30,"text":57,"correct":22},"确定进度控制周期",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1269745,"安全检查的主要内容是（ ）。①查思想②查管理③查隐患④查整改⑤查事故处理。",[62,64,66,68],{"key":20,"text":63,"correct":22},"②③④",{"key":24,"text":65,"correct":22},"①②③④",{"key":27,"text":67,"correct":22},"①②③⑤",{"key":30,"text":69,"correct":32},"①②③④⑤",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1269746,"在工程验收过程中，经具有资质的法定检测单位对个别检验批检测鉴定后，发现其不能够达到设计要求。但经原设计单位核算后认为能满足结构安全和使用功能的要求。对此，正确的做法是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"可予以验收",{"key":24,"text":77,"correct":22},"禁止验收",{"key":27,"text":79,"correct":22},"由建设单位决定是否通过验收",{"key":30,"text":81,"correct":22},"需要返工",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1269747,"在应用动态控制原理控制建设工程项目目标时，调整项目管理班子人员属于（ ）措施。",[86,88,90,92],{"key":20,"text":87,"correct":32},"组织",{"key":24,"text":89,"correct":22},"合同",{"key":27,"text":91,"correct":22},"经济",{"key":30,"text":93,"correct":22},"技术",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1269748,"下列选项中，属于施工方项目管理目标的是项目的（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":32},"成本目标",{"key":24,"text":101,"correct":22},"功能目标",{"key":27,"text":103,"correct":22},"投资目标",{"key":30,"text":105,"correct":22},"使用目标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1269749,"调整进度管理的方法和手段，改变施工管理和强化合同管理等属于（ ）的纠偏措施。",[110,112,114,116],{"key":20,"text":111,"correct":22},"组织措施",{"key":24,"text":113,"correct":32},"管理措施",{"key":27,"text":115,"correct":22},"经济措施",{"key":30,"text":117,"correct":22},"进度措施",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1269750,"下列性质中，不属于项目经理部的性质的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"法律强制性",{"key":24,"text":125,"correct":22},"相对独立性",{"key":27,"text":127,"correct":22},"综合性",{"key":30,"text":129,"correct":22},"临时性",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1269751,"不属于影响项目质量因素中人的因素是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"建设单位",{"key":24,"text":137,"correct":22},"政府主管及工程质量监督",{"key":27,"text":139,"correct":32},"材料价格",{"key":30,"text":141,"correct":22},"供货单位",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1269752,"施工项目过程控制中，加强专项检查，包括自检、（ ）、互检。",[146,148,150,152],{"key":20,"text":147,"correct":32},"专检",{"key":24,"text":149,"correct":22},"全检",{"key":27,"text":151,"correct":22},"交接检",{"key":30,"text":153,"correct":22},"质检",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1269753,"能形象、直观、准确地表达出施工成本的绝对偏差施工成本偏差分析法是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"排列图法",{"key":24,"text":161,"correct":22},"表格法",{"key":27,"text":163,"correct":32},"横道图法",{"key":30,"text":165,"correct":22},"曲线法",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1269754,"下列各项措施中，不属于施工项目质量控制的措施的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"提高管理、施工及操作人员自身素质",{"key":24,"text":173,"correct":22},"提高施工的质量管理水平",{"key":27,"text":175,"correct":32},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术，保证进度目标实现",{"key":30,"text":177,"correct":22},"加强施工项目的过程控制",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1269755,"安全检查的重点是违章作业和（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":32},"违章指挥",{"key":24,"text":185,"correct":22},"无证上岗",{"key":27,"text":187,"correct":22},"危险操作",{"key":30,"text":189,"correct":22},"建材损坏",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},1269756,"合理选择和使用施工机械设备，是保证施工质量的重要环节。机械设备的使用应贯彻“人机固定”的原则，实行（ ）制度。",[194,196,198,200],{"key":20,"text":195,"correct":22},"定机、定时间、定岗位职责",{"key":24,"text":197,"correct":22},"定机、定人、定性能参数",{"key":27,"text":199,"correct":22},"定机、定费用、定性能参数",{"key":30,"text":201,"correct":32},"定机、定人、定岗位职责",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1269757,"为使施工单位熟悉有关的设计图纸，充分了解拟建项目的特点、设计意图和工艺与质量要求，减少图纸的差错，消灭图纸中的质量隐患，要做好（ ）的工作。",[206,208,210,212],{"key":20,"text":207,"correct":22},"设计交底、图纸整理",{"key":24,"text":209,"correct":22},"设计修改、图纸审核",{"key":27,"text":211,"correct":32},"设计交底、图纸审核",{"key":30,"text":213,"correct":22},"设计修改、图纸整理",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1269758,"未搞清地质情况就仓促开工，边设计边施工，无图施工，不经竣工验收就交付使用等，这是施工项目质量问题中（ ）的原因。",[218,220,222,224],{"key":20,"text":219,"correct":32},"违背建设程序",{"key":24,"text":221,"correct":22},"违反法规行为",{"key":27,"text":223,"correct":22},"地质勘察失真",{"key":30,"text":225,"correct":22},"施工与管理不到位",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1269759,"贯彻安全第一方针，必须强调（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":32},"预防为主",{"key":24,"text":233,"correct":22},"检查为主",{"key":27,"text":235,"correct":22},"调整为主",{"key":30,"text":237,"correct":22},"改进为主",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":30,"analysis":33},1269760,"施工成本控制中最具有实质性的一步是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"预测",{"key":24,"text":245,"correct":22},"检查",{"key":27,"text":247,"correct":22},"分析",{"key":30,"text":249,"correct":32},"纠偏",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1269761,"在工程施工以前对成本进行估算的，属于（ ）的内容。",[254,256,258,260],{"key":20,"text":255,"correct":32},"施工成本预测",{"key":24,"text":257,"correct":22},"施工成本控制",{"key":27,"text":259,"correct":22},"施工成本分析",{"key":30,"text":261,"correct":22},"施工成本计划",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1269762,"下列施工项目管理程序的排序正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":32},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":269,"correct":22},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":27,"text":271,"correct":22},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":30,"text":273,"correct":22},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1269763,"某建筑施工企业承揽了一个小型房屋建造项目，并任命了项目经理，要求项目经理尽快组建项目管理机构。该项目组织系统适宜选择的组织结构模式是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"线性组织结构",{"key":24,"text":281,"correct":22},"矩阵组织结构",{"key":27,"text":283,"correct":32},"职能组织结构",{"key":30,"text":285,"correct":22},"项目组织结构",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1269764,"某建设工程项目的管理按照职能组织结构模式运行，这个组织系统的特点是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"没有相互矛盾的指令源",{"key":24,"text":293,"correct":22},"有纵向和横向的指令源",{"key":27,"text":295,"correct":32},"可能有多个矛盾的指令源",{"key":30,"text":297,"correct":22},"指令源唯",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},1269765,"以下选项中不属于施工项目管理的客体的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"施工对象",{"key":24,"text":305,"correct":22},"施工活动",{"key":27,"text":307,"correct":22},"施工的相关生产要素",{"key":30,"text":309,"correct":32},"项目经理部",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},1269766,"具有形象直观，但反映的信息量少，一般在项目的较高管理层应用的施工成本偏差分析方法是（ ）。",[314,315,316,318],{"key":20,"text":163,"correct":32},{"key":24,"text":161,"correct":22},{"key":27,"text":317,"correct":22},"排列法",{"key":30,"text":165,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1269767,"某住宅小区建设项目，每栋住宅楼可以作为一个（ ）进行质量控制。",[323,325,327,329],{"key":20,"text":324,"correct":22},"分部工程",{"key":24,"text":326,"correct":32},"单位工程",{"key":27,"text":328,"correct":22},"单项工程",{"key":30,"text":330,"correct":22},"分项工程",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":30,"analysis":33},1269768,"施工安全技术措施可按施工准备阶段和施工阶段编写，其中，施工准备阶主要包括技术准备、物资准备、施工现场准备和（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"设备准备",{"key":24,"text":338,"correct":22},"资料准备",{"key":27,"text":340,"correct":22},"施工方案准备",{"key":30,"text":342,"correct":32},"施工队伍准备",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},1269769,"对项目目标进行动态跟踪和控制，在确定了项目目标计划值后的施工过程中，首先应做的是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"调整项目目标",{"key":24,"text":350,"correct":22},"采取纠偏措施进行纠偏",{"key":27,"text":352,"correct":32},"收集工程进度的实际值",{"key":30,"text":354,"correct":22},"比较项目目标的实际值与计划值",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1269770,"在施工成本控制的步骤中，通过（ ），可以估算整个项目完成时的施工成本，为决策提供支持。",[359,360,361,362],{"key":20,"text":243,"correct":32},{"key":24,"text":245,"correct":22},{"key":27,"text":247,"correct":22},{"key":30,"text":363,"correct":22},"比较",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1269771,"下列措施中，不属于施工项目安全控制的措施的是（ ）。",[368,369,371,372],{"key":20,"text":111,"correct":22},{"key":24,"text":370,"correct":22},"技术措施",{"key":27,"text":113,"correct":32},{"key":30,"text":373,"correct":22},"制度措施",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1269772,"施工项目成本控制的步骤是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":32},"比较一分析一预测一纠偏一检查",{"key":24,"text":381,"correct":22},"预测一比较一分析一纠偏一检查",{"key":27,"text":383,"correct":22},"比较一分析一预测一检查一纠偏",{"key":30,"text":385,"correct":22},"预测一分析一比较一纠偏一检查",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1269773,"施工项目目标控制包括：施工项目进度控制、施工项目质量控制、（ ）、施工项目安全控制四个方面。",[390,392,394,396],{"key":20,"text":391,"correct":22},"施工项目管理控制",{"key":24,"text":393,"correct":32},"施工项目成本控制",{"key":27,"text":395,"correct":22},"施工项目人力控制",{"key":30,"text":397,"correct":22},"施工项目物资控制",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":30,"analysis":33},1269774,"为了取得施工成本管理的理想效果，必须从多方面采取有效措施实施管理，这些措施不包括（ ）。",[402,403,404,405],{"key":20,"text":111,"correct":22},{"key":24,"text":370,"correct":22},{"key":27,"text":115,"correct":22},{"key":30,"text":113,"correct":32},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1269775,"下列选项中，属于施工项目管理的目标是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"施工的效率目标、施工的环境目标和施工的质量目标",{"key":24,"text":413,"correct":32},"施工的成本目标、施工的进度目标和施工的质量目标",{"key":27,"text":415,"correct":22},"施工的成本目标、施工的速度目标和施工的质量目标",{"key":30,"text":417,"correct":22},"施工的成本目标、施工的进度目标和施工的利润目标",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1269776,"某建筑施工企业承揽了一个小型房屋建造项目.并任命了项目经理.要求项目经理尽快组建项目管理机构.该项目组织系统适宜选择的组织结构模式是（ ）",[422,423,424,425],{"key":20,"text":279,"correct":22},{"key":24,"text":281,"correct":22},{"key":27,"text":283,"correct":32},{"key":30,"text":285,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1269777,"根据国际惯例，施工总承包方式工程施工的总执行者和总组织者，它除了完成自己承担的施工任务以外，还负责组织和指挥它自行分包的分包施工单位和（ ）的施工。",[430,432,434,436],{"key":20,"text":431,"correct":22},"劳务分包的分包单位",{"key":24,"text":433,"correct":32},"业主指定的分包单位",{"key":27,"text":435,"correct":22},"专业分包的分包单位",{"key":30,"text":437,"correct":22},"联合分包的分包单位",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},1269778,"下列选项中，不属于施工项目管理组织的主要形式的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"工作队式",{"key":24,"text":445,"correct":32},"线性结构式",{"key":27,"text":447,"correct":22},"矩阵制式",{"key":30,"text":449,"correct":22},"事业部制式",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},1269779,"施工项目管理的主要内容为（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"三控制、二管理、一协调",{"key":24,"text":457,"correct":22},"三控制、三管理、二协调",{"key":27,"text":459,"correct":32},"三控制、三管理、一协调",{"key":30,"text":461,"correct":22},"三控制、三管理、三协调",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1269780,"在一个施工项目中，（ ）是安全管理工作的第一责任人。",[466,468,470,472],{"key":20,"text":467,"correct":22},"工程师",{"key":24,"text":469,"correct":32},"项目经理",{"key":27,"text":471,"correct":22},"安全员",{"key":30,"text":473,"correct":22},"班组长",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},1269781,"某砖混结构教学楼一楼墙体砌筑时，监理发现由于施工放线的失误，导致山墙上窗户的位置偏离30cm,这时应该（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":32},"返工处理",{"key":24,"text":481,"correct":22},"修补处理",{"key":27,"text":483,"correct":22},"加固处理",{"key":30,"text":485,"correct":22},"不作处理",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},1269782,"若工作的进度偏差大于该工作的（ ），说明此偏差对后续工作产生影响，应根据后续工作允许的影响程度来确定如何调整。",[490,492,494,496],{"key":20,"text":491,"correct":32},"自由时差",{"key":24,"text":493,"correct":22},"相关时差",{"key":27,"text":495,"correct":22},"相对时差",{"key":30,"text":497,"correct":22},"总时差",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":30,"analysis":33},1269783,"以下施工安全技术保证体系组成不包括（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"施工安全的组织保证体系",{"key":24,"text":505,"correct":22},"施工安全的制度保证体系",{"key":27,"text":507,"correct":22},"施工安全的技术保证体系",{"key":30,"text":509,"correct":32},"施工安全的合同保证体系",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":27,"analysis":33},1269784,"（ ）是在成本形成过程中，对施工项目成本进行的对比评价和总结工作。",[514,515,516,517],{"key":20,"text":255,"correct":22},{"key":24,"text":257,"correct":22},{"key":27,"text":259,"correct":32},{"key":30,"text":261,"correct":22},{"id":519,"libraryId":5,"type":520,"typeLabel":521,"stem":522,"options":523,"answer":525,"analysis":33},1269785,3,"判断题","安全管理的对象是生产中一切人、物、环境、管理状态，安全管理是一种动态管理。",[524,526],{"key":20,"text":525,"correct":32},"正确",{"key":24,"text":527,"correct":22},"错误",{"id":529,"libraryId":5,"type":520,"typeLabel":521,"stem":530,"options":531,"answer":525,"analysis":33},1269786,"我国建筑企业的安全生产方针是“安全第一，预防为主”。（ ）",[532,533],{"key":20,"text":525,"correct":32},{"key":24,"text":527,"correct":22},{"id":535,"libraryId":5,"type":520,"typeLabel":521,"stem":536,"options":537,"answer":525,"analysis":33},1269787,"工程质量的验收均应在施工单位自行检查评定的基础上进行。（ ）",[538,539],{"key":20,"text":525,"correct":32},{"key":24,"text":527,"correct":22},{"id":541,"libraryId":5,"type":520,"typeLabel":521,"stem":542,"options":543,"answer":527,"analysis":33},1269788,"施工项目成本控制是企业全面成本管理的重要环节，应贯穿于施工项目从招标到竣工的全过程。（ ）",[544,545],{"key":20,"text":525,"correct":22},{"key":24,"text":527,"correct":32},{"id":547,"libraryId":5,"type":520,"typeLabel":521,"stem":548,"options":549,"answer":525,"analysis":33},1269789,"施工质量的影响因素主要有人、材料、机械、方法及环境等五大方面，即4MIE。（ ）",[550,551],{"key":20,"text":525,"correct":32},{"key":24,"text":527,"correct":22},{"id":553,"libraryId":5,"type":520,"typeLabel":521,"stem":554,"options":555,"answer":527,"analysis":33},1269790,"项目质量控制贯穿于项目施工的全过程。",[556,557],{"key":20,"text":525,"correct":22},{"key":24,"text":527,"correct":32},{"id":559,"libraryId":5,"type":520,"typeLabel":521,"stem":560,"options":561,"answer":525,"analysis":33},1269791,"在现代施工企业的项目管理中，施工项目经理是施工项目的最高责任人和组织者，是决定施工项目盈亏的关键性角色。",[562,563],{"key":20,"text":525,"correct":32},{"key":24,"text":527,"correct":22},[565,568,571,574,577,580],{"id":15,"name":566,"category":7,"favorite":567},"领导干部任职前廉政法规知识测试题",92,{"id":569,"name":570,"category":7,"favorite":15},595,"建筑结构与设备",{"id":572,"name":573,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":575,"name":576,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":578,"name":579,"category":7,"favorite":8},534,"BIM工程师",{"id":581,"name":579,"category":7,"favorite":8},535]