[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-857-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":739},{"id":5,"name":6,"category":7,"favorite":8},857,"(土建质量)基础知识","建筑工程",0,22,50,1275,[13,38,53,68,83,98,112,127,142,157,171,185,199,213,227,241,256,271,286,301,315,329,343,357,372,386,401,416,431,445,459,473,487,501,515,529,544,558,572,586,600,614,628,639,654,668,683,697,711,725],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1270444,2,"多选题","钢筋混凝土柱的施工缝，一般应留在（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","基础顶面",true,{"key":24,"text":25,"correct":22},"B","梁的下面",{"key":27,"text":28,"correct":22},"C","无梁楼板柱帽下面",{"key":30,"text":31,"correct":22},"D","吊车梁牛腿下面",{"key":33,"text":34,"correct":35},"E","柱子中间1\u002F3范围内",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1270445,"冬期施工为提高混凝土的抗冻性可采取的措施有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"配制混凝土时掺引气剂",{"key":24,"text":45,"correct":22},"配制混凝土减少水灰比",{"key":27,"text":47,"correct":22},"优先选用水化热量大的硅酸盐水泥",{"key":30,"text":49,"correct":35},"采用粉煤灰硅酸盐水泥配制混凝土",{"key":33,"text":51,"correct":22},"采用较高等级水泥配制混凝土","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1270446,"高强度螺栓摩擦面处理后的抗滑移系数值应符合设计的要求，摩擦面的处理可采用（ ）等方法。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"喷砂",{"key":24,"text":60,"correct":22},"喷丸",{"key":27,"text":62,"correct":35},"电镀",{"key":30,"text":64,"correct":22},"酸洗",{"key":33,"text":66,"correct":22},"砂轮打磨","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1270447,"下列关于钢结构安装施工要点的说法中，有误的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"起吊事先将钢构件吊离地面30cm左右，使钢构件中心对准安装位置中心",{"key":24,"text":75,"correct":22},"高强度螺栓上、下接触面处加有1\u002F15以上斜度时应采用垫圈垫平",{"key":27,"text":77,"correct":35},"施焊前，焊工应检查焊接件的接头质量和焊接区域的坡口、间隙、钝边等的处理情况",{"key":30,"text":79,"correct":35},"厚度大于12～20mm的板材，单面焊后，背面清根，再进行焊接",{"key":33,"text":81,"correct":22},"焊道两端加引弧板和熄弧板，引弧和熄弧焊缝长度应大于或等于150mm","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1270448,"预应力提高了混凝土结构（构件）的（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":35},"强度",{"key":24,"text":90,"correct":22},"刚度",{"key":27,"text":92,"correct":22},"抗裂度",{"key":30,"text":94,"correct":35},"抗冻性",{"key":33,"text":96,"correct":35},"耐磨性","BC",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1270449,"土方开挖前需做好准备工作，包括（ ）等。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"清除障碍物",{"key":24,"text":105,"correct":22},"设置排水设施",{"key":27,"text":107,"correct":22},"设置测量控制网",{"key":30,"text":109,"correct":22},"修建临时设施",{"key":33,"text":111,"correct":35},"地基验槽",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1270450,"大体积混凝土结构的分层浇筑方案有（ ）几种。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"全面分层",{"key":24,"text":119,"correct":35},"全面分段",{"key":27,"text":121,"correct":22},"分段分层",{"key":30,"text":123,"correct":35},"斜面分段分层",{"key":33,"text":125,"correct":22},"斜面分层","ACE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1270451,"在冬期施工时，混凝土养护方法有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":35},"洒水法",{"key":24,"text":134,"correct":35},"涂刷沥青乳液法",{"key":27,"text":136,"correct":22},"蓄热法",{"key":30,"text":138,"correct":22},"加热法",{"key":33,"text":140,"correct":22},"掺外加剂法","CDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1270452,"下列关于常用人工地基处理方法的基本规定中，正确的是（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"砂石桩适用于挤密松散砂土、素填土和杂填土等地基",{"key":24,"text":149,"correct":35},"振冲桩适用于加固松散的素填土、杂填土地基",{"key":27,"text":151,"correct":35},"强夯法适用于处理高于地下水位0.8m以上稍湿的黏性土、砂土、湿陷性黄土、杂填土和分层填土地基的加固处理",{"key":30,"text":153,"correct":35},"沙井堆载预压法适用于处理深厚软土和冲填土地基，对于泥炭等有机质沉积地基同样适用",{"key":33,"text":155,"correct":22},"沙井堆载预压法多用于处理机场跑道、水工结构、道路、路堤、码头、岸坡等工程地基","AE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":36,"analysis":37},1270453,"土钉墙支护与其它支护方法比较，具有（ ）特点。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"施工操作简便",{"key":24,"text":164,"correct":22},"设备简单",{"key":27,"text":166,"correct":22},"噪声小",{"key":30,"text":168,"correct":22},"工期短",{"key":33,"text":170,"correct":35},"费用高",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":126,"analysis":37},1270454,"下列关于防水混凝土施工工艺的说法中，错误的是（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"水泥选用强度等级不低于32.5级",{"key":24,"text":178,"correct":35},"在保证能振捣密实的前提下水灰比尽可能小，一般不大于0.6，坍落度不大于50mm",{"key":27,"text":180,"correct":22},"为了有效起到保护钢筋和阻止钢筋的引水作用，迎水面防水混凝土的钢筋保护层厚度不得小于35mm",{"key":30,"text":182,"correct":35},"在浇筑过程中，应严格分层连续浇筑，每层厚度不宜超过300～400mm，机械振捣密实",{"key":33,"text":184,"correct":22},"墙体一般允许留水平施工缝和垂直施工缝",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":97,"analysis":37},1270455,"下列关于门窗工程施工工艺的说法中，正确的是（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":35},"塑料门窗中连接件的位置应距窗角、中竖框、中横框150～250mm，连接件之间的距离≤800mm",{"key":24,"text":192,"correct":22},"塑料门窗安装完毕后，要逐个进行启闭调试，保证开关灵活，性能良好，关闭严密，表面平整",{"key":27,"text":194,"correct":22},"塑料门窗的安装工艺流程为：找规矩弹线→安装门窗框→门窗框嵌缝→安装门窗扇→安装五金（玻璃）→调试、清理成品保护",{"key":30,"text":196,"correct":35},"塑料门窗通常采用推拉、平开、自动式等方式开启",{"key":33,"text":198,"correct":35},"木门窗五金安装时，门窗扇嵌L铁、T铁时应加以隐蔽，作凹槽，安完后应低于表面2mm左右",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":141,"analysis":37},1270456,"下列关于土方回填压实的基本规定的各项中，正确的是（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":35},"碎石类土、砂土和爆破石渣（粒径不大于每层铺土后2\u002F3）可作各层填料",{"key":24,"text":206,"correct":35},"人工填土每层虚铺厚度，用人工木夯夯实时不大于25cm，用打夯机械夯实时不大于30cm",{"key":27,"text":208,"correct":22},"铺土应分层进行，每次铺土厚度不大于30～50cm（视所用压实机械的要求而定）",{"key":30,"text":210,"correct":22},"当填方基底为耕植土或松土时，应将基底充分夯实和碾压密实",{"key":33,"text":212,"correct":22},"机械填土时填土程序一般尽量采取横向或纵向分层卸土，以利行驶时初步压实",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":126,"analysis":37},1270457,"下列关于模板安装与拆除的基本规定中，正确的是（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"同一条拼缝上的U行卡，不宜向同一方向卡紧",{"key":24,"text":220,"correct":35},"钢楞宜采用整根杆件，接头宜错开设置，搭接长度不应小于300mm",{"key":27,"text":222,"correct":22},"模板支设时，采用预组拼方法，可以加快施工速度，提高工效和模板的安装质量，但必须具备相适应的吊装设备和有较大的拼装场地",{"key":30,"text":224,"correct":35},"模板拆除时，当混凝土强度大于1.2N\u002Fm㎡时，应先拆除侧面模板，再拆除承重模板",{"key":33,"text":226,"correct":22},"模板拆除的顺序和方法，应按照配板设计的规定进行，遵循先支后拆，先非承重部位，后承重部位以及自上而下的原则",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":97,"analysis":37},1270458,"模板拆除的一般顺序是（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":35},"先支的先拆",{"key":24,"text":234,"correct":22},"先支的后拆",{"key":27,"text":236,"correct":22},"后支的先拆",{"key":30,"text":238,"correct":35},"后支的后拆",{"key":33,"text":240,"correct":35},"先拆板模、后拆柱模",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":255,"analysis":37},1270459,"砌砖宜采用“三一砌筑法”，即（ ）的砌筑方法。",[245,247,249,251,253],{"key":20,"text":246,"correct":35},"一把刀",{"key":24,"text":248,"correct":22},"一铲灰",{"key":27,"text":250,"correct":22},"一块砖",{"key":30,"text":252,"correct":22},"一揉压",{"key":33,"text":254,"correct":35},"一铺灰","BCD",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":270,"analysis":37},1270460,"控制大体积混凝土裂缝的方法有（ ）。",[260,262,264,266,268],{"key":20,"text":261,"correct":35},"增加水泥用量",{"key":24,"text":263,"correct":22},"在保证强度的前提下，降低水灰比",{"key":27,"text":265,"correct":22},"控制混凝土内外温差",{"key":30,"text":267,"correct":22},"优先选用低水化热的水泥",{"key":33,"text":269,"correct":22},"及时对混凝土覆盖保温","BCDE",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1270461,"下列关于柱钢筋和板钢筋绑扎的施工工艺的规定中正确的是（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"柱钢筋绑扎中箍筋的接头应交错布置在四角纵向钢筋上，箍筋转角与纵向钢筋交叉点均应扎牢",{"key":24,"text":278,"correct":35},"板钢筋绑扎中板、次梁与主梁交叉处，板的钢筋在上，次梁的钢筋居中。主梁的钢筋一直在下侧",{"key":27,"text":280,"correct":22},"板钢筋绑扎的施工工艺流程为：清理垫层、划线→摆放下层钢筋，并固定绑扎→摆放钢筋撑脚（双层钢筋时）→安装管线→绑扎上层钢筋",{"key":30,"text":282,"correct":22},"对于双向受力板，应先铺设平行于短边方向的受力钢筋，后铺设平行于长边方向的受力钢筋",{"key":33,"text":284,"correct":35},"板上部的负筋、主筋与分布钢筋的交叉点应相隔交错扎牢，并垫上保护层垫块","ACD",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":300,"analysis":37},1270462,"砖砌体的组砌原则有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"砖块之间要错缝搭接",{"key":24,"text":293,"correct":35},"砖体表面不能出现游丁走缝",{"key":27,"text":295,"correct":22},"砌体内外不能有过长通缝",{"key":30,"text":297,"correct":22},"要尽量少砍砖",{"key":33,"text":299,"correct":22},"要有利于提高生产率","ACDE",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":52,"analysis":37},1270463,"地下卷材防水层铺贴施工的正确做法包括（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"选用高聚物改性沥青类或合成高分子类卷材",{"key":24,"text":308,"correct":22},"冷粘法施工的卷材防水层，应固化7d以上方可遇水",{"key":27,"text":310,"correct":22},"冷粘法施工时气温不得低于5℃，热熔法施工时气温不得低于一10℃",{"key":30,"text":312,"correct":35},"用外防夕卜贴法铺贴防水层时，应先铺立面，后铺平面",{"key":33,"text":314,"correct":22},"卷材接缝不得在阴角处",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":52,"analysis":37},1270464,"在施工缝处继续浇筑混凝土时，应先做到（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"清除混凝土表面疏松物质及松动石子",{"key":24,"text":322,"correct":22},"将施工缝处冲洗干净，不得有积水",{"key":27,"text":324,"correct":22},"已浇筑混凝土的强度达到1.2N\u002Fmm2",{"key":30,"text":326,"correct":35},"已浇筑的混凝土的强度达到0.5N\u002Fmm2",{"key":33,"text":328,"correct":22},"在施工缝处先铺一层与混凝土成分相同的水泥砂浆",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":36,"analysis":37},1270465,"钢筋机械连接类型有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"钢筋套筒挤压连接",{"key":24,"text":336,"correct":22},"钢筋锥螺纹套筒连接",{"key":27,"text":338,"correct":22},"钢筋镦粗直螺纹套筒连接",{"key":30,"text":340,"correct":22},"钢筋滚压直螺纹套筒连接",{"key":33,"text":342,"correct":35},"绑扎连接",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":52,"analysis":37},1270466,"关于施工缝的留设与处理的说法中，正确的是（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"施工缝宜留在结构受剪力较小且便于施工的部位",{"key":24,"text":350,"correct":22},"柱应留水平缝，梁、板应留垂直缝",{"key":27,"text":352,"correct":22},"在施工缝处继续浇筑混凝土时，应待浇筑的混凝土抗压强度不小于1.2MPa方可进行，以抵抗继续浇筑混凝土的扰动",{"key":30,"text":354,"correct":35},"对施工缝进行处理时，需满铺一层厚20～50mm的水泥浆或与混凝土同水灰比的水泥沙浆，方可继续浇筑混凝土",{"key":33,"text":356,"correct":22},"在施工缝处继续浇筑混凝土时，应将混凝土表面凿毛、清洗、清楚水泥浆膜和松动石子或软弱的混凝土层",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":371,"analysis":37},1270467,"钢结构安装工程中常用的起重机械有（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"桅杆起重机",{"key":24,"text":364,"correct":22},"自行杆式起重机（履带式、汽车式和轮胎式）",{"key":27,"text":366,"correct":22},"塔式起重机",{"key":30,"text":368,"correct":35},"浮吊",{"key":33,"text":370,"correct":35},"卷扬机等","ABC",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":371,"analysis":37},1270468,"钢结构焊接质量无损检验包括（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"外观检查",{"key":24,"text":379,"correct":22},"致密性检验",{"key":27,"text":381,"correct":22},"无损探伤",{"key":30,"text":383,"correct":35},"气密性检验",{"key":33,"text":385,"correct":35},"水密性检验",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},1270469,"下列关于毛石砌体和砌块砌体施工工艺的基本规定中有误的是（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":35},"毛石墙砌筑时，墙角部分纵横宽度至少0.8m",{"key":24,"text":393,"correct":35},"对于中间毛石砌筑的料石挡土墙，丁砌料石应深入中间毛石部分的长度不应小于200mm",{"key":27,"text":395,"correct":22},"毛石墙必须设置拉结石，拉结石应均匀分布，相互错开，一般每0.5㎡墙面至少设置一块，且同皮内的中距不大于2m",{"key":30,"text":397,"correct":35},"砌块砌体施工工艺流程为：基层处理→测量墙中线→弹墙边线→砌底部实心砖→立皮数杆→拉准线、铺灰、依准线砌筑→埋墙拉筋→梁下、墙顶斜砖砌筑",{"key":33,"text":399,"correct":22},"砌块砌体的埋墙拉筋应与钢筋混凝土柱（墙）的连接，采取在混凝土柱（墙）上打入2φ6@1000的膨胀螺栓","CE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},1270470,"下列关于钻、挖、冲孔灌注桩施工的基本规定中，表述正确的是（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"沉渣厚度要小于100mm，清孔验收合格后，要立即放入钢筋笼",{"key":24,"text":408,"correct":22},"用导管开始浇筑混凝土时，管口至孔底的距离为300～500mm，第一次浇筑时，导管要埋入混凝土下0.8m以上，以后浇筑时，导管埋深亦未宜为2～6m",{"key":27,"text":410,"correct":35},"钢筋笼检查无误后要马上浇筑混凝土，间隔时间不能超过6小时",{"key":30,"text":412,"correct":22},"浇筑混凝土时必须采用溜槽，当落距超过2m时，应采用串筒，串筒末端距孔底高度不大于2m，随浇随摘，也可采用导管泵送",{"key":33,"text":414,"correct":35},"每日开工前必须检测井下的有毒有害气体，当桩孔开挖深度超过8m时，要有专门向井下送风的设备","ABD",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":430,"analysis":37},1270471,"静力压桩法与锤击沉桩相比，它具有施工（ ）和提高施工质量等特点",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"无噪声",{"key":24,"text":423,"correct":35},"有振动",{"key":27,"text":425,"correct":35},"浪费材料",{"key":30,"text":427,"correct":22},"降低成本",{"key":33,"text":429,"correct":35},"沉桩速度慢","AD",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":300,"analysis":37},1270472,"下列属于非落地式脚手架的是（ ）。",[435,437,439,441,443],{"key":20,"text":436,"correct":22},"附着升降脚手架",{"key":24,"text":438,"correct":35},"爬升式脚手架",{"key":27,"text":440,"correct":22},"悬挑式脚手架",{"key":30,"text":442,"correct":22},"吊篮脚手架",{"key":33,"text":444,"correct":22},"挂脚手架",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":300,"analysis":37},1270473,"影响填土压实的主要因素有（ ）。",[449,451,453,455,457],{"key":20,"text":450,"correct":22},"土的含水量",{"key":24,"text":452,"correct":35},"土的孔隙特征",{"key":27,"text":454,"correct":22},"每层铺土厚度",{"key":30,"text":456,"correct":22},"压实遍数",{"key":33,"text":458,"correct":22},"压实方法",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":255,"analysis":37},1270474,"以下关于砖砌体的施工工艺的基本规定中，正确的是（ ）。",[463,465,467,469,471],{"key":20,"text":464,"correct":35},"皮数杆一般立于房屋的四大角、内外墙交接处、楼梯间以及洞口多的洞口。一般可每隔5～10m立一根",{"key":24,"text":466,"correct":22},"一般在房屋外纵墙方向摆顺砖，在山墙方向摆丁砖，摆砖由一个大角摆到另一个大角，砖与砖留10mm缝隙",{"key":27,"text":468,"correct":22},"盘角时主要大角不宜超过5皮砖，且应随起随盘，做到“三皮一吊，五皮一靠”",{"key":30,"text":470,"correct":22},"各层标高除立皮数杆控制外，还可弹出室内水平线进行控制",{"key":33,"text":472,"correct":35},"加浆勾缝系指再砌筑几皮砖以后，先在灰缝处划出2cm深的灰槽",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":415,"analysis":37},1270475,"屋面防水卷材铺贴应采用搭接法连接，做法正确的有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"平行于屋脊的搭接缝顺水流方向搭接",{"key":24,"text":480,"correct":22},"垂直于屋脊的搭接缝顺年最大频率风向搭接",{"key":27,"text":482,"correct":35},"垂直于屋脊的搭接缝应顺流水方向搭接",{"key":30,"text":484,"correct":22},"上下层卷材的搭接缝错开",{"key":33,"text":486,"correct":35},"平行于屋脊的搭接顺年最大频率风向搭接",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":371,"analysis":37},1270476,"防水工程按其使用材料不同可分为（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"卷材防水",{"key":24,"text":494,"correct":22},"涂料防水",{"key":27,"text":496,"correct":22},"砂浆、混凝土防水",{"key":30,"text":498,"correct":35},"结构自防水",{"key":33,"text":500,"correct":35},"防水层防水",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":52,"analysis":37},1270477,"按成孔方法不同，灌注桩可分为（ ）等。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"钻孔灌注桩法",{"key":24,"text":508,"correct":22},"挖孔灌注桩",{"key":27,"text":510,"correct":22},"冲孔灌注桩",{"key":30,"text":512,"correct":35},"静力压桩",{"key":33,"text":514,"correct":22},"沉管灌注桩",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":255,"analysis":37},1270478,"下列关于涂饰工程施工工艺的说法中，错误的是（ ）。",[519,521,523,525,527],{"key":20,"text":520,"correct":35},"施工工艺流程为：基层处理→打底、批刮腻子→面层施涂→修理",{"key":24,"text":522,"correct":22},"混凝土与抹灰表面在施涂前应将基体或基层的缺棱掉角处、孔洞用1:2的水泥砂浆修补",{"key":27,"text":524,"correct":22},"外墙抗裂弹性腻子修补、填平时，待修补完成后，将抹灰面满刮外墙抗裂弹性腻子一遍，腻子批刮厚度为0.3～0.8mm",{"key":30,"text":526,"correct":22},"面层施涂滚涂大面时，用长度为15～20cm的长辊，以利于提高功效",{"key":33,"text":528,"correct":35},"底漆和乳胶漆施工适宜温度为0℃以上，未用完的底乳胶漆应加盖密封，并存放在阴凉通风处",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":543,"analysis":37},1270479,"屋面卷材铺贴时，应按（ ）的顺序。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"先高跨后低跨",{"key":24,"text":536,"correct":35},"先低跨后高跨",{"key":27,"text":538,"correct":35},"先近后远",{"key":30,"text":540,"correct":22},"先远后近",{"key":33,"text":542,"correct":22},"先做好泛水，然后铺设大屋面","ADE",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":126,"analysis":37},1270480,"钢筋的加工包括（ ）工序。",[548,550,552,554,556],{"key":20,"text":549,"correct":22},"调直、除锈",{"key":24,"text":551,"correct":35},"铲边",{"key":27,"text":553,"correct":22},"下料切断、接长",{"key":30,"text":555,"correct":35},"气割",{"key":33,"text":557,"correct":22},"弯曲成型",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":82,"analysis":37},1270481,"关于混凝土浇筑的说法中正确的是（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"混凝土的浇筑工作应连续进行",{"key":24,"text":565,"correct":22},"混凝土应分层浇筑，分层捣实，但两层混凝土浇捣时间间隔不超过规范规定",{"key":27,"text":567,"correct":35},"在竖向结构中如浇筑高度超过2m时，应采用溜槽或串筒下料",{"key":30,"text":569,"correct":35},"浇筑竖向结构混凝土前，应先在底部填筑一层20～50mm厚、与混凝土内砂浆成分相同的水泥砂浆，然后再浇筑混凝土",{"key":33,"text":571,"correct":22},"浇筑过程应经常观察模板及其支架、钢筋、埋设件和预留孔洞的情况，当发现有变形或位移时，应立即快速处理",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":255,"analysis":37},1270482,"木地板的施工方法有（ ）。",[576,578,580,582,584],{"key":20,"text":577,"correct":35},"粘贴法",{"key":24,"text":579,"correct":22},"空铺法",{"key":27,"text":581,"correct":22},"实铺法",{"key":30,"text":583,"correct":22},"浮铺法",{"key":33,"text":585,"correct":35},"压铺法",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":36,"analysis":37},1270483,"爬升模板适用于（ ）等。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"墙体",{"key":24,"text":593,"correct":22},"电梯井",{"key":27,"text":595,"correct":22},"桥梁",{"key":30,"text":597,"correct":22},"塔柱",{"key":33,"text":599,"correct":35},"公路",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":52,"analysis":37},1270484,"施工准备阶段现场准备的安全技术措施包括（ ）的内容。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"按施工总平面图要求做好现场施工准备",{"key":24,"text":607,"correct":22},"电气线路，配电设备符合安全要求，有安全用电防护措施",{"key":27,"text":609,"correct":22},"场内道路畅通，设交通标志，危险地带设危险信号及禁止通行标志",{"key":30,"text":611,"correct":35},"保证特殊工种使用工具、器械质量合格，技术性能良好",{"key":33,"text":613,"correct":22},"现场设消火栓，有足够的有效的灭火器材、设施",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":36,"analysis":37},1270485,"施工项目成本核算所提供的各种成本信息是（ ）等各个环节的依据。",[618,620,622,624,626],{"key":20,"text":619,"correct":22},"成本预测",{"key":24,"text":621,"correct":22},"成本计划",{"key":27,"text":623,"correct":22},"成本控制",{"key":30,"text":625,"correct":22},"成本分析和成本考核",{"key":33,"text":627,"correct":35},"成本节约",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":67,"analysis":37},1270486,"施工成本管理的任务主要包括（ ）。",[632,633,634,636,638],{"key":20,"text":619,"correct":22},{"key":24,"text":621,"correct":22},{"key":27,"text":635,"correct":35},"成本执行评价",{"key":30,"text":637,"correct":22},"成本核算",{"key":33,"text":625,"correct":22},{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":653,"analysis":37},1270487,"下列属于进度纠偏的管理措施的是（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"调整进度管理的方法和手段",{"key":24,"text":646,"correct":22},"强化合同管理",{"key":27,"text":648,"correct":35},"改变施工方法",{"key":30,"text":650,"correct":35},"改变施工机具",{"key":33,"text":652,"correct":35},"及时解决工程款支付","AB",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":653,"analysis":37},1270488,"质量验收的基本单元是（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"分项工程",{"key":24,"text":661,"correct":22},"检验批工程",{"key":27,"text":663,"correct":35},"分部工程",{"key":30,"text":665,"correct":35},"单位工程",{"key":33,"text":667,"correct":35},"总体工程",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":682,"analysis":37},1270489,"进度计划的调整方法中，“在实施进度计划分析基础上，确定调整原计划方法主要有以下几种：（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"改变某些工作的逻辑关系",{"key":24,"text":675,"correct":35},"改变某些设施的逻辑关系",{"key":27,"text":677,"correct":22},"改变某些工作的持续时间",{"key":30,"text":679,"correct":35},"改变某些节点的持续时间",{"key":33,"text":681,"correct":35},"改变某些工作的工艺关系","AC",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":255,"analysis":37},1270490,"属于部门控制式项目组织缺点的是（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":35},"各类人员来自不同部门，互相不熟悉",{"key":24,"text":690,"correct":22},"不能适应大型项目管理需要，而真正需要进行施工项目管理的工程正是大型项目",{"key":27,"text":692,"correct":22},"不利于对计划体系下的组织体制（固定建制）进行调整",{"key":30,"text":694,"correct":22},"不利于精简机构",{"key":33,"text":696,"correct":35},"具有不同的专业背景，难免配合不力",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":285,"analysis":37},1270491,"编制施工安全技术措施应符合下列（ ）的要求。",[701,703,705,707,709],{"key":20,"text":702,"correct":22},"根据不同分部分项工程的施工方法和施工工艺可能给施工带来的不安全因素，制定相应的施工安全技术措施，真正做到从技术上采取措施保证其安全实施",{"key":24,"text":704,"correct":35},"使用的各种机械动力设备、用电设备等给施工人员可能带来危险因素，从安全保险装置等方面采取的技术措施",{"key":27,"text":706,"correct":22},"针对施工现场及周围环境，可能给施工人员或周围居民带来危害，以及材料、设备运输带来的不安全因素，从技术上采取措施，予以保护",{"key":30,"text":708,"correct":22},"施工中有毒有害、易燃易爆等作业，可能给施工人员造成的危害，从技术上采取措施，防止伤害事故",{"key":33,"text":710,"correct":35},"制定的施工安全技术措施需符合各地颁布的施工安全技术规范及标准",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":300,"analysis":37},1270492,"施工成本控制的依据包括以下内容（ ）。",[715,717,719,721,723],{"key":20,"text":716,"correct":22},"工程承包合同",{"key":24,"text":718,"correct":35},"施工组织设计、分包合同文本",{"key":27,"text":720,"correct":22},"进度报告",{"key":30,"text":722,"correct":22},"施工成本计划",{"key":33,"text":724,"correct":22},"工程变更",{"id":726,"libraryId":5,"type":15,"typeLabel":16,"stem":727,"options":728,"answer":270,"analysis":37},1270493,"施工项目成本管理的措施主要有（ ）。",[729,731,733,735,737],{"key":20,"text":730,"correct":35},"管理措施",{"key":24,"text":732,"correct":22},"技术措施",{"key":27,"text":734,"correct":22},"经济措施",{"key":30,"text":736,"correct":22},"合同措施",{"key":33,"text":738,"correct":22},"组织措施",[740,744,747,750,753,756],{"id":741,"name":742,"category":7,"favorite":743},1,"领导干部任职前廉政法规知识测试题",92,{"id":745,"name":746,"category":7,"favorite":741},595,"建筑结构与设备",{"id":748,"name":749,"category":7,"favorite":741},715,"招标采购专业知识与法律法规",{"id":751,"name":752,"category":7,"favorite":741},848,"市政方向-通用基础",{"id":754,"name":755,"category":7,"favorite":8},534,"BIM工程师",{"id":757,"name":755,"category":7,"favorite":8},535]