[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269808":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1269808,857,3,"判断题","隐蔽工程在隐蔽前应由施工单位通知有关单位进行验收，并应形成验收文件。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"隐蔽工程在隐蔽前应由施工单位通知有关单位进行验收，并应形成验收文件。",{"id":6,"name":21,"category":22,"favorite":23},"(土建质量)基础知识","建筑工程",0]