[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269731":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1269731,857,1,"单选题","以下选项不是限额领料形式的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","按分项工程实行限额领料",false,{"key":16,"text":17,"correct":14},"B","按工程部位实行限额领料",{"key":19,"text":20,"correct":14},"C","按单位工程实行限额领料",{"key":22,"text":23,"correct":24},"D","按工程进度实行限额领料",true,"针对不同的施工方式采取不同的方法开展限额领料的工作。限额领料依据有:正确的工程量、现行的施工预算定额或企业内部消耗定额、施工组织设计、工程变更单。限额领料的形式有:按分项工程实行限额领料、按工程部位实行限额领料、按单位工程限额领料3种。",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)基础知识","建筑工程",0]