[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-857-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":380},{"id":5,"name":6,"category":7,"favorite":8},857,"(土建质量)基础知识","建筑工程",0,6,50,1275,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,278,290,302,308,320,332,344,356,368],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1269641,3,"判断题","混凝土自高处倾落的自由高度不应超过3m,在竖向结构中限制自由倾落高度不宜超过4m，否则应沿串筒、斜相、溜管或振动溜管等下料。（ ）",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1269642,"柱钢筋绑扎的施工工艺流程为：调整插筋位置，套入箍筋→立柱子四个角的主筋→立柱内其余主筋→绑扎钢筋接头→将主骨架钢筋绑扎成形。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1269643,"皮数杆一般立于房屋的四大角、内外墙交接处、楼梯间以及洞口多的洞口。一般可每隔5～10m立一根。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1269644,"从建筑施工的角度，根据土的开挖难易程度（坚硬程度），将土分为松软土、普通土、坚土、砂砾坚土、软石、次坚石、坚石、特坚石共8类土。（ ）",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1269645,"土方回填压实的施工工艺流程：填方土料处理→基底处理→分层回填压实→对每层回填土的质量进行检验，符合设计要求后，填筑上一层。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1269646,"钢结构在形成空间刚度单元后，对柱底板和基础顶面的空隙浇灌可暂缓进行。（ ）",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1269647,"一般抹灰等级可分为基础抹灰和高级抹灰。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1269648,"普通土的现场鉴别方法为：用镐挖掘。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1269649,"一般抹灰的施工工艺流程为：基层处理→阳角做护角→找规矩做灰饼、标筋→抹底层灰、中层灰、面层灰。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1269650,"钢筋混凝土扩展基础施工工艺流程：测量放线→基坑开挖、验槽→混凝土垫层施工→支基础模板→钢筋绑扎→浇基础混凝土。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1269651,"“后浇带”是在现浇钢筋混凝土结构中，在施工期间留设的临时性的温度和收缩变形预置设施。（ ）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1269652,"热熔法施工是采用火焰加热器熔化热熔型防水卷材底面的热熔胶进行粘结的施工方法。（ ）",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1269653,"皮数杆是指在其上划有每皮砖和砖缝厚度，以及门窗洞口、过梁、楼板、预埋件等标高位置的一种木制标杆。（ ）",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1269654,"锚具是锚固后张法预应力钢筋、钢丝或钢绞线的一种工具，它锚固在构件端部，并与构件一起共同受力，且永久性留在构件中。（ ）",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1269655,"一般抹灰施工的施工顺序应遵循“先室外后室内、先上后下、先顶棚后墙地”的原则。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1269656,"喷涂涂料时，喷枪的压力宜控制在0.4～0.8MPa之间。（ ）",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1269657,"混合砂浆具有较好的和易性，尤其是保水性，常用来砌筑地面以上的砖石砌体。（ ）",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1269658,"放坡开挖是最经济的挖土方案，当基坑开挖深度不大（软土地基挖深不超过4m；地下水位低的图纸较好地区挖深亦可较大）周围环境又允许时，均可采用放坡开挖；放坡坡度按经验确定即可。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1269659,"根据预制桩入土受力方式又分为打入式和静力压桩式两种。在城市施工中，一半多采用静力桩。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1269660,"预制桩打桩过程中，如突然出现桩锤回弹，贯入度突增，锤击时桩弯曲、倾斜、颠动、桩顶破坏加剧等，则表明桩身可能被破坏或遇到了地下障碍。（ ）",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1269661,"钢筋套筒挤压连接的挤压顺序应从两端逐步向中间压接。（ ）",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1269662,"混凝土必须养护至其强度达到1.2MPa以上，才准在上面行人和架设支架、安装模板。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1269663,"扭剪型高强度螺栓连接副含一个螺栓、一个螺母、二个垫圈。（ ）",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1269664,"木地板地面空铺式一般用于平房、底层房屋或较潮湿地面以及地面敷设管道需要将木地板架空等情况。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1269665,"自然养护是指利用平均气温高于5℃的自然条件，用保水材料或草帘等对混凝土加以覆盖后适当浇水，使混凝土在一定的时间内在湿润状态下硬化。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1269666,"梁下、墙顶斜砖砌筑时，与梁的接触处待加气砖砌完两星期后采用灰砂砖斜砌顶紧。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1269667,"自落式搅拌机宜用于搅拌干硬性混凝土和轻骨料混凝土。（ ）",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1269668,"一般抹灰施工的顺序应遵循“先室内后室外、先上后下、先墙地后顶棚”的原则。（ ）",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1269669,"直角扣件用于两根任意交叉钢管的连接。（ ）",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1269670,"坚石和特坚石的现场鉴别方法都可以是用爆破方法。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1269671,"木门窗施工时，外门窗一般采用保湿砂浆或发泡胶将门窗框与洞口的缝隙塞实。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1269672,"井点管应布置在地下水流的上游一侧，两端适当加以延伸，延伸宽度宜不小于槽宽。（ ）",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1269673,"基坑（槽）开挖施工工艺流程：测量放线→切线分层开挖→排水、降水→修坡→留足预留土层→整平。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1269674,"常用的人工地基处理方法有换土垫层法、重锤表层夯实、强夯、振冲、砂桩挤密、深层搅拌、堆载预压、化学加固等方法。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1269675,"涂料的涂装遍数，涂层厚度均应符合设计要求。当设计时涂层厚度无要求时，建设单位可自定涂层厚度。（ ）",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1269676,"环状井点，有时亦可布置成”U”形，以利挖土机和运土车辆出人基坑。（ ）",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1269677,"进行钢结构安装时，要统一用哨声、红绿旗、手势等指挥，只要吊装指挥作业人员熟悉各种信号就可以了。（ ）",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1269678,"基坑开挖时不用经常对平面控制桩、水准点、基坑平面位置、水平标高、边坡坡度等复测检查。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1269679,"夹具是在先张法施工中，为保持预应力筋的张拉力并将其固定在张拉台座或设备上所使用的临时性锚固装置。（ ）",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1269680,"宽度小于1m的窗间墙，应选用整砖砌筑，半砖和破损的砖，应分散使用于墙心或受力较小部位。（ ）",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":264,"typeLabel":265,"stem":266,"options":267,"answer":273,"analysis":27},1269681,1,"单选题","从建筑施工的角度，根据土的（ ），可将土分为8大类。",[268,270,272,275],{"key":20,"text":269,"correct":22},"颗粒级配",{"key":24,"text":271,"correct":22},"沉积年代",{"key":273,"text":274,"correct":26},"C","坚硬程度",{"key":276,"text":277,"correct":22},"D","承载能力",{"id":279,"libraryId":5,"type":264,"typeLabel":265,"stem":280,"options":281,"answer":20,"analysis":27},1269682,"土方的开挖顺序、方法必须与设计工况相一致，并遵循开槽支撑，（ ）严禁超挖的原则。",[282,284,286,288],{"key":20,"text":283,"correct":26},"先撑后挖，分层开挖",{"key":24,"text":285,"correct":22},"先挖后撑，分层开挖",{"key":273,"text":287,"correct":22},"先撑后挖，分段开挖",{"key":276,"text":289,"correct":22},"先挖后撑，分段开挖",{"id":291,"libraryId":5,"type":264,"typeLabel":265,"stem":292,"options":293,"answer":273,"analysis":27},1269683,"下列关于涂料防水施工工艺的说法中，错误的是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"防水涂料防水层属于柔性防水层",{"key":24,"text":297,"correct":22},"一般采用外防外涂和外防内涂施工方法",{"key":273,"text":299,"correct":26},"其施工工艺流程为：找平层施工→保护层施工→防水层施工→质量检查",{"key":276,"text":301,"correct":22},"找平层有水泥砂浆找平层、沥青砂浆找平层、细石混凝土找平层三种",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":21,"analysis":27},1269684,"主排水沟最好设置在施工区域的边缘或道路的两旁，一般排水沟的横断面不应小于0.5m×0.5m，纵向坡度不应小于2‰。",[306,307],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":309,"libraryId":5,"type":264,"typeLabel":265,"stem":310,"options":311,"answer":273,"analysis":27},1269685,"跨度为6m、混凝土强度为C30的现浇混凝土板，当混凝土强度至少应达到（ ）时方可拆除模板。",[312,314,316,318],{"key":20,"text":313,"correct":22},"15N\u002Fmm2",{"key":24,"text":315,"correct":22},"21N\u002Fmm2",{"key":273,"text":317,"correct":26},"22.5N\u002Fmm2",{"key":276,"text":319,"correct":22},"30N\u002Fmm2",{"id":321,"libraryId":5,"type":264,"typeLabel":265,"stem":322,"options":323,"answer":276,"analysis":27},1269686,"开始浇筑柱子时，底部应先浇筑一层厚（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"5、10mm相同成分的细石混凝土",{"key":24,"text":327,"correct":22},"5、10mm相同成分的水泥砂浆或水泥浆",{"key":273,"text":329,"correct":22},"50、100mm相同成分的细石混凝土",{"key":276,"text":331,"correct":26},"50、100mm相同成分的水泥砂浆或水泥浆",{"id":333,"libraryId":5,"type":264,"typeLabel":265,"stem":334,"options":335,"answer":20,"analysis":27},1269687,"在用高强度螺栓进行钢结构安装中，（ ）是目前被广泛采用的基本连接形式。",[336,338,340,342],{"key":20,"text":337,"correct":26},"摩擦型连接",{"key":24,"text":339,"correct":22},"摩擦一承压型连接",{"key":273,"text":341,"correct":22},"承压型连接",{"key":276,"text":343,"correct":22},"张拉型连接",{"id":345,"libraryId":5,"type":264,"typeLabel":265,"stem":346,"options":347,"answer":20,"analysis":27},1269688,"打桩时宜采用（ ）的方式，方可取得良好的效果。",[348,350,352,354],{"key":20,"text":349,"correct":26},"“重锤低击，低提重打”",{"key":24,"text":351,"correct":22},"“轻锤高击，高提重打”",{"key":273,"text":353,"correct":22},"“轻锤低击，低提轻打”",{"key":276,"text":355,"correct":22},"“重锤高击，高提重打”",{"id":357,"libraryId":5,"type":264,"typeLabel":265,"stem":358,"options":359,"answer":20,"analysis":27},1269689,"下列关于防水砂浆防水层施工的说法中，正确的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"砂浆防水工程是利用一定配合比的水泥浆和水泥砂浆（称防水砂浆）分层分次施工，相互交替抹压密实的封闭防水整体",{"key":24,"text":363,"correct":22},"防水砂浆防水层的背水面基层的防水层采用五层做法，迎水面基层的防水层采用四层做法",{"key":273,"text":365,"correct":22},"防水层每层应连续施工，素灰层与砂浆层可不在同一天施工完毕",{"key":276,"text":367,"correct":22},"揉浆是使水泥砂浆素灰相互渗透结合牢固，既保护素灰层又起到防水作用，当揉浆难时，允许加水稀释",{"id":369,"libraryId":5,"type":264,"typeLabel":265,"stem":370,"options":371,"answer":24,"analysis":27},1269690,"冷粘法是指用（ ）粘贴卷材的施工方法。",[372,374,376,378],{"key":20,"text":373,"correct":22},"喷灯烘烤",{"key":24,"text":375,"correct":26},"胶粘剂",{"key":273,"text":377,"correct":22},"热沥青胶",{"key":276,"text":379,"correct":22},"卷材上的自粘胶",[381,384,387,390,393,396],{"id":264,"name":382,"category":7,"favorite":383},"领导干部任职前廉政法规知识测试题",92,{"id":385,"name":386,"category":7,"favorite":264},595,"建筑结构与设备",{"id":388,"name":389,"category":7,"favorite":264},715,"招标采购专业知识与法律法规",{"id":391,"name":392,"category":7,"favorite":264},848,"市政方向-通用基础",{"id":394,"name":395,"category":7,"favorite":8},534,"BIM工程师",{"id":397,"name":395,"category":7,"favorite":8},535]