[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270449":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1270449,857,2,"多选题","土方开挖前需做好准备工作，包括（ ）等。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","清除障碍物",true,{"key":16,"text":17,"correct":14},"B","设置排水设施",{"key":19,"text":20,"correct":14},"C","设置测量控制网",{"key":22,"text":23,"correct":14},"D","修建临时设施",{"key":25,"text":26,"correct":27},"E","地基验槽",false,"ABCD","土方开挖前需做好准备工作，包括清除障碍物，设置排水设施，设置测量控制网，修建临时设施等",{"id":6,"name":31,"category":32,"favorite":33},"(土建质量)基础知识","建筑工程",0]