[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-857-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":734},{"id":5,"name":6,"category":7,"favorite":8},857,"(土建质量)基础知识","建筑工程",0,23,50,1275,[13,38,53,67,82,96,111,126,141,156,170,185,199,214,229,244,259,274,288,302,317,331,345,359,373,387,401,415,430,444,458,473,486,500,515,529,538,552,566,580,593,608,622,636,649,663,677,691,705,719],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1270494,2,"多选题","以下各项中不属于施工资源管理的任务的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","规划及报批施工用地",true,{"key":24,"text":25,"correct":26},"B","确定资源类型及数量",false,{"key":28,"text":29,"correct":26},"C","确定资源的分配计划",{"key":31,"text":32,"correct":22},"D","建立施工现场管理组织",{"key":34,"text":35,"correct":26},"E","施工资源进度计划的执行和动态调整","AD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1270495,"下列（ ）工作属于项目现场管理的内容。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"合理规划、使用施工现场用地",{"key":24,"text":45,"correct":22},"科学设计施工现场平面图",{"key":28,"text":47,"correct":22},"建立文明的施工现场",{"key":31,"text":49,"correct":26},"注重现场的安全生产管理",{"key":34,"text":51,"correct":22},"及时进行清场转移","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1270496,"将收集的资料整理和统计成与计划进度具有可比性的数据后，用实际进度与计划进度的比较方法进行比较分析。通常采用的比较方法有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"横道图比较法",{"key":24,"text":60,"correct":22},"S型曲线比较法",{"key":28,"text":62,"correct":22},"“香蕉”型曲线比较法",{"key":31,"text":64,"correct":26},"网络计划比较法",{"key":34,"text":66,"correct":22},"前锋线比较法",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1270497,"下列各项中，不属于施工项目管理的内容的是（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"建立施工项目管理组织",{"key":24,"text":74,"correct":22},"编制《施工项目管理目标责任书》",{"key":28,"text":76,"correct":26},"施工项目的生产要素管理",{"key":31,"text":78,"correct":22},"施工项目的施工情况的评估",{"key":34,"text":80,"correct":26},"施工项目的信息管理","BD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":81,"analysis":37},1270498,"下列关于施工项目目标控制的措施说法错误的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"建立完善的工程统计管理体系和统计制度属于信息管理措施",{"key":24,"text":89,"correct":22},"主要有组织措施、技术措施、合同措施、经济措施和管理措施",{"key":28,"text":91,"correct":26},"落实施工方案，在发生问题时，能适时调整工作之间的逻辑关系，加快实施进度属于技术措施",{"key":31,"text":93,"correct":22},"签订并实施关于工期和进度的经济承包责任制属于合同措施",{"key":34,"text":95,"correct":26},"落实各级进度控制的人员及其具体任务和工作责任属于组织措施",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1270499,"下列各部门中，不属于项目经理部可设置的是（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"经营核算部门",{"key":24,"text":103,"correct":26},"物质设备供应部门",{"key":28,"text":105,"correct":22},"设备检查检测部门",{"key":31,"text":107,"correct":26},"测试计量部门",{"key":34,"text":109,"correct":22},"企业工程管理部门","CE",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1270500,"施工安全技术交底的主要内容之一是做好“四口”、“五临边”的防护设施，其中“五临边”是指：未安栏杆的阳台周边上下跑道、斜道的两侧边以及（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"框架工程的楼层周边",{"key":24,"text":118,"correct":22},"卸料平台的外侧边",{"key":28,"text":120,"correct":26},"砖混工程的楼层周边",{"key":31,"text":122,"correct":26},"窗口外侧边",{"key":34,"text":124,"correct":22},"无外架防护的屋面周边","ABE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1270501,"现场进行质量检查的方法有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"目测法",{"key":24,"text":133,"correct":22},"实测法",{"key":28,"text":135,"correct":22},"试验检查",{"key":31,"text":137,"correct":26},"仪器测量",{"key":34,"text":139,"correct":26},"系统监测","ABC",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1270502,"其中影响施工质量的因素有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"人",{"key":24,"text":148,"correct":22},"材料",{"key":28,"text":150,"correct":22},"机械",{"key":31,"text":152,"correct":22},"工艺",{"key":34,"text":154,"correct":22},"环境","ABCDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":52,"analysis":37},1270503,"下列选项中，属于施工方项目管理的目标的是（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"施工的安全管理目标",{"key":24,"text":163,"correct":22},"施工的成本目标",{"key":28,"text":165,"correct":22},"施工的进度目标",{"key":31,"text":167,"correct":26},"施工的利润目标",{"key":34,"text":169,"correct":22},"施工的质量目标",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1270504,"施工项目管理具有（ ）特点。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"施工项目管理的主体是建筑企业",{"key":24,"text":177,"correct":26},"施工项目管理的主体是建设单位",{"key":28,"text":179,"correct":22},"施工项目管理的对象是施工项目",{"key":31,"text":181,"correct":22},"施工项目管理的内容是按阶段变化的",{"key":34,"text":183,"correct":22},"施工项目管理要求强化组织协调工作","ACDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":125,"analysis":37},1270505,"下列选项中，属于项目部设置的最基本的岗位的是（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"施工员",{"key":24,"text":192,"correct":22},"安全员",{"key":28,"text":194,"correct":26},"机械员",{"key":31,"text":196,"correct":26},"劳务员",{"key":34,"text":198,"correct":22},"测量员",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1270506,"施工方是承担施工任务的单位的总称谓，它可能是（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"施工总承包方",{"key":24,"text":206,"correct":22},"施工总承包管理方",{"key":28,"text":208,"correct":22},"分包施工方",{"key":31,"text":210,"correct":22},"施工劳务分包方",{"key":34,"text":212,"correct":26},"材料及设备供应方","ABCD",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1270507,"下列关于施工总承包管理方的说法中，正确的有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"施工总承包管理方主要进行施工的总体管理和协调",{"key":24,"text":221,"correct":26},"施工总承包管理方可与分包方和供货方直接签订施工合同",{"key":28,"text":223,"correct":22},"业主方可能会要求施工总承包管理方负责整个施工的招标发包工作",{"key":31,"text":225,"correct":22},"施工总承包管理方承担对分包方的组织和管理责任",{"key":34,"text":227,"correct":26},"由业主方选定的分包方无需施工总承包管理方的认可","ACD",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":243,"analysis":37},1270508,"某施工企业承担了某项施工任务，为保证项目目标的实现，项目经理做了以下各项工作，其中属于项目目标事前控制的内容有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":26},"收集项目目标的实际值",{"key":24,"text":236,"correct":26},"定期进行项目目标的计划值与实际值比较",{"key":28,"text":238,"correct":22},"事前分析可能导致目标偏离的各种影响因素",{"key":31,"text":240,"correct":22},"针对影响项目目标的各种因素采取预防措施",{"key":34,"text":242,"correct":26},"当发现目标偏离时，采取纠偏措施进行纠偏","CD",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":258,"analysis":37},1270509,"常用的施工成本偏差分析方法有（ ）。",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"网络图法",{"key":24,"text":251,"correct":22},"表格法",{"key":28,"text":253,"correct":26},"排列图法",{"key":31,"text":255,"correct":22},"曲线法",{"key":34,"text":257,"correct":22},"横道图法","BDE",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":273,"analysis":37},1270510,"施工项目质量问题的原因有很多，（ ）是属于施工与管理不到位的原因。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"未经设计单位同意擅自修改设计",{"key":24,"text":266,"correct":26},"未搞清工程地质情况仓促开工",{"key":28,"text":268,"correct":26},"水泥安定性不良",{"key":31,"text":270,"correct":26},"采用不正确的结构方案",{"key":34,"text":272,"correct":22},"施工方案考虑不周，施工顺序颠倒","AE",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":140,"analysis":37},1270511,"在建设项目的组织系统中，常用的组织结构模式有（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"线性组织结构",{"key":24,"text":281,"correct":22},"矩阵组织结构",{"key":28,"text":283,"correct":22},"职能组织结构",{"key":31,"text":285,"correct":26},"项目组织结构",{"key":34,"text":287,"correct":26},"项目合同结构",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":213,"analysis":37},1270512,"属于工作队式项目组织优点的有（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":22},"项目经理从职能部门抽调或招聘的是一批专家，他们在项目管理中配合，协同工作，可以取长补短，有利于培养一专多能的人才并充分发挥其作用",{"key":24,"text":295,"correct":22},"各专业人才集中在现场办公，减少了扯皮和等待时间，办事效率高，解决问题快",{"key":28,"text":297,"correct":22},"由于减少了项目与职能部门的结合部，项目与企业的结合部关系弱化，故易于协调关系，减少了行政干预，使项目经理的工作易于开展",{"key":31,"text":299,"correct":22},"不打乱企业的原建制，传统的直线职能制组织仍可保留",{"key":34,"text":301,"correct":26},"打乱企业的原建制，但传统的直线职能制组织可保留",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},1270513,"以下关于工程项目阶段的任务描述，属于施工项目周期的是（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"项目决策",{"key":24,"text":309,"correct":26},"项目可行性研究",{"key":28,"text":311,"correct":22},"工程投标及签订承包合同",{"key":31,"text":313,"correct":22},"施工准备及施工",{"key":34,"text":315,"correct":22},"竣工验收","CDE",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":213,"analysis":37},1270514,"以下关于项目组织结构图的说法正确的是（ ）。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"项目组织结构图反映一个组织系统（如项目管理班子）中各子系统之间和各元素（如各工作部门）之间的组织关系",{"key":24,"text":324,"correct":22},"项目组织结构图应表达业主方以及项目的参与单位各工作部门之间的组织关系",{"key":28,"text":326,"correct":22},"业主方、设计方、施工方、供货方和工程管理咨询方的项目管理的组织结构都可用各自的项目组织结构图予以描述",{"key":31,"text":328,"correct":22},"项目组织结构图应反映项目经理及费用（投资或成本）控制、进度控制、质量控制、合同管理、信息管理和组织与协调等主管工作部门或主管人员之间的组织关系",{"key":34,"text":330,"correct":26},"项目组织结构图不会反映的是各工作单位、各工作部门和各工作人员之间的组织关系",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":213,"analysis":37},1270515,"施工安全信息保证体系由（ ）等工作组成。",[335,337,339,341,343],{"key":20,"text":336,"correct":22},"信息工作条件",{"key":24,"text":338,"correct":22},"信息收集",{"key":28,"text":340,"correct":22},"信息处理",{"key":31,"text":342,"correct":22},"信息服务",{"key":34,"text":344,"correct":26},"信息安全",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":228,"analysis":37},1270516,"施工企业在建立施工安全管理体系时，应遵循的原则有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"要建立健全安全生产责任制和群防群治制度",{"key":24,"text":352,"correct":26},"项目部可自行制定本项目的安全管理规程",{"key":28,"text":354,"correct":22},"必须符合法律、行政法规及规程的要求",{"key":31,"text":356,"correct":22},"必须适用于工程施工全过程",{"key":34,"text":358,"correct":26},"企业可以建立统一的施工安全管理体系",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":213,"analysis":37},1270517,"在特殊过程中施工质量控制点的设置方法（种类）有（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"以质量特性值为对象来设置",{"key":24,"text":366,"correct":22},"以工序为对象来设置",{"key":28,"text":368,"correct":22},"以设备为对象来设置",{"key":31,"text":370,"correct":22},"以管理工作为对象来设置",{"key":34,"text":372,"correct":26},"以项目的复杂程度为对象来设置",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":213,"analysis":37},1270518,"施工过程所需的资金来源为（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"预收工程备料款",{"key":24,"text":380,"correct":22},"已完施工施工价款结算",{"key":28,"text":382,"correct":22},"内部银行贷款",{"key":31,"text":384,"correct":22},"其他项目资金的调剂",{"key":34,"text":386,"correct":26},"工程集资款",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":213,"analysis":37},1270519,"材料质量控制的要点有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"掌握材料信息，优选供货厂家",{"key":24,"text":394,"correct":22},"合理组织材料供应，确保施工正常进行",{"key":28,"text":396,"correct":22},"合理组织材料使用，减少材料的损失",{"key":31,"text":398,"correct":22},"加强材料检查验收，严把材料质量关",{"key":34,"text":400,"correct":26},"降低采购材料的成本",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":213,"analysis":37},1270520,"限额领料依据有（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"正确的工程量",{"key":24,"text":408,"correct":22},"现行的施工预算定额或企业内部消耗定额",{"key":28,"text":410,"correct":22},"施工组织设计",{"key":31,"text":412,"correct":22},"工程变更单",{"key":34,"text":414,"correct":26},"现场情况及货源供应情况",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":429,"analysis":37},1270521,"下列工作中，属于施工阶段的有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":26},"组建项目经理部",{"key":24,"text":422,"correct":22},"严格履行合同，协调好与建设单位、监理单位、设计单位等相关单位的关系",{"key":28,"text":424,"correct":26},"项目经理组织编制《施工项目管理实施规划》",{"key":31,"text":426,"correct":26},"项目经理部编写开工报告",{"key":34,"text":428,"correct":22},"管理施工现场，实现文明施工","BE",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":52,"analysis":37},1270522,"除了制度保证体系外，施工安全保证体系还包括（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"组织保证体系",{"key":24,"text":437,"correct":22},"技术保证体系",{"key":28,"text":439,"correct":22},"投入保证体系",{"key":31,"text":441,"correct":26},"管理保证体系",{"key":34,"text":443,"correct":22},"信息保证体系",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":52,"analysis":37},1270523,"以下属于项目目标动态控制纠偏措施的有（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"组织措施",{"key":24,"text":451,"correct":22},"管理措施",{"key":28,"text":453,"correct":22},"经济措施",{"key":31,"text":455,"correct":26},"安全措施",{"key":34,"text":457,"correct":22},"技术措施",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":472,"analysis":37},1270524,"施工机械设备管理要健全各项管理制度，包括（ ）等。",[462,464,466,468,470],{"key":20,"text":463,"correct":26},"人机不固定”制度",{"key":24,"text":465,"correct":22},"“操作证”制度",{"key":28,"text":467,"correct":22},"岗位责任制度",{"key":31,"text":469,"correct":22},"交接班制度",{"key":34,"text":471,"correct":22},"“安全使用”制度","BCDE",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":52,"analysis":37},1270525,"施工项目成本分析的基本方法包括（ ）。",[477,479,481,483,484],{"key":20,"text":478,"correct":22},"比较法",{"key":24,"text":480,"correct":22},"比率法",{"key":28,"text":482,"correct":22},"因素分析法",{"key":31,"text":257,"correct":26},{"key":34,"text":485,"correct":22},"差额计算法",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":140,"analysis":37},1270526,"组织论的三个重要的组织工具是（ ）。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"项目结构图",{"key":24,"text":493,"correct":22},"组织结构图",{"key":28,"text":495,"correct":22},"合同结构图",{"key":31,"text":497,"correct":26},"工作任务分工表",{"key":34,"text":499,"correct":26},"职能管理分工表",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":514,"analysis":37},1270527,"下面属于项目的特征的是（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"项目的一次性",{"key":24,"text":507,"correct":22},"项目目标的明确性",{"key":28,"text":509,"correct":26},"项目的临时性",{"key":31,"text":511,"correct":22},"项目作为管理对象的整体性",{"key":34,"text":513,"correct":22},"项目类型多样性","ABDE",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":213,"analysis":37},1270528,"企业必须建立的基本安全生产制度包括：（ ）等制度。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"安全生产责任制",{"key":24,"text":522,"correct":22},"安全技术措施",{"key":28,"text":524,"correct":22},"安全生产培训和教育",{"key":31,"text":526,"correct":22},"安全生产定期检查",{"key":34,"text":528,"correct":26},"生产人员考勤",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":213,"analysis":37},1270529,"施工成本分析的基本方法有（ ）。",[533,534,535,536,537],{"key":20,"text":478,"correct":22},{"key":24,"text":482,"correct":22},{"key":28,"text":485,"correct":22},{"key":31,"text":480,"correct":22},{"key":34,"text":255,"correct":26},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":213,"analysis":37},1270530,"制度保证体系的构成：（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"岗位管理",{"key":24,"text":545,"correct":22},"措施管理",{"key":28,"text":547,"correct":22},"投入和物资管理",{"key":31,"text":549,"correct":22},"日常管理",{"key":34,"text":551,"correct":26},"质量管理",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":213,"analysis":37},1270531,"进度控制的技术措施主要包括：（ ）。",[556,558,560,562,564],{"key":20,"text":557,"correct":22},"采用多级网络计划技术和其他先进适用的计划技术",{"key":24,"text":559,"correct":22},"组织流水作业，保证作业连续、均衡、有节奏",{"key":28,"text":561,"correct":22},"采用电子计算机控制进度的措施",{"key":31,"text":563,"correct":22},"采用先进高效的技术和设备",{"key":34,"text":565,"correct":26},"建立图纸审查、及时办理工程变更和设计变更手续的措施",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":213,"analysis":37},1270532,"安全检查可分为（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"日常性检查",{"key":24,"text":573,"correct":22},"专业性检查",{"key":28,"text":575,"correct":22},"季节性检查",{"key":31,"text":577,"correct":22},"节假日前后的检查",{"key":34,"text":579,"correct":26},"产品质量检测",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":592,"analysis":37},1270533,"合同控制的技术措施主要包括：（ ）。",[584,585,587,589,590],{"key":20,"text":557,"correct":26},{"key":24,"text":586,"correct":22},"加强合同管理，加强组织、指挥和协调，以保证合同进度目标的实现",{"key":28,"text":588,"correct":22},"严格控制合同变更，对各方提出的工程变更和设计变更，经监理工程师严格审查后补进合同文件",{"key":31,"text":563,"correct":26},{"key":34,"text":591,"correct":22},"加强风险管理，在合同中要充分考虑风险因素及其对进度的影响和处理办法","BCE",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":607,"analysis":37},1270534,"下列选项中，属于工程测量质量控制点的有（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"标准轴线桩",{"key":24,"text":600,"correct":22},"水平桩",{"key":28,"text":602,"correct":26},"预留洞孔",{"key":31,"text":604,"correct":22},"定位轴线",{"key":34,"text":606,"correct":26},"预留控制点","ABD",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":52,"analysis":37},1270535,"下列选项中，属于施工总承包方管理任务的有（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"负责整个工程的施工安全",{"key":24,"text":615,"correct":22},"控制施工的成本",{"key":28,"text":617,"correct":22},"为分包施工单位提供和创造必要的施工条件",{"key":31,"text":619,"correct":26},"负责与设计工作有关的组织与协调工作",{"key":34,"text":621,"correct":22},"负责施工资源的组织和供应",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":592,"analysis":37},1270536,"以下各项中属于施工现场管理的内容的是（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":26},"落实资源进度计划",{"key":24,"text":629,"correct":22},"设计施工现场平面图",{"key":28,"text":631,"correct":22},"建立文明施工现场",{"key":31,"text":633,"correct":26},"施工资源进度计划的动态调整",{"key":34,"text":635,"correct":22},"及时清场转移",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":213,"analysis":37},1270537,"以下属于施工项目资源管理的内容的是（ ）。",[640,642,643,645,647],{"key":20,"text":641,"correct":22},"劳动力",{"key":24,"text":148,"correct":22},{"key":28,"text":644,"correct":22},"技术",{"key":31,"text":646,"correct":22},"机械设备",{"key":34,"text":648,"correct":26},"施工现场",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":472,"analysis":37},1270538,"属于矩阵式项目组织优点的是（ ）。",[653,655,657,659,661],{"key":20,"text":654,"correct":26},"职责明确，职能专一，关系简单",{"key":24,"text":656,"correct":22},"有部门控制式组织的优点",{"key":28,"text":658,"correct":22},"能以尽可能少的人力，实现多个项目管理的高效率",{"key":31,"text":660,"correct":22},"有利于人才的全面培养",{"key":34,"text":662,"correct":22},"有工作队式组织的优点",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":228,"analysis":37},1270539,"影响弯曲变形（位移）的因素为（ ）。",[667,669,671,673,675],{"key":20,"text":668,"correct":22},"材料性能",{"key":24,"text":670,"correct":26},"稳定性",{"key":28,"text":672,"correct":22},"截面大小和形状",{"key":31,"text":674,"correct":22},"构件的跨度",{"key":34,"text":676,"correct":26},"可恢复弹性范围",{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":140,"analysis":37},1270540,"对于在弹性范围内受力的拉（压）杆，以下说法中，（ ）是正确的。",[681,683,685,687,689],{"key":20,"text":682,"correct":22},"长度相同、受力相同的杆件，抗拉（压）刚度越大，轴向变形越小",{"key":24,"text":684,"correct":22},"材料相同的杆件，正应力越大，轴向正应变也越大",{"key":28,"text":686,"correct":22},"杆件受力相同，横截面面积相同但形状不同，其横截面上轴力相等",{"key":31,"text":688,"correct":26},"正应力是由于杆件所受外力引起的，故只要所受外力相同，正应力也相同",{"key":34,"text":690,"correct":26},"质地相同的杆件，应力越大，应变也越大",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":607,"analysis":37},1270541,"下列结论不正确的是（ ）。",[695,697,699,701,703],{"key":20,"text":696,"correct":22},"杆件某截面上的内力是该截面上应力的代数和",{"key":24,"text":698,"correct":22},"杆件某截面上的应力是该截面上内力的平均值",{"key":28,"text":700,"correct":26},"应力是内力的集度",{"key":31,"text":702,"correct":22},"内力必大于应力",{"key":34,"text":704,"correct":26},"垂直于截面的力称为正应力",{"id":706,"libraryId":5,"type":15,"typeLabel":16,"stem":707,"options":708,"answer":81,"analysis":37},1270542,"平面一般力系的平衡条件是：力系的（ ）均等于零。",[709,711,713,715,717],{"key":20,"text":710,"correct":26},"活荷载",{"key":24,"text":712,"correct":22},"主失",{"key":28,"text":714,"correct":26},"恒荷载",{"key":31,"text":716,"correct":22},"主矩",{"key":34,"text":718,"correct":26},"动荷载",{"id":720,"libraryId":5,"type":15,"typeLabel":16,"stem":721,"options":722,"answer":733,"analysis":37},1270543,"反力、内力与（ ）有关。",[723,725,727,729,731],{"key":20,"text":724,"correct":22},"结构的尺寸",{"key":24,"text":726,"correct":26},"构件截面尺寸",{"key":28,"text":728,"correct":22},"结构的几何形状",{"key":31,"text":730,"correct":26},"构件形状",{"key":34,"text":732,"correct":26},"支座沉陷","AC",[735,739,742,745,748,751],{"id":736,"name":737,"category":7,"favorite":738},1,"领导干部任职前廉政法规知识测试题",92,{"id":740,"name":741,"category":7,"favorite":736},595,"建筑结构与设备",{"id":743,"name":744,"category":7,"favorite":736},715,"招标采购专业知识与法律法规",{"id":746,"name":747,"category":7,"favorite":736},848,"市政方向-通用基础",{"id":749,"name":750,"category":7,"favorite":8},534,"BIM工程师",{"id":752,"name":750,"category":7,"favorite":8},535]