[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269765":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1269765,857,1,"单选题","以下选项中不属于施工项目管理的客体的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工对象",false,{"key":16,"text":17,"correct":14},"B","施工活动",{"key":19,"text":20,"correct":14},"C","施工的相关生产要素",{"key":22,"text":23,"correct":24},"D","项目经理部",true,"工程项目投资建设周期内的各项任务和内容是施工项目管理的客体。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)基础知识","建筑工程",0]