[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270531":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1270531,857,2,"多选题","进度控制的技术措施主要包括：（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","采用多级网络计划技术和其他先进适用的计划技术",true,{"key":16,"text":17,"correct":14},"B","组织流水作业，保证作业连续、均衡、有节奏",{"key":19,"text":20,"correct":14},"C","采用电子计算机控制进度的措施",{"key":22,"text":23,"correct":14},"D","采用先进高效的技术和设备",{"key":25,"text":26,"correct":27},"E","建立图纸审查、及时办理工程变更和设计变更手续的措施",false,"ABCD","进度控制的技术措施：采用多级网络计划技术和其他先进适用的计划技术；组织流水作业，保证作业连续、均衡、有节奏；采用电子计算机控制进度的措施；采用先进高效的技术和设备；缩短作业时间，减少技术间歇。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)基础知识","建筑工程",0]