[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270518":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1270518,857,2,"多选题","施工过程所需的资金来源为（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","预收工程备料款",true,{"key":16,"text":17,"correct":14},"B","已完施工施工价款结算",{"key":19,"text":20,"correct":14},"C","内部银行贷款",{"key":22,"text":23,"correct":14},"D","其他项目资金的调剂",{"key":25,"text":26,"correct":27},"E","工程集资款",false,"ABCD","施工过程所需的资金来源为预收工程备料款、.已完施工施工价款结算、内部银行贷款、其他项目资金的调剂。",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)基础知识","建筑工程",0]