[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-857-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},857,"(土建质量)基础知识","建筑工程",0,5,50,1275,[13,34,46,58,70,82,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,521,533,545,557,569,581,593,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1269591,1,"单选题","下列各项中，关于钢筋连接的基本规定不正确的说法是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","钢筋的连接可分为绑扎连接、焊接和机械连接三种",false,{"key":24,"text":25,"correct":22},"B","在任何情况下，纵向受拉钢筋绑扎搭接接头的搭设长度不应小于300mm，纵向受压钢筋的搭接长度不应小于200mm",{"key":27,"text":28,"correct":22},"C","钢筋机械连接有钢筋套筒挤压连接、钢筋锥螺纹套筒连接、钢筋镦粗直螺纹套筒连接、钢筋滚压直螺纹套筒连接",{"key":30,"text":31,"correct":32},"D","当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1269592,"吊顶工程的吊杆长度大于（ ）米时，应设置反向支撑。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1",{"key":24,"text":41,"correct":32},"1.5",{"key":27,"text":43,"correct":22},"2",{"key":30,"text":45,"correct":22},"3",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1269593,"钢结构涂装后至少在（ ）内应保护，免受雨淋。",[50,52,54,56],{"key":20,"text":51,"correct":22},"1h",{"key":24,"text":53,"correct":22},"2h",{"key":27,"text":55,"correct":22},"3h",{"key":30,"text":57,"correct":32},"4h",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1269594,"砌块砌筑施工的工艺顺序是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"铺灰、砌块安装就位、镶砖、灌缝、校正",{"key":24,"text":65,"correct":22},"铺灰、镶砖、砌块安装就位、灌缝、校正",{"key":27,"text":67,"correct":22},"铺灰、砌块安装就位、灌缝、校正、镶砖",{"key":30,"text":69,"correct":32},"铺灰、砌块安装就位、校正、灌缝、镶砖",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1269595,"下列焊接方法中，不属于钢结构工程常用的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"自动（半自动）埋弧焊",{"key":24,"text":77,"correct":32},"闪光对焊",{"key":27,"text":79,"correct":22},"药皮焊条手工电弧焊",{"key":30,"text":81,"correct":22},"气体保护焊",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1269596,"抹灰工程应分层进行，一般抹灰分（ ）层。",[86,87,88,89],{"key":20,"text":39,"correct":22},{"key":24,"text":43,"correct":22},{"key":27,"text":45,"correct":32},{"key":30,"text":90,"correct":22},"4",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":33},1269597,"下列各项中，不属于混凝土工程施工内容的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"混凝土拌合料的制备",{"key":24,"text":98,"correct":22},"混凝土拌合料的养护",{"key":27,"text":100,"correct":32},"混凝土拌合料的强度测定",{"key":30,"text":102,"correct":22},"混凝土拌合料的振捣",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1269598,"在涂膜防水屋面施工的工艺流程中，喷涂基层处理剂后，紧跟的工作是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":32},"节点部位增强处理",{"key":24,"text":110,"correct":22},"表面基层清理",{"key":27,"text":112,"correct":22},"涂布大面防水涂料",{"key":30,"text":114,"correct":22},"铺贴大屋面胎体增强材料",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":30,"analysis":33},1269599,"改善砂浆和易性，砖应隔夜浇水，严禁干砖砌筑，铺灰长度不得超过500mm，宜采用“”砌砖法进行砌筑。这是预防（ ）质量问题的有效措施。",[119,121,123,125],{"key":20,"text":120,"correct":22},"砂浆强度偏低、不稳定",{"key":24,"text":122,"correct":22},"砂浆和易性差、沉底结硬",{"key":27,"text":124,"correct":22},"砌体组砌方法错误",{"key":30,"text":126,"correct":32},"灰缝砂浆不饱满",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":27,"analysis":33},1269600,"下列选项中不属于常用施涂方法的是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"刷涂",{"key":24,"text":134,"correct":22},"滚涂",{"key":27,"text":136,"correct":32},"甩涂",{"key":30,"text":138,"correct":22},"喷涂",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},1269601,"当混凝土小型空心砌块砌体的竖向灰缝宽度为（ ）时，应采用C20以上的细石混凝土填实。",[143,145,147,149],{"key":20,"text":144,"correct":22},"15～120mm",{"key":24,"text":146,"correct":22},"20～130mm",{"key":27,"text":148,"correct":32},"30～1150mm",{"key":30,"text":150,"correct":22},"150～1300mm",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1269602,"钢结构构件的防腐施涂的刷涂法的施涂顺序一般为（ ）先左后右、先内后外。",[155,157,159,161],{"key":20,"text":156,"correct":32},"先上后下、先难后易",{"key":24,"text":158,"correct":22},"先上后下、先易后难",{"key":27,"text":160,"correct":22},"先下后上、先难后易",{"key":30,"text":162,"correct":22},"先下后上、先易后难",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":30,"analysis":33},1269603,"填土的密度常以设计规定的（ ）作为控制标准。",[167,169,171,173],{"key":20,"text":168,"correct":22},"可松性系数",{"key":24,"text":170,"correct":22},"孔隙率",{"key":27,"text":172,"correct":22},"渗透系数",{"key":30,"text":174,"correct":32},"压实系数",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1269604,"抹底层灰的作用是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":32},"保证与墙面粘贴牢固",{"key":24,"text":182,"correct":22},"保证抹灰层平整",{"key":27,"text":184,"correct":22},"美观",{"key":30,"text":186,"correct":22},"经济",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1269605,"能有效防止钢材焊接冷裂纹的方法是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":32},"焊前预热",{"key":24,"text":194,"correct":22},"焊后速冷",{"key":27,"text":196,"correct":22},"焊后缓冷",{"key":30,"text":198,"correct":22},"焊后热处理",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},1269606,"当日平均气温降到（ ）以下时，混凝土工程必须采取冬期施工技术措施。",[203,205,207,209],{"key":20,"text":204,"correct":22},"0℃",{"key":24,"text":206,"correct":22},"-2℃",{"key":27,"text":208,"correct":32},"5℃",{"key":30,"text":210,"correct":22},"10℃",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":27,"analysis":33},1269607,"混凝土构件的施工缝的留设位置不正确的是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"柱应留在基础的顶面、梁或吊车梁牛腿的下面、无梁楼盖柱帽的下面",{"key":24,"text":218,"correct":22},"双向受力板、拱、薄壳应按设计要求留设",{"key":27,"text":220,"correct":32},"单向板留置在平行于板的长边任何位置",{"key":30,"text":222,"correct":22},"有主次梁的留置在次梁跨中的1\u002F3范围内",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":33},1269608,"大体积混凝土浇筑时，若结构的长度超过厚度3倍时，可采用（ ）的浇筑方案。",[227,229,231,233],{"key":20,"text":228,"correct":22},"全面分层",{"key":24,"text":230,"correct":22},"分段分层",{"key":27,"text":232,"correct":32},"斜面分层",{"key":30,"text":234,"correct":22},"分部分层",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},1269609,"下列关于水泥砂浆地面施工的说法中，有误的是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"在现浇混凝土或水泥砂浆垫层、找平层上做水泥砂浆地面面层时，其抗压强度达到1.2MPa，才能铺设面层",{"key":24,"text":242,"correct":32},"地面抹灰前，应先在四周墙上1200mm处弹出一道水平基准线，作为确定水泥砂浆面层标高的依据",{"key":27,"text":244,"correct":22},"铺抹水泥砂浆面层前，先将基层浇水湿润，刷一道素水泥浆结合层，并随刷随抹",{"key":30,"text":246,"correct":22},"水泥砂浆面层施工完毕后，要及时进行浇水养护啊，必要时可蓄水养护，养护时间不少于7d，强度等级应不小于15MPa",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},1269610,"砌砖墙留斜槎时，斜槎长度不应小于高度的（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"1\u002F2",{"key":24,"text":254,"correct":22},"1\u002F3",{"key":27,"text":256,"correct":32},"2\u002F3",{"key":30,"text":258,"correct":22},"1\u002F4",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},1269611,"粘贴高聚物改性沥青防水卷材使用最多的是（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"热粘结剂法",{"key":24,"text":266,"correct":32},"热熔法",{"key":27,"text":268,"correct":22},"冷粘法",{"key":30,"text":270,"correct":22},"自粘法",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},1269612,"适用于处理碎石土、砂土、低饱和度的黏性土、粉土、湿陷性黄土及填土地基等的深层加固方法是（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":32},"强夯法",{"key":24,"text":278,"correct":22},"重锤夯实法",{"key":27,"text":280,"correct":22},"挤密桩法",{"key":30,"text":282,"correct":22},"砂石桩法",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},1269613,"下列关于木门窗施工工艺的说法中，正确的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":32},"木门窗施工的施工工艺流程为：找规矩弹线→安装门窗框→门窗框嵌缝→安装门窗扇→安装五金（玻璃）→成品保护",{"key":24,"text":290,"correct":22},"门窗安装前，应在离楼地面900mm高的墙面上测弹一条水平控制线",{"key":27,"text":292,"correct":22},"外门窗一般采用与墙面抹灰相同的砂浆将门窗框与洞口的缝隙塞实",{"key":30,"text":294,"correct":22},"安装门窗扇时，将扇放入框中试装合格后，按扇高的1\u002F10～1\u002F14，在框上按合页大小画线，并剔出合页槽，槽深一定要与合页厚度相适应，槽底要平",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":27,"analysis":33},1269614,"下列关于陶瓷地砖楼地面施工的说法中，正确的是（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"湿贴法主要适用于地砖尺寸在500mm×500mm以下的小地砖的铺贴",{"key":24,"text":302,"correct":22},"干贴法应首先在地面上用1:2的干硬性水泥砂浆铺一层厚度为20～50mm的垫层",{"key":27,"text":304,"correct":32},"铺贴前应先进行试拼，试拼后按顺序排列，编号，浸水备用",{"key":30,"text":306,"correct":22},"铺完砖24h后洒水养护，时间不得少于14d",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":30,"analysis":33},1269615,"下列关于卷材防水施工的说法中，有误的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"铺设防水卷材前应涂刷基层处理剂，基层处理剂应采用与卷材性能配套（相容）的材料，或采用同类涂料的底子油",{"key":24,"text":314,"correct":22},"铺贴高分子防水卷材时，切忌拉伸过紧，以免使卷材长期处在受拉应力状态，易加速卷材老化",{"key":27,"text":316,"correct":22},"施工工艺流程为：找平层施工→防水层施工→保护层施工→质量检查",{"key":30,"text":318,"correct":32},"卷材搭接接缝口应采用宽度不小于20mm的密封材料封严，以确保防水层的整体防水性能",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},1269616,"混凝土必须养护至其强度达到（ ）时，才能够在其上行人或安装模板支架",[323,325,327,329],{"key":20,"text":324,"correct":32},"1.2MPa",{"key":24,"text":326,"correct":22},"1.8MPa",{"key":27,"text":328,"correct":22},"2.4MPa",{"key":30,"text":330,"correct":22},"3MPa",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1269617,"关于打桩质量控制，下列说法错误的是（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"桩尖所在土层较硬时，以贯入度控制为主",{"key":24,"text":338,"correct":32},"桩尖所在土层较软时，以贯入度控制为主",{"key":27,"text":340,"correct":22},"桩尖所在土层较硬时，以桩尖设计标高控制为辅",{"key":30,"text":342,"correct":22},"桩尖所在土层较软时，以桩尖设计标高控制为主",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":30,"analysis":33},1269618,"下面防治流砂的方法中，（ ）是根除流砂的最有效的方法。",[347,349,351,353],{"key":20,"text":348,"correct":22},"水下挖土法",{"key":24,"text":350,"correct":22},"打钢板桩法",{"key":27,"text":352,"correct":22},"土壤冻结法",{"key":30,"text":354,"correct":32},"井点降水法",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1269619,"下列关于一般抹灰工程施工要点的说法中，错误的是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":32},"对表面光滑的基层进行“毛化处理”时，常在浇水湿润后，用1:2水泥细砂浆喷洒墙面",{"key":24,"text":362,"correct":22},"与人、物经常接触的阳角部位，不论设计有无规定，都需要做护角，并用水泥浆捋出小圆角",{"key":27,"text":364,"correct":22},"底层灰6～7成干（用手指按压有指印但不软）时即可抹中层灰。操作时一般按自上而下、从左向右的顺序进行",{"key":30,"text":366,"correct":22},"阳角护角无设计要求时，采用1:2水泥砂浆做暗护角，其高度不应低于2m，每侧宽度不应小于50mm",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":30,"analysis":33},1269620,"下列各项中，关于钢筋安装的基本规定正确的说法是（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"钢筋绑扎用的22号钢丝只用于绑扎直径14mm以下的钢筋",{"key":24,"text":374,"correct":22},"基础底板采用双层钢筋网时，在上层钢筋网下面每隔1.5m放置一个钢筋撑脚",{"key":27,"text":376,"correct":22},"基础钢筋绑扎的施工工艺流程为：清理垫层、画线→摆放下层钢筋，并固定绑扎→摆放钢筋撑脚（双层钢筋时）→绑扎柱墙预留钢筋→绑扎上层钢筋",{"key":30,"text":378,"correct":32},"控制混凝土保护层用的水泥砂浆垫块或塑料卡的厚度，应等于保护层厚度",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1269621,"对钢结构构件进行涂饰时，（ ）适用于油性基料的涂料。",[383,385,387,389],{"key":20,"text":384,"correct":22},"弹涂法",{"key":24,"text":386,"correct":32},"刷涂法",{"key":27,"text":388,"correct":22},"擦拭法",{"key":30,"text":390,"correct":22},"喷涂法",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1269622,"下列关于土方回填压实的基本规定的各项中，错误的是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"对有密实度要求的填方，在夯实或压实之后，要对每层回填土的质量进行检验，一般采用环刀法（或灌砂法）取样测定",{"key":24,"text":398,"correct":32},"基坑和室内填土，每层按20～50㎡取样一组",{"key":27,"text":400,"correct":22},"场地平整填方，每层按400～900㎡取样一组",{"key":30,"text":402,"correct":22},"填方结束后应检查标高、边坡坡度、压实程度等",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":20,"analysis":33},1269623,"混凝土浇水养护的时间：对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土，不得少于（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":32},"7d",{"key":24,"text":410,"correct":22},"10d",{"key":27,"text":412,"correct":22},"5d",{"key":30,"text":414,"correct":22},"14d",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},1269624,"卫生间的防水基层必须用1：3的水泥砂浆找平，凡遇到阴、阳角处，要抹成半径不小于（ ）mm的小圆弧。",[419,421,423,425],{"key":20,"text":420,"correct":32},"10",{"key":24,"text":422,"correct":22},"20",{"key":27,"text":424,"correct":22},"30",{"key":30,"text":426,"correct":22},"40",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1269625,"钢结构安装时，螺栓的紧固顺序是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"从两边开始，对称向中间进行",{"key":24,"text":434,"correct":32},"从中间开始，对称向两边进行",{"key":27,"text":436,"correct":22},"C从一端开始，向另一端进行",{"key":30,"text":438,"correct":22},"从中间开始，向四周扩散",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1269626,"某混凝土梁的受拉钢筋图纸上原设计用2钢筋（HRB335），现准备用020钢筋（HRB335）代换，应按（ ）原则进行代换。",[443,445,447,449],{"key":20,"text":444,"correct":22},"钢筋强度相等",{"key":24,"text":446,"correct":32},"钢筋面积相等",{"key":27,"text":448,"correct":22},"钢筋面积不小于代换前的面积",{"key":30,"text":450,"correct":22},"钢筋受拉承载力设计值相等",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},1269627,"下列各项中，关于常见模板的种类、特性的基本规定不正确的说法是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"常见模板的种类有组合式模板、工具式模板两大类",{"key":24,"text":458,"correct":22},"爬升模板适用于现浇钢筋混凝土竖向（或倾斜）结构",{"key":27,"text":460,"correct":32},"飞模适用于小开间、小柱网、小进深的钢筋混凝土楼盖施工",{"key":30,"text":462,"correct":22},"组合式模板可事先按设计要求组拼成梁、柱、墙、楼板的大型模板，整体吊装就位，也可采用散支散拆方法",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1269628,"自然状态下的土，经过开挖后，其体积因松散而增加，以后虽经回填压实，仍不能恢复到原来的体积，这种性质称为（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"土的流动性",{"key":24,"text":470,"correct":32},"土的可松性",{"key":27,"text":472,"correct":22},"土的渗透性",{"key":30,"text":474,"correct":22},"土的结构性",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":27,"analysis":33},1269629,"钢筋混凝土预制桩制作时，达到（ ）的设计强度方可起吊。",[479,481,483,485],{"key":20,"text":480,"correct":22},"30％",{"key":24,"text":482,"correct":22},"40%",{"key":27,"text":484,"correct":32},"70%",{"key":30,"text":486,"correct":22},"100％",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},1269630,"下列关于预制桩施工的基本规定，正确的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":32},"静力压桩不宜用于地下有较多孤石、障碍物或有4m以上硬隔离层的情况",{"key":24,"text":494,"correct":22},"如遇特殊原因，压桩时可以不连续进行",{"key":27,"text":496,"correct":22},"静力压桩的施工工艺流程：测量放线→桩机就位、吊桩、插桩、桩身对中调直→静压沉桩→接桩→送桩、再静压沉桩→终止压桩→切割桩头",{"key":30,"text":498,"correct":22},"送桩时必须采用送桩器",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":33},1269631,"混凝土搅拌机按搅拌原理不同，可分为（ ）式和强制式两类。",[503,505,507,509],{"key":20,"text":504,"correct":22},"简易",{"key":24,"text":506,"correct":22},"附着",{"key":27,"text":508,"correct":32},"自落",{"key":30,"text":510,"correct":22},"便携",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},1269632,"生产效率较高的机械化焊接方法是（ ）。",[515,516,517,519],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":518,"correct":32},"埋弧焊",{"key":30,"text":520,"correct":22},"焊包括钨极氩弧焊",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1269633,"下列关于基坑（槽）开挖施工工艺的说法中，正确的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"采用机械开挖基坑时，为避免破坏基底土，应在标高以上预留15～50cm的土层由人工挖掘修整",{"key":24,"text":528,"correct":32},"在基坑（槽）四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下500mm，以利于土方开挖",{"key":27,"text":530,"correct":22},"雨期施工时，基坑（槽）需全段开挖，尽快完成",{"key":30,"text":532,"correct":22},"当基坑挖好后不能立即进行下道工序时，应预留30cm的土不挖，待下道工序开始再挖至设计标高",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":30,"analysis":33},1269634,"在梁板柱等结构的接缝和施工缝处，产生“烂根”的原因之一是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"混凝土强度偏低",{"key":24,"text":540,"correct":22},"养护时间不足",{"key":27,"text":542,"correct":22},"配筋不足",{"key":30,"text":544,"correct":32},"接缝处模板拼缝不严，漏浆",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1269635,"下列关于砌块砌体施工工艺的基本规定中，错误的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"灰缝厚度宜为15mm",{"key":24,"text":552,"correct":32},"灰缝要求横平竖直，水平灰缝应饱满，竖缝采用挤浆和加浆方法，允许用水冲洗清理灌缝",{"key":27,"text":554,"correct":22},"在墙体底部，在砌第一皮加气砖前，应用实心砖砌筑，其高度宜不小于200mm",{"key":30,"text":556,"correct":22},"与梁的接触处待加气砖砌完7d后采用灰砂砖斜砌顶紧",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1269636,"混凝土在运输时不应产生离析、分层现象，如有离析现象，则必须在浇筑混凝土前进行（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"加水",{"key":24,"text":564,"correct":32},"二次搅拌",{"key":27,"text":566,"correct":22},"二次配合比设计",{"key":30,"text":568,"correct":22},"振捣",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},1269637,"下列关于砖基础的施工工艺的基本规定，错误的是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"垫层混凝土在验槽后应随即浇灌，以保护地基",{"key":24,"text":576,"correct":22},"砖基础施工工艺流程：测量放线→基坑开挖、验槽→混凝土垫层施工→砖基础砌筑",{"key":27,"text":578,"correct":32},"砖基础中的洞口、管道、沟槽等，应在砌筑时正确留出，宽度超过900mm的洞口上方应砌筑平拱或设置过梁",{"key":30,"text":580,"correct":22},"基础砌筑前，应先检查垫层施工是否符合质量要求，在清扫垫层表面，将浮土及垃圾清除干净",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},1269638,"当屋面坡度小于3％时，沥青防水卷材的铺贴方向宜（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":32},"平行于屋脊",{"key":24,"text":588,"correct":22},"垂直于屋脊",{"key":27,"text":590,"correct":22},"与屋脊呈45°角",{"key":30,"text":592,"correct":22},"下层平行于屋脊，上层垂直于屋脊",{"id":594,"libraryId":5,"type":595,"typeLabel":596,"stem":597,"options":598,"answer":602,"analysis":33},1269639,3,"判断题","桩身混凝土强度等级不应低于C30，宜用机械搅拌，机械振捣，浇筑时应由桩尖向桩顶连续浇筑捣实，一次完成，严禁中断。（ ）",[599,601],{"key":20,"text":600,"correct":22},"正确",{"key":24,"text":602,"correct":32},"错误",{"id":604,"libraryId":5,"type":595,"typeLabel":596,"stem":605,"options":606,"answer":602,"analysis":33},1269640,"防水层每层应连续施工，素灰层与砂浆层允许不在同一天施工完毕。",[607,608],{"key":20,"text":600,"correct":22},{"key":24,"text":602,"correct":32},[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]