[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":717},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,8,50,726,[13,38,52,67,82,97,112,126,141,155,169,184,198,212,225,240,255,269,284,299,313,327,341,355,366,380,394,408,422,436,450,464,478,492,502,516,530,544,558,572,586,600,614,629,642,656,670,680,694,708],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1269015,2,"多选题","基桩检测中以下哪些情况应采用静载法进一步验证。（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","桩身存在缺陷，无法判定桩的竖向承载力",true,{"key":24,"text":25,"correct":22},"B","桩身缺陷对水平承载力有影响",{"key":27,"text":28,"correct":22},"C","单击贯人度大，桩底同向反射强烈且反射峰较宽，侧阻力波、端阻力波反射弱，即波形表现出竖向承载性状明显与勘察报告中的地质条件不符合",{"key":30,"text":31,"correct":22},"D","嵌岩桩桩底同向反射强烈，且在时间2L\u002Fc后无明显端阻力反射",{"key":33,"text":34,"correct":35},"E","嵌岩桩桩底同向反射强烈，且在时间L\u002FC后无明显端阻力反射",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},1269016,"低应变法测试参数设定应符合下列规定（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"时域信号记录的时间段长度应在2L\u002Fc时刻后延续不少于5ms；幅频信号分析的频率范围上限不应小于2000Hz",{"key":24,"text":45,"correct":22},"设定桩长应为桩顶测点至桩底的施工桩长，设定桩身截面积应为施工截面积",{"key":27,"text":47,"correct":22},"桩身波速可根据本地区同类型桩的测试值初步设定",{"key":30,"text":49,"correct":22},"采样时间间隔或采样频率应根据桩长、桩身波速和频域分辨率合理选择；时域信号采样点数不宜少于1024点",{"key":33,"text":51,"correct":35},"采样时间间隔宜为50~200μs，信号采样点数不宜少于1024点",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1269017,"材料与混凝土检测内容包括（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"原材料及构配件试验检（试）验（水泥、钢筋、骨料、外加剂、预应力配件等",{"key":24,"text":59,"correct":22},"混凝土强度及结构外观",{"key":27,"text":61,"correct":22},"预制构件结构性能",{"key":30,"text":63,"correct":22},"钢结构",{"key":33,"text":65,"correct":22},"构筑物","ABCDE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1269018,"钢筋混凝土管道内水压试验中正确的是（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"蒸汽养护的管子龄期不宜少于14d，自然养护的管子龄期不宜少于28d",{"key":24,"text":74,"correct":35},"允许试验前将管子浸润12h",{"key":27,"text":76,"correct":22},"管内充水直到排尽管内的空气，关闭排气阀。开始用加压泵加压，宜在1min内均匀升至规定检验压力值保持10min",{"key":30,"text":78,"correct":22},"允许采用专用装置检查管体的内水压力和接头密封性",{"key":33,"text":80,"correct":22},"管子表面的附着水应擦掉，清理管子两端，使管子轴线与堵头中心对正，将堵头锁紧","ACDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1269019,"同条件养护试块强度检测的试件的取样频率和数量应符合下列规定（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"每100盘，但不超过100m3的同配合比的混凝土，取样次数不应少于一次",{"key":24,"text":89,"correct":22},"每一工作班拌制的同配合比的混凝土不足100盘和100m3的同配合比的混凝土，取样次数不应少于一次",{"key":27,"text":91,"correct":35},"当一次连续浇筑超过1000m3时，同一配合比的混凝土每100m3取样不应少于一次",{"key":30,"text":93,"correct":22},"每一楼层，同一配合比的混凝土，取样不应少于一次",{"key":33,"text":95,"correct":22},"每次取样应至少留置一组标准养护试件","ABDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1269020,"水泥砂浆强度的合格标准（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"同强度等级试件的平均强度不低于设计强度等级",{"key":24,"text":104,"correct":22},"任意一组试件的强度等级最低值不低于设计强度等级的75％",{"key":27,"text":106,"correct":35},"在一组抗压的3个试块中，强度最大值与强度最小值，与中间值之差，均超过中间值的20%",{"key":30,"text":108,"correct":22},"在一组抗压的3个试块中，强度最大值与强度最小值，与中间值之差，均超过中间值的10％",{"key":33,"text":110,"correct":35},"任意一组试件的强度等级最低值不低于设计强度等级的85％","ABD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":96,"analysis":37},1269021,"单位工程质量验收包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"单位工程所含分部工程的质量均验收合格",{"key":24,"text":119,"correct":22},"质量控制资料完整",{"key":27,"text":121,"correct":35},"单位工程所含分项工程中有关安全、节能、环保和主要使用功能的检验资料完整",{"key":30,"text":123,"correct":22},"主要使用功能的抽查结果符合相关专业验收规范的规定",{"key":33,"text":125,"correct":22},"外观质量符合要求",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1269022,"下列属于支座分项工程的是（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"垫石混凝土",{"key":24,"text":133,"correct":35},"预应力混凝土",{"key":27,"text":135,"correct":22},"挡块混凝土",{"key":30,"text":137,"correct":22},"支座安装",{"key":33,"text":139,"correct":35},"支座拆除","ACD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":36,"analysis":37},1269023,"主控项目是涉及（ ）起决定作用的检验项目。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"结构安全",{"key":24,"text":148,"correct":22},"节能",{"key":27,"text":150,"correct":22},"环境保护",{"key":30,"text":152,"correct":22},"主要使用功能",{"key":33,"text":154,"correct":35},"经济",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":140,"analysis":37},1269024,"下列主控项目包括的主要内容有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"重要材料、成品、半成品及附件的材质，检查出厂证明及试验数据",{"key":24,"text":162,"correct":35},"外观质量",{"key":27,"text":164,"correct":22},"结构的强度、刚度和稳定性等数据，检查试验报告",{"key":30,"text":166,"correct":22},"工程进行中和完毕后必须进行检测，现场抽查或检查试测记录",{"key":33,"text":168,"correct":35},"允许偏差项目",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1269025,"某城市桥梁工程，采用板式橡胶支座，支座进场时施工项目部质检员按每次进场数量的80％进行抽检。支座安装质量验收时，现场检查：95％支座与梁底及垫石之间间隙不大于3mm 支座的粘结灌浆和润滑材料应符合设计要求，其检验方法为（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"检查粘结灌浆材料的配合比通知单",{"key":24,"text":176,"correct":22},"检查润滑材料的产品合格证",{"key":27,"text":178,"correct":22},"进场验收记录",{"key":30,"text":180,"correct":35},"施工记录",{"key":33,"text":182,"correct":35},"见证取样报告","ABC",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":36,"analysis":37},1269026,"分部工程的验收内容包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"分项工程",{"key":24,"text":191,"correct":22},"质量控制资料",{"key":27,"text":193,"correct":22},"安全和功能检验报告",{"key":30,"text":195,"correct":22},"观感质量验收",{"key":33,"text":197,"correct":35},"节能环保抽样检验报告",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":36,"analysis":37},1269027,"当分部工程较大或较复杂时，可按（ ）等划分为若干子分部工程。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"材料种类",{"key":24,"text":205,"correct":22},"施工特点",{"key":27,"text":207,"correct":22},"施工程序",{"key":30,"text":209,"correct":22},"专业系统及类别",{"key":33,"text":211,"correct":35},"建筑部位",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":96,"analysis":37},1269028,"分项工程应按（ ）等进行划分。",[216,218,220,221,223],{"key":20,"text":217,"correct":22},"主要工种",{"key":24,"text":219,"correct":22},"材料",{"key":27,"text":211,"correct":35},{"key":30,"text":222,"correct":22},"施工工艺",{"key":33,"text":224,"correct":22},"设备类别",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},1269029,"特别重大事故是指造成（ ）人以上死亡，或者（ ）人以上重伤，或者1亿元以上直接经济损失的事故。",[229,231,233,235,237],{"key":20,"text":230,"correct":35},"3",{"key":24,"text":232,"correct":35},"10",{"key":27,"text":234,"correct":22},"30",{"key":30,"text":236,"correct":35},"50",{"key":33,"text":238,"correct":22},"100","CE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},1269030,"按深度的不同，裂缝可分为（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"贯穿裂缝",{"key":24,"text":247,"correct":35},"穿透性裂缝",{"key":27,"text":249,"correct":22},"深层裂缝",{"key":30,"text":251,"correct":35},"微裂缝",{"key":33,"text":253,"correct":22},"表面裂缝","ACE",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":81,"analysis":37},1269031,"造成水稳基层表面松散起皮的原因有（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"集料拌合不均匀，堆放时间长",{"key":24,"text":262,"correct":35},"卸料时自然滑落，粗颗料中间多，两侧细粒多",{"key":27,"text":264,"correct":22},"刮风下雨造成表层细颗粒减少",{"key":30,"text":266,"correct":22},"铺筑时，因粗颗粒集中造成填筑层松散，压不实",{"key":33,"text":268,"correct":22},"运输过程中，急转弯、急刹车，熟料卸车不及时产生局部大碎石集中",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},1269032,"某主干道污水管道工程，设计采用直径700mm的HDPE高密度聚乙烯双壁波纹管。在沟槽开挖中，由于施工员未交代清楚，结果槽底挖深了20cm左右，施工员发现后，立即安排用挖出的土回填至设计高程。管道工程施工完毕后不到一个月发生沟槽位置沉陷，经查管道内部无明显问题。管道使用一年多时间后，发现有检查井四周沉降，井盖破损，管道塌瘪现象，造成排水不畅，需要返工。 检查井沉陷原因有（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"检查井周围回填材料不符合设计要求",{"key":24,"text":276,"correct":22},"回填分层厚度超出规范规定或根本没有分层夯实",{"key":27,"text":278,"correct":22},"检查井的混凝土基础未按设计要求施工到位，井底积水将基础浸泡，造成软弱，使承载力下降，井身受车辆荷载累积后逐步下陷",{"key":30,"text":280,"correct":35},"检查井井筒砌筑时，灰浆不饱满、勾缝不严，在荷载挤压下会造成井筒砖壁松动，同时又使用了多年，经历了季节变化，为井周围变形预埋下隐患",{"key":33,"text":282,"correct":22},"检查井井框与路面高差值过大，形成行驶冲击荷载，致使路基下沉造成检查井周边下沉、破损","ABCE",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},1269033,"钻孔灌注桩坍孔与缩径预防措施有哪些（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":35},"陆上埋设护筒时，在护筒底部夯填100cm厚黏土，必须夯打密实",{"key":24,"text":291,"correct":35},"孔内水位必须稳定地高出孔外水位1m以上，泥浆泵等钻孔配套设备能量应有一定的安全系数",{"key":27,"text":293,"correct":22},"钢筋笼的吊放、接长均应注意不碰撞孔壁",{"key":30,"text":295,"correct":22},"尽量缩短成孔后至浇筑混凝土的间隔时间",{"key":33,"text":297,"correct":22},"发生缩径时，可用钻头上下反复扫孔，将孔径扩大至设计要求","CDE",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":81,"analysis":37},1269034,"混凝土浇筑时出现缝隙、夹层的原因有（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"施工缝或变形缝未经接缝处理、未清除表面水泥薄膜和松动石子，未除去软弱混凝土层并充分湿润就灌筑混凝土",{"key":24,"text":306,"correct":35},"两层混凝土施工间隔时间过短",{"key":27,"text":308,"correct":22},"施工缝处混凝土浮屑、泥土等杂物未清除或未清除干净",{"key":30,"text":310,"correct":22},"混凝土浇灌高度过大，未设串筒、溜槽，造成混凝土离析",{"key":33,"text":312,"correct":22},"桩柱交接处续接施工未凿毛处理",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":66,"analysis":37},1269035,"下列属于桥头跳车的原因的是（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"台背填土施工工作面窄小，适合的施工机械少",{"key":24,"text":320,"correct":22},"填土范围控制不当，台背填土与路基衔接面太陡",{"key":27,"text":322,"correct":22},"填料不符合要求，且未采取相应技术措施",{"key":30,"text":324,"correct":22},"铺筑层超厚，压实度不够",{"key":33,"text":326,"correct":22},"挖基处理不当",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":96,"analysis":37},1269036,"依据住房和城乡建设部发布《关于做好房屋建筑和市政基础设施工程质量事故报告调查处理工作的通知》。根据工程造成的人员伤亡或者直接经济损失，工程质量事故分为以下（ ）等级。",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"特别重大事故",{"key":24,"text":334,"correct":22},"重大事故",{"key":27,"text":336,"correct":35},"较重事故",{"key":30,"text":338,"correct":22},"较大事故",{"key":33,"text":340,"correct":22},"一般事故",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":36,"analysis":37},1269037,"造成路基“弹簧”的原因有（ ）。",[345,347,349,351,353],{"key":20,"text":346,"correct":22},"填土为黏性土时的含水量超过最佳含水量较多",{"key":24,"text":348,"correct":22},"碾压层下有软弱层，且含水量过大，在上层碾压过程中，下层弹簧反射至上层",{"key":27,"text":350,"correct":22},"翻晒、拌合不均匀",{"key":30,"text":352,"correct":22},"局部填土混人冻土或过湿的淤泥、沼泽土、有机土、腐殖土以及含有草皮、树根和生活垃圾的不良填料",{"key":33,"text":354,"correct":35},"透水性好与透水性差的土壤混填，且透水性好的土壤包裹了透水性差的土壤，形成了“水壤”",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":66,"analysis":37},1269038,"出现路基“弹簧”现象的原因是（ ）。",[359,360,361,362,364],{"key":20,"text":346,"correct":22},{"key":24,"text":348,"correct":22},{"key":27,"text":350,"correct":22},{"key":30,"text":363,"correct":22},"局部填土混入冻土或过湿的淤泥、沼泽土、有机土、腐殖土以及含有草皮、树根和生活垃圾的不良填料",{"key":33,"text":365,"correct":22},"透水性好与透水性差的土壤混填，且透水性差的土壤包裹了透水性好的土壤，形成了“水壤”",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":66,"analysis":37},1269039,"道路路基工程检（试）验内容包括（ ）。",[370,372,374,376,378],{"key":20,"text":371,"correct":22},"土的含水率试验",{"key":24,"text":373,"correct":22},"液限和塑限联合测定法",{"key":27,"text":375,"correct":22},"土的击实试验",{"key":30,"text":377,"correct":22},"CBR值测试方法",{"key":33,"text":379,"correct":22},"土的压实度",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":81,"analysis":37},1269040,"下列哪几项是沟槽沉陷预防措施（ ）。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"要分层铺土进行夯实，铺土厚度应根据夯实或压实机具性能而定",{"key":24,"text":387,"correct":35},"沟槽回填土前，须将槽中积滞水、淤泥、杂物清理干净。回填土中不得含有碎砖及大于20cm的干硬土块，含水量大的黏土块及冻土块",{"key":27,"text":389,"correct":22},"每种土都应做出标准密度，回填土料应在最佳含水量和接近最佳含水量状态下进行夯实",{"key":30,"text":391,"correct":22},"铺土应保持一定的坡势，采用排降水的沟槽，一定要在夯实完毕后，方能停止排降水运行",{"key":33,"text":393,"correct":22},"在检查井周围和边角机械碾压不到位的地方，一定要有机动夯和人力夯补夯措施，不得出现局部漏夯",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":66,"analysis":37},1269041,"下列属于预防管道铺设偏差的是（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"在管道铺设前，必须对管道基础仔细复核，复核轴线位置、线形以及标高是否与设计标高吻合",{"key":24,"text":401,"correct":22},"稳管用垫块应事前按施工方案预制成形，安放位置准确",{"key":27,"text":403,"correct":22},"管道铺设操作应从下游向上游敷设，承口向上，切忌倒向排管",{"key":30,"text":405,"correct":22},"采取边线控制排管时所设边线应紧绷，防止中间下垂；采取中心线控制排管时应在中间铁撑柱上画线，将引线扎牢，防止移动，并随时观察，防止外界扰动",{"key":33,"text":407,"correct":22},"每节（根）管应先用样尺与样板架观察校验，然后再用水准尺检（试）验落水方向",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":36,"analysis":37},1269042,"水泥稳定土基层及底基层质量检验中外观检查要求无（ ）。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"推移",{"key":24,"text":415,"correct":22},"裂缝",{"key":27,"text":417,"correct":22},"贴皮",{"key":30,"text":419,"correct":22},"松散",{"key":33,"text":421,"correct":35},"花白",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":66,"analysis":37},1269043,"国家明确工程质量事故是指由于（ ）等单位违反工程质量有关法律法规和工程建设标准，使工程产生结构安全、重要使用功能等方面的质量缺陷，造成人身伤亡或者重大经济损失的事故。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"建设",{"key":24,"text":429,"correct":22},"勘察",{"key":27,"text":431,"correct":22},"设计",{"key":30,"text":433,"correct":22},"施工",{"key":33,"text":435,"correct":22},"监理",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":66,"analysis":37},1269044,"下列属于工程质量通病的是（ ）。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"现浇钢筋混凝土工程出现蜂窝、麻面、露筋",{"key":24,"text":443,"correct":22},"砂浆、混凝土配合比控制不严、试块强度不合格",{"key":27,"text":445,"correct":22},"路基压实度达不到标准规定值",{"key":30,"text":447,"correct":22},"钢筋安装箍筋间距不一致",{"key":33,"text":449,"correct":22},"桥面伸缩装置安置不平整",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":96,"analysis":37},1269045,"下列属于路面沉陷性、疲劳性裂缝质量问题及现象的是（ ）。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"路面产生非接茬部位不规则纵向裂缝，有时伴有路面沉陷变形",{"key":24,"text":457,"correct":22},"在雨水支管部位出现不规则顺管走向的裂缝；在检查井周围出现不规则裂缝",{"key":27,"text":459,"correct":35},"成片状的网状裂缝（裂块面积直径大于20cm）和龟背状的裂缝（裂块面积直径小于20cm）",{"key":30,"text":461,"correct":22},"外界水会沿路面裂缝渗人路面基层，甚至渗人土基，造成其承载能力下降，使路面过早损坏",{"key":33,"text":463,"correct":22},"裂缝部分，特别是裂缝密集的龟裂部分，受水浸人和车辆反复荷载的冲击，更会加速路面出现坑槽，车辙等严重损坏",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":66,"analysis":37},1269046,"下列属于造成管道铺设偏差的原因的是（ ）。",[468,470,472,474,476],{"key":20,"text":469,"correct":22},"管道轴线线形不直，又未予纠正",{"key":24,"text":471,"correct":22},"标高侧放误差，造成管底标高不符合设计要求，甚至发生水力坡度错误",{"key":27,"text":473,"correct":22},"稳管垫块放置的随意性，使用垫块与施工方案不符，致使管道铺设不稳定，接口不顺，影响流水畅通",{"key":30,"text":475,"correct":22},"承插管未按承口向上游、插口向下游的安放规定",{"key":33,"text":477,"correct":22},"管道铺设轴线未控制好，产生折点，线形不直",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":96,"analysis":37},1269047,"孔底沉渣过厚的预防措施有哪些（ ）。",[482,484,486,488,490],{"key":20,"text":483,"correct":22},"当采用正循环清孔时，前阶段应采用高黏度浓浆清孔，并加大泥浆泵的流量，使砂石粒能顺利地浮出孔口",{"key":24,"text":485,"correct":22},"孔底沉渣厚度符合设计要求后，应把孔内泥浆密度降至1.1~1.2g\u002Fc㎡",{"key":27,"text":487,"correct":35},"要准确测量孔底沉渣厚度，首先需准确测量桩的终孔深度，应采用丈量钻杆长度的方法测定，取孔内钻杆长度+钻头长度，钻头长度取至钻尖的1\u002F3处",{"key":30,"text":489,"correct":22},"清孔完毕立即灌注混凝土",{"key":33,"text":491,"correct":22},"采用导管二次清孔，冲孔时间以导管内测量的孔底沉渣厚度达到规范规定为准；提高混凝土初灌时对孔底的冲击力；导管底端距孔底控制在40~50cm",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":501,"analysis":37},1269048,"重大事故是指造成（ ）人以上（ ）人以下死亡，或者（ ）人以上（ ）人以下重伤，或者5000万元以上1亿元以下直接经济损失的事故。",[496,497,498,499,500],{"key":20,"text":230,"correct":35},{"key":24,"text":232,"correct":22},{"key":27,"text":234,"correct":22},{"key":30,"text":236,"correct":22},{"key":33,"text":238,"correct":22},"BCDE",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":66,"analysis":37},1269049,"现浇混凝土结构裂缝产生的原因有（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":22},"水泥水化热影响",{"key":24,"text":509,"correct":22},"内外约束条件的影响",{"key":27,"text":511,"correct":22},"外界气温变化的影响",{"key":30,"text":513,"correct":22},"混凝土的收缩变形",{"key":33,"text":515,"correct":22},"混凝土的沉陷裂缝",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":36,"analysis":37},1269050,"预防顶管顶进误差严重超标的措施有（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"必须在顶进中，建立和执行严格的校测制度和交接班制度，严格控制顶进中心和高程，及时校测、纠偏",{"key":24,"text":523,"correct":22},"对坑内引人的水准点及后视方向桩，要经常复测，发现问题及时纠正",{"key":27,"text":525,"correct":22},"根据地质水文资料，已知管位在地下水位以内时，应采取降水措施，对于在顶进中偶发的浅层滞水或土壤含水量较大管子有下沉可能时，应采取地基处理的方法予以解决",{"key":30,"text":527,"correct":22},"顶进中，管道发生中心或高程偏差时，用挖土校正法调整",{"key":33,"text":529,"correct":35},"当土层土质不好，或有地下水时及偏差超过20mm时，也可采用强制校正法来造成局部阻力，迫使管子向校正方向转移",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":66,"analysis":37},1269051,"下列属于造成水泥混凝土桥面铺装层的裂纹和龟裂的原因的是（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":22},"砂石原料质量不合格",{"key":24,"text":537,"correct":22},"水泥混凝土铺装层与梁板结构未能很好地连结成为整体，有“空鼓”现象",{"key":27,"text":539,"correct":22},"桥面铺装层内钢筋网下沉，上保护层过大，钢筋网未能起到防裂作用",{"key":30,"text":541,"correct":22},"铺装层厚度不够",{"key":33,"text":543,"correct":22},"未按施工方案要求进行养护及交通管制，桥面铺筑完成后养护不及时，在混凝土尚未达到设计强度时即开放交通，造成了铺装的早期破坏",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":96,"analysis":37},1269052,"下列哪几项是造成管道基础下沉的原因（ ）。",[548,550,552,554,556],{"key":20,"text":549,"correct":22},"槽底土体松软、含水量高，土体不稳定，基础变形下沉",{"key":24,"text":551,"correct":22},"当槽底土体遇有原暗浜或流砂现象，沟槽降水措施不良或井点失效，处理时间过长，直接造成已浇筑的水泥混凝土基础拱起甚至开裂",{"key":27,"text":553,"correct":35},"在浇筑水泥混凝土基础过程中突遇强降水，地下水大量冲人沟槽，使水泥浆流失，水泥混凝土结构损坏",{"key":30,"text":555,"correct":22},"土基压实度不合格，基础施工所用的水泥混凝土强度不合格",{"key":33,"text":557,"correct":22},"基座厚度偏差过大，不符合设计要求",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":183,"analysis":37},1269053,"下列属于路面接茬不平、松散，路面有轮迹质量问题及现象的是（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"使用摊铺机摊铺或人工摊铺，两幅之间纵向接茬不平，出现高差，或在接茬处出现松散掉渣现象",{"key":24,"text":565,"correct":22},"两次摊铺的横向接茬不平，有跳车",{"key":27,"text":567,"correct":22},"油路面与立道牙接茬或与其他构筑物接茬部位留有轮迹",{"key":30,"text":569,"correct":35},"横向接茬不平，松散不实，经车轮冲击、雨雪侵蚀，易出坑损坏",{"key":33,"text":571,"correct":35},"纵向接茬不平，有跳车，冲击路面易损坏",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":254,"analysis":37},1269054,"单位工程验收所需的资料有（ ）。",[576,578,580,582,584],{"key":20,"text":577,"correct":22},"单位（子单位）工程质量竣工验收记录",{"key":24,"text":579,"correct":35},"工程竣工报告",{"key":27,"text":581,"correct":22},"单位（子单位）工程安全和功能检（试）验资料核查及主要功能抽查记录",{"key":30,"text":583,"correct":35},"工程竣工验收证书",{"key":33,"text":585,"correct":22},"单位（子单位）工程观感质量检查记录",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":66,"analysis":37},1269055,"验收与移交的有关规定包括（ ）。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"工程参建各方应将各自的工程资料案卷归档保存",{"key":24,"text":593,"correct":22},"监理单位、施工单位应根据有关规定合理确定工程资料案卷的保存期限",{"key":27,"text":595,"correct":22},"建设单位工程资料案卷的保存期限应与工程使用年限相同",{"key":30,"text":597,"correct":22},"依法列入城建档案管理部门保存的工程档案资料，建设单位在工程竣工验收前应组织有关各方，提请城建档案管理部门对归档保存的工程资料进行预验收，并办理相关验收手续",{"key":33,"text":599,"correct":22},"国家和北京市重点工程及合同约定的市政基础设施工程，建设单位应将列入城建档案管理部门保存的工程档案资料制作成缩微胶片，提交城建档案管理部门保存",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":66,"analysis":37},1269056,"工程完工后由施工单位编写工程竣工报告，主要内容包括（ ）。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"工程概况",{"key":24,"text":607,"correct":22},"工程施工过程",{"key":27,"text":609,"correct":22},"合同及设计约定施工项目的完成情况",{"key":30,"text":611,"correct":22},"工程质量自检情况",{"key":33,"text":613,"correct":22},"主要设备调试情况",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":628,"analysis":37},1269057,"下列属于给排水管道功能性试验的有（ ）。",[618,620,622,624,626],{"key":20,"text":619,"correct":35},"混凝土强度",{"key":24,"text":621,"correct":22},"水压试验",{"key":27,"text":623,"correct":35},"压实度",{"key":30,"text":625,"correct":35},"砂浆强度",{"key":33,"text":627,"correct":22},"严密性试验","BE",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":81,"analysis":37},1269058,"下列选项中属于质量检查验收主要内容的有（ ）。",[633,635,637,639,640],{"key":20,"text":634,"correct":22},"基础\u002F主体结构工程验收",{"key":24,"text":636,"correct":35},"工序验收记录",{"key":27,"text":638,"correct":22},"工程竣工验收证明书",{"key":30,"text":579,"correct":22},{"key":33,"text":641,"correct":22},"施工测量监控记录",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":66,"analysis":37},1269059,"沥青混合料合格证包括（ ）。",[646,648,650,652,654],{"key":20,"text":647,"correct":22},"沥青混凝土类型",{"key":24,"text":649,"correct":22},"稳定值",{"key":27,"text":651,"correct":22},"流值",{"key":30,"text":653,"correct":22},"空隙率",{"key":33,"text":655,"correct":22},"饱和度",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":298,"analysis":37},1269060,"沥青材料在使用前必须复试的项目有（ ）。",[660,662,664,666,668],{"key":20,"text":661,"correct":35},"黏度",{"key":24,"text":663,"correct":35},"闪点",{"key":27,"text":665,"correct":22},"延度",{"key":30,"text":667,"correct":22},"针入度",{"key":33,"text":669,"correct":22},"软化点",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":283,"analysis":37},1269061,"建设单位应组织（ ）等单位对工程进行竣工验收，各单位应在单位（子单位）工程质量竣工验收记录上签字并加盖公章。",[674,675,676,677,679],{"key":20,"text":431,"correct":22},{"key":24,"text":435,"correct":22},{"key":27,"text":433,"correct":22},{"key":30,"text":678,"correct":35},"劳务",{"key":33,"text":429,"correct":22},{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":66,"analysis":37},1269062,"工程资料组卷应遵循的原则是：组卷应遵循工程文件资料的行程规律，保证卷内文件资料的内在联系，便于文件资料保管和利用；基建文件和监理资料可按一个项目或一个单位工程进行整理和组卷；施工资料应按单位工程进行组卷，可根据工程大小及资料的多少等具体情况选择按专业或按分部、分项等进行整理和组卷；（ ）。",[684,686,688,690,692],{"key":20,"text":685,"correct":22},"施工资料管理过程中形成的分项目录应与其对应的施工资料一起组卷",{"key":24,"text":687,"correct":22},"竣工图应按设计单位提供的各专业施工图序列组卷",{"key":27,"text":689,"correct":22},"工程资料可根据资料数量多少组成一卷或多卷",{"key":30,"text":691,"correct":22},"专业承包单位的工程资料应单独组卷",{"key":33,"text":693,"correct":22},"工程系统节能监测资料应单独组卷",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":81,"analysis":37},1269063,"在下列选项中，属于质量资料的有（ ）。",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"隐蔽\u002F预检工程的质量检查验收记录",{"key":24,"text":701,"correct":35},"施工日记",{"key":27,"text":703,"correct":22},"检验（收）批、分项工程的检查验收记录",{"key":30,"text":705,"correct":22},"分部工程、单位工程的验收记录",{"key":33,"text":707,"correct":22},"结构物实体功能性检测报告",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":501,"analysis":37},1269064,"建设单位应组织（ ）等单位对工程进行竣工验收，各单位应在单位（子单位）工程质量验收竣工验收记录上签字并加盖公章。",[712,713,714,715,716],{"key":20,"text":678,"correct":35},{"key":24,"text":435,"correct":22},{"key":27,"text":429,"correct":22},{"key":30,"text":431,"correct":22},{"key":33,"text":433,"correct":22},[718,722,725,728,731,734],{"id":719,"name":720,"category":7,"favorite":721},1,"领导干部任职前廉政法规知识测试题",92,{"id":723,"name":724,"category":7,"favorite":719},595,"建筑结构与设备",{"id":726,"name":727,"category":7,"favorite":719},715,"招标采购专业知识与法律法规",{"id":729,"name":730,"category":7,"favorite":719},848,"市政方向-通用基础",{"id":732,"name":733,"category":7,"favorite":8},534,"BIM工程师",{"id":735,"name":733,"category":7,"favorite":8},535]