[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1270363":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1270363,857,1,"单选题","屋面工程验收后，应填写分部工程质量验收记录，交建设单位和（ ）存档。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工单位",true,{"key":16,"text":17,"correct":18},"B","监理单位",false,{"key":20,"text":21,"correct":18},"C","设计单位",{"key":23,"text":24,"correct":18},"D","城建单位","屋面工程在开始施工到验收的整个过程中，应不断收集有关资料，并在分部工程验收前完成所有资料的整理工作，交监理工程师审查合格后提出分部工程验收申请，分部工程验收完成后，应及时填写分部工程质量验收记录，交建设单位和施工单位存档。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)基础知识","建筑工程",0]