[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":430},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,9,50,726,[13,38,53,67,79,94,109,124,138,152,167,181,190,204,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316,322,328,334,340,346,352,358,364,370,376,382,388,394,400,406,412,418,424],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1269065,2,"多选题","施工完成的雨污水管道在回填前应该按照设计及规范要求进行闭水试验，试验结果由（ ）等参与各方签字确认。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","质监站",false,{"key":24,"text":25,"correct":26},"B","业主",true,{"key":28,"text":29,"correct":26},"C","监理",{"key":31,"text":32,"correct":22},"D","勘察",{"key":34,"text":35,"correct":26},"E","设计","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1269066,"以下选项中属于城建档案管理部门在进行工程档案预验收时重点验收的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"工程档案的内容真实、准确地反映工程建设活动和工程实际状况",{"key":24,"text":45,"correct":26},"文件的形成、来源符合实际，要求单位或个人签章的文件，其签章手续完备",{"key":28,"text":47,"correct":26},"工程档案齐全、系统、完整",{"key":31,"text":49,"correct":26},"文件材质、幅面、书写、绘图、用墨、托裱等符合要求",{"key":34,"text":51,"correct":26},"工程档案己整理立卷，立卷符合本规范的规定。","ABCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1269067,"路拌要有以下试验资料（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"混合料配合比实测数值（水泥、粉煤灰、石灰含量）",{"key":24,"text":60,"correct":26},"混合料的活性氧化物含量",{"key":28,"text":62,"correct":26},"混合料最大干密度",{"key":31,"text":64,"correct":26},"混合料颗粒筛析结果",{"key":34,"text":66,"correct":26},"混合料无侧限抗压强度（7d）",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":78,"analysis":37},1269068,"某工程竣工时，施工单位经过初验，认为已按合同约定的要求完成施工，提请作竣工验收，由于场地狭小，施工单位仍占用部分房屋作为办公用房，根据对竣工验收资料的要求，施工单位已将全部质量保证资料复印齐全供审核。经质量监督站初步抽验，观感、质量得分率为83％。质量保证资料未能通过，并提出了整改通知单。根据背景资料，回答以下问题： 建设单位收到工程竣工报告后，对符合竣工验收要求的工程，组织（ ）等单位组成验收组，制定验收方案。",[71,73,74,75,77],{"key":20,"text":72,"correct":22},"材料供应商",{"key":24,"text":32,"correct":26},{"key":28,"text":35,"correct":26},{"key":31,"text":76,"correct":26},"施工",{"key":34,"text":29,"correct":26},"BCDE",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":93,"analysis":37},1269069,"分项工程可按主要（ ）等进行划分。",[83,85,87,89,91],{"key":20,"text":84,"correct":26},"工种",{"key":24,"text":86,"correct":26},"材料",{"key":28,"text":88,"correct":26},"施工工艺",{"key":31,"text":90,"correct":26},"设备类别",{"key":34,"text":92,"correct":22},"工程部位","ABCD",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},1269070,"工程建设项目，特别是市政工程建设项目具有建设规模大、（ ）等特点。这一特点，决定了质量策划的难度。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"检测技术不完善",{"key":24,"text":101,"correct":26},"分期建设",{"key":28,"text":103,"correct":26},"多种专业配合",{"key":31,"text":105,"correct":26},"对施工工艺和施工方法的要求高",{"key":34,"text":107,"correct":22},"专业性强","BCD",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},1269071,"工程项目建设人力资源组织复杂，有（ ），此外还有分包企业人员和劳务人员。",[113,115,117,119,121],{"key":20,"text":114,"correct":26},"企业的管理人员",{"key":24,"text":116,"correct":26},"现场施工专业人员",{"key":28,"text":118,"correct":22},"工程管理人员",{"key":31,"text":120,"correct":26},"作业人员",{"key":34,"text":122,"correct":22},"政府监管人员","ABD",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":108,"analysis":37},1269072,"施工机械设备是指施工过程中使用的各类机具设备，包括运输设备、（ ）以及施工安全设施等。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"施工器具",{"key":24,"text":131,"correct":26},"操作工具",{"key":28,"text":133,"correct":26},"测量仪器",{"key":31,"text":135,"correct":26},"计量器具",{"key":34,"text":137,"correct":22},"检测器具",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":52,"analysis":37},1269073,"强制性标准监督检查的内容包括（ ）。",[142,144,146,148,150],{"key":20,"text":143,"correct":26},"有关工程技术人员是否熟悉、掌握强制性标准",{"key":24,"text":145,"correct":26},"工程项目的规划、勘察、设计、施工、验收等是否符合强制性标准的规定",{"key":28,"text":147,"correct":26},"工程项目采用的材料、设备是否符合强制性标准的规定",{"key":31,"text":149,"correct":26},"工程项目的安全、质量是否符合强制性标准的规定",{"key":34,"text":151,"correct":26},"工程中采用的导则、指南、手册、计算机软件的内容是否符合强制性标准的规定",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":166,"analysis":37},1269074,"工程建设强制性标准是指直接涉及工程（ ）等方面的工程建设标准强制性条文。",[156,158,160,162,164],{"key":20,"text":157,"correct":26},"质量",{"key":24,"text":159,"correct":22},"进度",{"key":28,"text":161,"correct":26},"安全",{"key":31,"text":163,"correct":22},"造价",{"key":34,"text":165,"correct":26},"卫生及环境保护","ACE",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":180,"analysis":37},1269075,"影响施工质量的因素主要包括五大方面：（ ）、方法和环境。在施工过程中正确这五方面因素严加控制是保证工程质量的关键。",[171,173,175,177,178],{"key":20,"text":172,"correct":26},"人员",{"key":24,"text":174,"correct":22},"设备",{"key":28,"text":176,"correct":26},"机械",{"key":31,"text":86,"correct":26},{"key":34,"text":179,"correct":22},"规程","ACD",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":180,"analysis":37},1269076,"影响施工质量的因素主要包括（ ）、方法和环境。",[185,186,187,188,189],{"key":20,"text":172,"correct":26},{"key":24,"text":174,"correct":22},{"key":28,"text":176,"correct":26},{"key":31,"text":86,"correct":26},{"key":34,"text":179,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":93,"analysis":37},1269077,"建筑工程施工质量验收划分为（ ）。",[194,196,198,200,202],{"key":20,"text":195,"correct":26},"单位工程",{"key":24,"text":197,"correct":26},"分部工程",{"key":28,"text":199,"correct":26},"分项工程",{"key":31,"text":201,"correct":26},"检验批",{"key":34,"text":203,"correct":22},"工序",{"id":205,"libraryId":5,"type":206,"typeLabel":207,"stem":208,"options":209,"answer":213,"analysis":37},1269078,3,"判断题","质量管理人员应按照特长分工，控制质量计划的实施，并应按照规定保存过程相关记录。",[210,212],{"key":20,"text":211,"correct":22},"正确",{"key":24,"text":213,"correct":26},"错误",{"id":215,"libraryId":5,"type":206,"typeLabel":207,"stem":216,"options":217,"answer":211,"analysis":37},1269079,"当不合格品通知方和接收方意见不能协调时，则上级质量监督检查部门、公司质量主管负责人，乃至项目部负责人裁决。",[218,219],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":221,"libraryId":5,"type":206,"typeLabel":207,"stem":222,"options":223,"answer":211,"analysis":37},1269080,"收集的资料主要有施工规范规程、质量评定标准和类似的工程经验等资料。",[224,225],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":227,"libraryId":5,"type":206,"typeLabel":207,"stem":228,"options":229,"answer":213,"analysis":37},1269081,"制订项目质量控制程序即根据项目部施工管理的基本程序，结合项目具体特点，在制订项目总体质量计划后，列出施工过程阶段、节点和总体质量水平有影响的项目，作为施工重点。",[230,231],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":233,"libraryId":5,"type":206,"typeLabel":207,"stem":234,"options":235,"answer":211,"analysis":37},1269082,"设置质量管理体系即建立由项目负责人领导，由技术质量负责人策划并组织实施，质量管理人员检查监督，项目专业分包商、施工作业队组各负其责的质量管理体系。",[236,237],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":239,"libraryId":5,"type":206,"typeLabel":207,"stem":240,"options":241,"answer":211,"analysis":37},1269083,"质量控制点是施工质量控制的重点，应依据工程施工的难点、关键工序来确定；因而是施工质量计划重要的组成内容。",[242,243],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":245,"libraryId":5,"type":206,"typeLabel":207,"stem":246,"options":247,"answer":213,"analysis":37},1269084,"项目部负责按照质量计划的要求在施工活动后实施。",[248,249],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":251,"libraryId":5,"type":206,"typeLabel":207,"stem":252,"options":253,"answer":211,"analysis":37},1269085,"质量计划编制阶段应重点了解工程项目组成、项目建设单位的项目质量目标，与项目施工组织设计中的施工方案、施工工艺等内容相结合进行编写。",[254,255],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":257,"libraryId":5,"type":206,"typeLabel":207,"stem":258,"options":259,"answer":213,"analysis":37},1269086,"项目技术负责人应定期组织具有资质的质检人员进行外部质量审核，并验证质量计划的实施效果，当项目控制中存在问题或隐患时，应提出解决措施。",[260,261],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":263,"libraryId":5,"type":206,"typeLabel":207,"stem":264,"options":265,"answer":211,"analysis":37},1269087,"质量策划的难点和重点就是落实质量职责和权限。（ ）",[266,267],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":269,"libraryId":5,"type":206,"typeLabel":207,"stem":270,"options":271,"answer":211,"analysis":37},1269088,"质量策划是对相关的过程进行的一种事先的安排和部署，而任何过程必须由人员来完成。",[272,273],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":275,"libraryId":5,"type":206,"typeLabel":207,"stem":276,"options":277,"answer":211,"analysis":37},1269089,"工程竣工后，与质量计划有关的文件由项目部及公司存档。",[278,279],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":281,"libraryId":5,"type":206,"typeLabel":207,"stem":282,"options":283,"answer":211,"analysis":37},1269090,"施工质量计划的主要内容包括：编制依据、项目概括、质量目标、组织机构、保证体系、质量控制过程与手段，关键过程和特殊过程及作业指导书。",[284,285],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":287,"libraryId":5,"type":206,"typeLabel":207,"stem":288,"options":289,"answer":213,"analysis":37},1269091,"根据市政工程施工特点，项目质量计划通常不被纳入施工组织设计。",[290,291],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":293,"libraryId":5,"type":206,"typeLabel":207,"stem":294,"options":295,"answer":211,"analysis":37},1269092,"项目部技术负责人应定期组织具有资质的质检人员进行内部质量审核，且验证质量计划的实施效果，当项目控制中存在问题或隐患时，应提出解决措施。",[296,297],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":299,"libraryId":5,"type":206,"typeLabel":207,"stem":300,"options":301,"answer":213,"analysis":37},1269093,"质量策划的难点和重点就是落实质量职责。",[302,303],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":305,"libraryId":5,"type":206,"typeLabel":207,"stem":306,"options":307,"answer":211,"analysis":37},1269094,"在承包合同环境下质量计划是企业向顾客表明质量管理方针、目标及其具体实现的方法、手段和措施，体现企业对质量责任的承诺和实施的具体步骤。",[308,309],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":311,"libraryId":5,"type":206,"typeLabel":207,"stem":312,"options":313,"answer":213,"analysis":37},1269095,"质量监督检查部门以图纸、技术资料、检测记录为依据用书面形式向以下各方发出通知：当分项分部项目工程不合格时通知项目负责人；当分项工程不合格时通知项目质量负责人和生产负责人；当单位工程不合格时通知项目负责人和公司主管经理。",[314,315],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":317,"libraryId":5,"type":206,"typeLabel":207,"stem":318,"options":319,"answer":211,"analysis":37},1269096,"施工质量计划的编制主体是施工承包企业，施工企业应规定质量目标、方针、企业标准以及项目施工质量计划编制批准的程序。",[320,321],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":323,"libraryId":5,"type":206,"typeLabel":207,"stem":324,"options":325,"answer":211,"analysis":37},1269097,"施工项目质量计划是指确定施工项目的质量目标、实现质量目标规定必要的作业过程、专门的质量措施和资源配置等工作。",[326,327],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":329,"libraryId":5,"type":206,"typeLabel":207,"stem":330,"options":331,"answer":211,"analysis":37},1269098,"对重复出现的质量问题，责任人应承担相应的责任，并依据评价结果接受处罚。",[332,333],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":335,"libraryId":5,"type":206,"typeLabel":207,"stem":336,"options":337,"answer":211,"analysis":37},1269099,"确定项目目标，首先应依据施工组织设计的项目质量总目标和工程项目的组成与划分，逐级分解，落实责任部门和个人。",[338,339],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":341,"libraryId":5,"type":206,"typeLabel":207,"stem":342,"options":343,"answer":211,"analysis":37},1269100,"施工项目质量计划是指确定施工项目的质量目标和如何达到这些质量目标所规定必要的作业过程、专门的质量措施和资源等工作。",[344,345],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":347,"libraryId":5,"type":206,"typeLabel":207,"stem":348,"options":349,"answer":213,"analysis":37},1269101,"当质量计划需修改时，由项目部质量员提出修改意见，报项目负责人审批。",[350,351],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":353,"libraryId":5,"type":206,"typeLabel":207,"stem":354,"options":355,"answer":211,"analysis":37},1269102,"质量计划实施中的每一过程都应体现计划、实施、检查、处理的持续改进过程。",[356,357],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":359,"libraryId":5,"type":206,"typeLabel":207,"stem":360,"options":361,"answer":211,"analysis":37},1269103,"在总承包的情况下，分包企业的施工质量计划是总包企业施工质量的组成部分。",[362,363],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":365,"libraryId":5,"type":206,"typeLabel":207,"stem":366,"options":367,"answer":213,"analysis":37},1269104,"确定达到目标的途径，即确定达到目标所需要的过程。这些过程要么是链式的，要么是并列的。",[368,369],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":371,"libraryId":5,"type":206,"typeLabel":207,"stem":372,"options":373,"answer":213,"analysis":37},1269105,"实施工程出现的不合格品，项目部质量管理部门有权提出返工修补处理、降级处理或作不合格品处理。",[374,375],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":377,"libraryId":5,"type":206,"typeLabel":207,"stem":378,"options":379,"answer":211,"analysis":37},1269106,"质量计划应重点体现质量控制，从工序、分项工程、分部工程到单位工程的过程控制，且体现从资源投入到完成工程项目最终检验和试验的全过程控制。",[380,381],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":383,"libraryId":5,"type":206,"typeLabel":207,"stem":384,"options":385,"answer":213,"analysis":37},1269107,"为满足工程项目合同质量要求和项目质量目标值的实现，项目开工后应由项目负责人主持编制质量计划。",[386,387],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":26},{"id":389,"libraryId":5,"type":206,"typeLabel":207,"stem":390,"options":391,"answer":211,"analysis":37},1269108,"施工质量控制的依据主要是指那些适用于工程项目施工阶段与质量控制有关的通用的、具有普遍指导意义和必须遵守的基本文件。",[392,393],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":395,"libraryId":5,"type":206,"typeLabel":207,"stem":396,"options":397,"answer":211,"analysis":37},1269109,"施工项目完工后，施工单位应自行组织有关人员进行检验，并将资料与自检结果，报监理单位申请验收。",[398,399],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":401,"libraryId":5,"type":206,"typeLabel":207,"stem":402,"options":403,"answer":211,"analysis":37},1269110,"技术质量负责人在施工前要向施工作业班组进行认真交底，使每一个控制点上的施工人员明白施工操作规程及质量检（试）验评定标准，掌握施工操作要领；在施工过程中，相关施工技术管理和质量管理人员要在现场进行重点指导和检查验收。",[404,405],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":407,"libraryId":5,"type":206,"typeLabel":207,"stem":408,"options":409,"answer":211,"analysis":37},1269111,"建设单位项目负责人应根据监理单位的工程竣工报告组织建设、勘查、设计、施工、监理项目负责人，并邀请监督部门参加工程验收。",[410,411],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":413,"libraryId":5,"type":206,"typeLabel":207,"stem":414,"options":415,"answer":211,"analysis":37},1269112,"灌注孔桩时，混凝土面的高程应比设计高程高出80~100cm左右，灌注完毕后即可抽掉泥浆，挖除桩顶浮浆，但必须留下20cm左右等混凝土完全凝固后再进行凿除，以保证不扰动桩顶混凝土。",[416,417],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":419,"libraryId":5,"type":206,"typeLabel":207,"stem":420,"options":421,"answer":211,"analysis":37},1269113,"工程施工质量有着严格的要求和标准，应满足设计要求和标准规定；市政工程施工质量还需要满足使用功能要求和安全性要求。",[422,423],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},{"id":425,"libraryId":5,"type":206,"typeLabel":207,"stem":426,"options":427,"answer":211,"analysis":37},1269114,"质量控制点是指对工程项目的性能、安全、寿命、可靠性等有一定影响的关键部位及对下道工序有影响的关键工序，为保证工程质量需要进行控制的重点、关键部位或薄弱环节，需在施工过程中进行严格管理，以使关键工序及部位处于良好的控制状态。",[428,429],{"key":20,"text":211,"correct":26},{"key":24,"text":213,"correct":22},[431,435,438,441,444,447],{"id":432,"name":433,"category":7,"favorite":434},1,"领导干部任职前廉政法规知识测试题",92,{"id":436,"name":437,"category":7,"favorite":432},595,"建筑结构与设备",{"id":439,"name":440,"category":7,"favorite":432},715,"招标采购专业知识与法律法规",{"id":442,"name":443,"category":7,"favorite":432},848,"市政方向-通用基础",{"id":445,"name":446,"category":7,"favorite":8},534,"BIM工程师",{"id":448,"name":446,"category":7,"favorite":8},535]