[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-857-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":552},{"id":5,"name":6,"category":7,"favorite":8},857,"(土建质量)基础知识","建筑工程",0,7,50,1275,[13,34,46,58,70,80,86,98,110,116,122,134,146,152,164,170,176,188,194,206,212,224,236,248,260,272,284,296,308,314,326,338,344,355,367,379,385,397,409,421,433,445,456,468,480,492,504,516,528,540],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1269691,1,"单选题","扭剪型高强度螺栓连接施工中，（ ）标志着终拧结束。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","螺母旋转角度达到要求",false,{"key":24,"text":25,"correct":22},"B","扭矩值达到要求",{"key":27,"text":28,"correct":22},"C","轴向力达到要求",{"key":30,"text":31,"correct":32},"D","梅花头拧掉",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1269692,"防止钢结构焊缝产生（ ）措施之一是控制焊缝的化学成分。",[38,40,42,44],{"key":20,"text":39,"correct":22},"冷裂纹",{"key":24,"text":41,"correct":32},"热裂纹",{"key":27,"text":43,"correct":22},"气孔",{"key":30,"text":45,"correct":22},"弧坑缩孔",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1269693,"下列关于石材和木地板楼地面铺设施工的说法中，有误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"根据地面标筋铺找平层，找平层起到控制标高和粘结面层的作用",{"key":24,"text":53,"correct":32},"按设计要求用1:1～1:3干硬性水泥砂浆，在地面均匀铺一层厚度为20～30mm的干硬性水泥砂浆",{"key":27,"text":55,"correct":22},"空铺式一般用于平房、底层房屋或较潮湿地面以及地面敷设管道需要将木地板架空等情况",{"key":30,"text":57,"correct":22},"搁栅式实铺木地板的施工工艺流程为：基层处理→安装木搁栅→钉毛地板→弹线、铺钉硬木地板、钉踢脚板→刨光、打磨→油漆",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1269694,"黏土砖应在砌筑前（ ）浇水湿润，以水浸人砖内深度1～1.5cm为宜。",[62,64,66,68],{"key":20,"text":63,"correct":22},"1～12h",{"key":24,"text":65,"correct":22},"3～14h",{"key":27,"text":67,"correct":32},"1～2d",{"key":30,"text":69,"correct":22},"3～4d",{"id":71,"libraryId":5,"type":72,"typeLabel":73,"stem":74,"options":75,"answer":79,"analysis":33},1269695,3,"判断题","砖基础中的灰缝宽度应控制在15mm左右。",[76,78],{"key":20,"text":77,"correct":22},"正确",{"key":24,"text":79,"correct":32},"错误",{"id":81,"libraryId":5,"type":72,"typeLabel":73,"stem":82,"options":83,"answer":77,"analysis":33},1269696,"防水砂浆防水层通常称为刚性防水层，是依靠增加防水层厚度和提高砂浆层的密实性来达到防水要求。",[84,85],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":24,"analysis":33},1269697,"施涂溶剂型涂料时，基层含水率不得大于（ ）。",[90,92,94,96],{"key":20,"text":91,"correct":22},"6％",{"key":24,"text":93,"correct":32},"8％",{"key":27,"text":95,"correct":22},"10",{"key":30,"text":97,"correct":22},"12％",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":24,"analysis":33},1269698,"下列土的工程分类，除（ ）之外，均为岩石。",[102,104,106,108],{"key":20,"text":103,"correct":22},"软石",{"key":24,"text":105,"correct":32},"砂砾坚土",{"key":27,"text":107,"correct":22},"坚石",{"key":30,"text":109,"correct":22},"特坚石",{"id":111,"libraryId":5,"type":72,"typeLabel":73,"stem":112,"options":113,"answer":77,"analysis":33},1269699,"建筑施工是指工程建设实施阶段的生产活动，是各类建筑物的建造过程，也是把设计图纸上的各种线条，在指定的地点变成实物的过程。",[114,115],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":117,"libraryId":5,"type":72,"typeLabel":73,"stem":118,"options":119,"answer":77,"analysis":33},1269700,"在夯实或压实之后，要对每层回填土的质量进行检验，一般采用环刀法（或灌砂法）取样测定。",[120,121],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":24,"analysis":33},1269701,"下列关于钢筋混凝土扩展基础混凝土浇筑的基本规定，错误的是（ ）。",[126,128,130,132],{"key":20,"text":127,"correct":22},"混凝土宜分段分层浇筑，每层厚度不超过500mm",{"key":24,"text":129,"correct":32},"混凝土自高处倾落时，其自由倾落高度不宜超过3m，如高度超过3m，应设料斗、漏斗、串筒、斜槽、溜管，以防止混凝土产生分层离析",{"key":27,"text":131,"correct":22},"各层各段间应相互衔接，每段长2～3m，使逐段逐层呈阶梯形推进",{"key":30,"text":133,"correct":22},"混凝土应连续浇筑，以保证结构良好的整体性",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":27,"analysis":33},1269702,"在涂膜防水屋面施工的工艺流程中，节点部位增强处理后，紧跟的工作是",[138,140,142,144],{"key":20,"text":139,"correct":22},"基层清理",{"key":24,"text":141,"correct":22},"喷涂基层处理剂",{"key":27,"text":143,"correct":32},"涂布大面防水涂料",{"key":30,"text":145,"correct":22},"铺贴大面胎体增强材料",{"id":147,"libraryId":5,"type":72,"typeLabel":73,"stem":148,"options":149,"answer":79,"analysis":33},1269703,"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头。",[150,151],{"key":20,"text":77,"correct":22},{"key":24,"text":79,"correct":32},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1269704,"下列关于常用人工地基处理方法的适用范围的说法中，不正确的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"换土垫层法适用于地下水位较低，基槽经常处于较干燥状态下的一般黏性土地基的加固",{"key":24,"text":159,"correct":32},"重锤夯实法适用于处理碎石土、砂土、低饱和度的黏性土、粉土、湿陷性黄土及填土地基等的深层加固",{"key":27,"text":161,"correct":22},"深层搅拌法适于加固较深、较厚的淤泥、淤泥质土、粉土和承载力不大于0.12MPa的饱和黏土和软黏土、沼泽地带的泥炭土等地基",{"key":30,"text":163,"correct":22},"灰土挤密桩适用于处理地下水位以上、天然含水量12%～25%、厚度5～15m的素填土、杂填土、湿陷性黄土以及含水率较大的软弱地基等",{"id":165,"libraryId":5,"type":72,"typeLabel":73,"stem":166,"options":167,"answer":77,"analysis":33},1269705,"涂膜防水屋面保护层采用水泥砂浆或块材时，应在涂膜层与保护层之间设置隔离层。（ ）",[168,169],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":171,"libraryId":5,"type":72,"typeLabel":73,"stem":172,"options":173,"answer":77,"analysis":33},1269706,"土方边坡用边坡坡度和坡系数表示，两者互为倒数，工程中常以h：b表示坡度。",[174,175],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1269707,"具有“后退向下，强制切土”挖土特点的土方机械是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"正铲",{"key":24,"text":183,"correct":32},"反铲",{"key":27,"text":185,"correct":22},"拉铲",{"key":30,"text":187,"correct":22},"抓铲",{"id":189,"libraryId":5,"type":72,"typeLabel":73,"stem":190,"options":191,"answer":77,"analysis":33},1269708,"常用落地式脚手架构件有钢管、扣件、脚手板、底座、安全网，并由立杆、纵向水平杆、横向水平杆、剪刀撑、水平斜拉杆、纵横向水平扫地杆构造而成。",[192,193],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},1269709,"下列各项中不属于基坑排水与降水的是（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"地面水排除",{"key":24,"text":201,"correct":32},"基坑截水",{"key":27,"text":203,"correct":22},"基坑排水",{"key":30,"text":205,"correct":22},"基坑降水",{"id":207,"libraryId":5,"type":72,"typeLabel":73,"stem":208,"options":209,"answer":77,"analysis":33},1269710,"砌块当竖缝宽度大于或等于150mm，或楼层不是砌块加灰缝的整数倍时，都要用黏土砖镶砌。（ ）",[210,211],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},1269711,"防水混凝土底板与墙体的水平施工缝应留在（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"底板下表面处",{"key":24,"text":219,"correct":22},"底板上表面处",{"key":27,"text":221,"correct":32},"距底板上表面不小于300mm的墙体上",{"key":30,"text":223,"correct":22},"距孔洞边缘不少于100mm处",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1269712,"下列关于掺防水剂水泥砂浆防水施工的说法中，错误的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"施工工艺流程为：找平层施工→防水层施工→质量检查",{"key":24,"text":231,"correct":32},"当施工采用抹压法时，先在基层涂刷一层1:0.4的水泥浆，随后分层铺抹防水砂浆，每层厚度为10～15mm，总厚度不小于30mm",{"key":27,"text":233,"correct":22},"氯化铁防水砂浆施工时，底层防水砂浆抹完12h后，抹压面层防水砂浆，其厚13mm分两遍抹压",{"key":30,"text":235,"correct":22},"防水层施工时的环境温度为5～35℃",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":27,"analysis":33},1269713,"下列各项中不属于深基坑土方开挖方案的是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"放坡挖土",{"key":24,"text":243,"correct":22},"中心岛（墩）式挖土",{"key":27,"text":245,"correct":32},"箱式挖土",{"key":30,"text":247,"correct":22},"盆式挖土",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":27,"analysis":33},1269714,"高强度螺栓的拧紧问题说法错误的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"高强度螺栓连接的拧紧应分为初拧、终拧",{"key":24,"text":255,"correct":22},"对于大型节点应分为初拧、复拧、终拧",{"key":27,"text":257,"correct":32},"复拧扭矩应当大于初拧扭矩",{"key":30,"text":259,"correct":22},"扭剪型高强度螺栓拧紧时对螺母施加顺时针力矩",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1269715,"施工缝一般应留在构件（ ）部位。",[264,266,268,270],{"key":20,"text":265,"correct":22},"受压最小",{"key":24,"text":267,"correct":32},"受剪最小",{"key":27,"text":269,"correct":22},"受弯最小",{"key":30,"text":271,"correct":22},"受扭最小",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1269716,"“流砂”现象产生的原因是由于（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"地面水流动的作用",{"key":24,"text":279,"correct":32},"地下水动水压力大于或等于土的浸水密度",{"key":27,"text":281,"correct":22},"土方开挖的作用",{"key":30,"text":283,"correct":22},"基坑降水不当",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1269717,"当混凝土分层浇筑到模板高度的（ ），且第一层混凝土的强度达到出模强度时，方可进行初滑。",[288,290,292,294],{"key":20,"text":289,"correct":22},"1\u002F3",{"key":24,"text":291,"correct":32},"2\u002F3",{"key":27,"text":293,"correct":22},"3\u002F4",{"key":30,"text":295,"correct":22},"1\u002F2",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},1269718,"钢结构的连接方法不包括（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":32},"绑扎连接",{"key":24,"text":303,"correct":22},"焊接",{"key":27,"text":305,"correct":22},"螺栓连接",{"key":30,"text":307,"correct":22},"铆钉连接",{"id":309,"libraryId":5,"type":72,"typeLabel":73,"stem":310,"options":311,"answer":77,"analysis":33},1269719,"高强度螺栓按形状不同分为：大六角头型高强度螺栓和扭剪型高强度螺栓。",[312,313],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},1269720,"钢结构的涂装环境温度应符合涂料产品说明书的规定，说明书若无规定时，环境温度应控制在（ ）之间。",[318,320,322,324],{"key":20,"text":319,"correct":22},"4～38℃",{"key":24,"text":321,"correct":22},"4～40℃",{"key":27,"text":323,"correct":32},"5～38℃",{"key":30,"text":325,"correct":22},"5～40℃",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},1269721,"卷扬机使用时，必须用（ ）予以固定，以防止工作时产生滑动造成倾覆。",[330,332,334,336],{"key":20,"text":331,"correct":22},"木桩",{"key":24,"text":333,"correct":22},"钢筋混凝土桩",{"key":27,"text":335,"correct":32},"地锚",{"key":30,"text":337,"correct":22},"锚杆",{"id":339,"libraryId":5,"type":72,"typeLabel":73,"stem":340,"options":341,"answer":77,"analysis":33},1269722,"砌块上下皮错缝搭接长度一般为砌块长度的1\u002F2（较短的砌块必须满足这个要求），或不得小于砌块皮高的1\u002F3。（ ）",[342,343],{"key":20,"text":77,"correct":32},{"key":24,"text":79,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":30,"analysis":33},1269723,"热熔法施工时，待卷材底面热熔后立即滚铺，并（ ）等工序。",[348,350,352,353],{"key":20,"text":349,"correct":22},"采取搭接法铺贴卷材",{"key":24,"text":351,"correct":22},"应采用胶粘剂粘结卷材与基层",{"key":27,"text":141,"correct":22},{"key":30,"text":354,"correct":32},"进行排气辊压",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1269724,"下列关于毛石砌体施工工艺的基本规定中，错误的是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":32},"毛石料和粗石料砌体的灰缝厚度不宜大于10mm，细石料砌体的灰缝厚度不宜小于10mm",{"key":24,"text":362,"correct":22},"施工工艺流程为：施工准备→试排撂底→砌筑毛石（同时搅拌砂浆）→勾缝→检验评定",{"key":27,"text":364,"correct":22},"每日砌筑高度不宜超过1.2m，在转角处及交接处应同时砌筑，如不能同时砌筑时，应留斜槎",{"key":30,"text":366,"correct":22},"毛石挡土墙一般按3～4皮为一个分层高度砌筑，每砌一个分层高度应找平一次",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},1269725,"多立杆脚手架的立杆与纵、横向扫地杆的连接应用（ ）固定。",[371,373,375,377],{"key":20,"text":372,"correct":32},"直角扣件",{"key":24,"text":374,"correct":22},"旋转扣件",{"key":27,"text":376,"correct":22},"对接扣",{"key":30,"text":378,"correct":22},"承插件",{"id":380,"libraryId":5,"type":72,"typeLabel":73,"stem":381,"options":382,"answer":79,"analysis":33},1269726,"搅拌时间是指从原材料全部投入搅拌筒时起，到全部卸出时为止所经历的时间。（ ）",[383,384],{"key":20,"text":77,"correct":22},{"key":24,"text":79,"correct":32},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1269727,"施工项目成本控制的方法中，偏差分析可采用不同的方法，常用的有横道图法、（ ）和曲线法。",[389,391,393,395],{"key":20,"text":390,"correct":22},"比率法",{"key":24,"text":392,"correct":32},"表格法",{"key":27,"text":394,"correct":22},"比较法",{"key":30,"text":396,"correct":22},"差额法",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},1269728,"下列措施中，不属于施工准备阶段的安全技术措施的是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"技术准备",{"key":24,"text":404,"correct":22},"物资准备",{"key":27,"text":406,"correct":32},"资金准备",{"key":30,"text":408,"correct":22},"施工队伍准备",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":30,"analysis":33},1269729,"下列不属于施工项目生产要素的是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"劳动力",{"key":24,"text":416,"correct":22},"材料",{"key":27,"text":418,"correct":22},"技术",{"key":30,"text":420,"correct":32},"信息",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":30,"analysis":33},1269730,"某高校教学楼工程项目经理，在建立项目组织机构时采用了线性组织结构模式。该项目组织结构的特点是（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"可能有多个矛盾的指令源",{"key":24,"text":428,"correct":22},"有横向和纵向两个指令源",{"key":27,"text":430,"correct":22},"能促进管理专业化分工",{"key":30,"text":432,"correct":32},"每个工作部门只接受一个上级的直接领导",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":30,"analysis":33},1269731,"以下选项不是限额领料形式的是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"按分项工程实行限额领料",{"key":24,"text":440,"correct":22},"按工程部位实行限额领料",{"key":27,"text":442,"correct":22},"按单位工程实行限额领料",{"key":30,"text":444,"correct":32},"按工程进度实行限额领料",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":30,"analysis":33},1269732,"某单位拟建设1栋8000m2的职工宿舍楼，某建设公司参加了投标。在编制投标文件过程中确立了项目组织机构，采用线性组织结构模式。这种组织系统的特点是（ ）。",[449,451,453,454],{"key":20,"text":450,"correct":22},"没有相互矛盾的指令源",{"key":24,"text":452,"correct":22},"有纵向和横向的指令源",{"key":27,"text":426,"correct":22},{"key":30,"text":455,"correct":32},"指令源唯一",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},1269733,"在编制项目管理任务分工表前，应结合项目的特点，对项目实施各阶段的费用控制、进度控制、质量控制、（ ）、信息管理和组织与协调等管理任务进行详细分解。",[460,462,464,466],{"key":20,"text":461,"correct":32},"合同管理",{"key":24,"text":463,"correct":22},"人员管理",{"key":27,"text":465,"correct":22},"财务管理",{"key":30,"text":467,"correct":22},"材料管理",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":27,"analysis":33},1269734,"下列选项中，不属于建立施工项目经理部的基本原则的是（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":22},"根据所设计的项目组织形式设置",{"key":24,"text":475,"correct":22},"适应现场施工的需要",{"key":27,"text":477,"correct":32},"满足建设单位关于施工项目目标控制的要求",{"key":30,"text":479,"correct":22},"根据施工工程任务需要调整",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},1269735,"进度控制的技术措施主要不包括：（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":32},"建立图纸审查、及时办理工程变更和设计变更手续的措施",{"key":24,"text":487,"correct":22},"组织流水作业，保证作业连续、均衡、有节奏",{"key":27,"text":489,"correct":22},"采用电子计算机控制进度的措施",{"key":30,"text":491,"correct":22},"采用先进高效的技术和设备。",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},1269736,"下列关于施工项目管理组织的形式的说法中，错误的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"工作队式项目组织适用于大型项目，工期要求紧，要求多工种、多部门配合的项目",{"key":24,"text":499,"correct":22},"事业部式适用于大型经营型企业的工程承包",{"key":27,"text":501,"correct":32},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":30,"text":503,"correct":22},"矩阵制项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},1269737,"施工项目人力资源管理的关键在于（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":32},"制定合理的人力资源计划、编制工种需要计划，必要时进行调整",{"key":24,"text":511,"correct":22},"做好劳务合同管理",{"key":27,"text":513,"correct":22},"做好劳动力的动态管理",{"key":30,"text":515,"correct":22},"做好现场的资源供应",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":27,"analysis":33},1269738,"一般情况下，不管采取哪些措施，都会（ ）费用。因此，在调整施工进度计划时应利用费用优化的原理选择费用（ ）的关键工作作为压缩对象。",[520,522,524,526],{"key":20,"text":521,"correct":22},"减少，增加最少",{"key":24,"text":523,"correct":22},"增加，减少最少",{"key":27,"text":525,"correct":32},"增加，增加最少",{"key":30,"text":527,"correct":22},"减少，增加最多",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":30,"analysis":33},1269739,"某建设工程项目经理部根据目标动态控制原理，将项目目标进行了分解，那么在项目目标实施过程中，首先应进行的工作是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"确定目标控制的计划值",{"key":24,"text":535,"correct":22},"定期比较目标的计划值与实际值",{"key":27,"text":537,"correct":22},"分析比较结果，采取纠偏措施",{"key":30,"text":539,"correct":32},"收集目标的实际完成值",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":27,"analysis":33},1269740,"下列不属于施工项目管理任务的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"施工安全管理",{"key":24,"text":547,"correct":22},"施工质量控制",{"key":27,"text":549,"correct":32},"施工人力资源管理",{"key":30,"text":551,"correct":22},"施工合同管理",[553,556,559,562,565,568],{"id":15,"name":554,"category":7,"favorite":555},"领导干部任职前廉政法规知识测试题",92,{"id":557,"name":558,"category":7,"favorite":15},595,"建筑结构与设备",{"id":560,"name":561,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":563,"name":564,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":566,"name":567,"category":7,"favorite":8},534,"BIM工程师",{"id":569,"name":567,"category":7,"favorite":8},535]