[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270523":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1270523,857,2,"多选题","以下属于项目目标动态控制纠偏措施的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","组织措施",true,{"key":16,"text":17,"correct":14},"B","管理措施",{"key":19,"text":20,"correct":14},"C","经济措施",{"key":22,"text":23,"correct":24},"D","安全措施",false,{"key":26,"text":27,"correct":14},"E","技术措施","ABCE","项目目标动态控制的纠偏措施：组织措施、管理措施、经济措施、技术措施。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)基础知识","建筑工程",0]