[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270520":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1270520,857,2,"多选题","限额领料依据有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","正确的工程量",true,{"key":16,"text":17,"correct":14},"B","现行的施工预算定额或企业内部消耗定额",{"key":19,"text":20,"correct":14},"C","施工组织设计",{"key":22,"text":23,"correct":14},"D","工程变更单",{"key":25,"text":26,"correct":27},"E","现场情况及货源供应情况",false,"ABCD","限额领料依据有正确的工程量、现行的施工预算定额或企业内部消耗定额、施工组织设计、工程变更单。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)基础知识","建筑工程",0]