[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269598":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1269598,857,1,"单选题","在涂膜防水屋面施工的工艺流程中，喷涂基层处理剂后，紧跟的工作是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","节点部位增强处理",true,{"key":16,"text":17,"correct":18},"B","表面基层清理",false,{"key":20,"text":21,"correct":18},"C","涂布大面防水涂料",{"key":23,"text":24,"correct":18},"D","铺贴大屋面胎体增强材料","涂膜防水屋面施工的工艺流程中，喷涂基层处理剂后，紧跟的工作是节点部位增强处理",{"id":6,"name":27,"category":28,"favorite":29},"(土建质量)基础知识","建筑工程",0]