[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269843":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1269843,857,1,"单选题","施工项目管理的管理时限指（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程施工到竣工交付",false,{"key":16,"text":17,"correct":14},"B","工程投标到工程竣工交付",{"key":19,"text":20,"correct":14},"C","项目设计到竣工交付",{"key":22,"text":23,"correct":24},"D","从施工企业角度出发的工程项目的生命期",true,"施工项目管理的管理时限指从施工企业角度出发的工程项目的生命期。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)基础知识","建筑工程",0]