[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270490":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1270490,857,2,"多选题","属于部门控制式项目组织缺点的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","各类人员来自不同部门，互相不熟悉",false,{"key":16,"text":17,"correct":18},"B","不能适应大型项目管理需要，而真正需要进行施工项目管理的工程正是大型项目",true,{"key":20,"text":21,"correct":18},"C","不利于对计划体系下的组织体制（固定建制）进行调整",{"key":23,"text":24,"correct":18},"D","不利于精简机构",{"key":26,"text":27,"correct":14},"E","具有不同的专业背景，难免配合不力","BCD","部门控制式项目组织缺点：1.不能适应大型项目管理需要。2.不利于对计划体系下的组织体制（固定建制）进行调整3.不利于精简机构",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)基础知识","建筑工程",0]