[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269810":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1269810,857,3,"判断题","分包方的成本目标是由分包合同确定的。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"分包方的成本目标是由总包合同确定的。",{"id":6,"name":21,"category":22,"favorite":23},"(土建质量)基础知识","建筑工程",0]