[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269851":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1269851,857,3,"判断题","业主指定分包方在施工过程中可以不接受施工总承包方或施工总承包管理方的工作指令。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"分包单位和总承包单位签订的直接合同。",{"id":6,"name":21,"category":22,"favorite":23},"(土建质量)基础知识","建筑工程",0]