[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":635},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,6,50,726,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,199,211,222,232,244,256,268,280,288,300,312,324,336,344,356,368,380,392,404,413,425,433,445,463,476,491,506,521,536,550,565,579,592,606,621],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1268913,1,"单选题","石灰材料进场时应按次取样，检测石灰的（ ）含量。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","碳酸钙",false,{"key":24,"text":25,"correct":22},"B","氢氧化钙和氢氧化镁",{"key":27,"text":28,"correct":29},"C","氧化钙和氧化镁",true,{"key":31,"text":32,"correct":22},"D","氢氧化钙和氧化镁","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1268914,"单位工程质量竣工验收记录中施工单位由（ ）签字确认。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目经理",{"key":24,"text":41,"correct":22},"项目副经理",{"key":27,"text":43,"correct":22},"项目总工",{"key":31,"text":45,"correct":29},"单位负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1268915,"下列选项中属于道路工程功能性检测的是。（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"压实度",{"key":24,"text":53,"correct":29},"弯沉",{"key":27,"text":55,"correct":22},"厚度",{"key":31,"text":57,"correct":22},"平整度",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1268916,"工程档案由（ ）向城建档案馆（室）移交，应办理移交手续，填写移交目录，双方签字、盖章后交接。",[62,64,66,68],{"key":20,"text":63,"correct":22},"监理单位",{"key":24,"text":65,"correct":22},"施工单位",{"key":27,"text":67,"correct":29},"建设单位",{"key":31,"text":69,"correct":22},"质量监督站",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1268917,"市政基础设施工程在（ ）进行功能性试验。",[74,76,78,80],{"key":20,"text":75,"correct":22},"竣工之前",{"key":24,"text":77,"correct":22},"竣工之后",{"key":27,"text":79,"correct":29},"交付使用之前",{"key":31,"text":81,"correct":22},"交付使用之后",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1268918,"下列墨水可以用于书写工程文件的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"纯蓝墨水",{"key":24,"text":89,"correct":22},"红色墨水",{"key":27,"text":91,"correct":22},"圆珠笔",{"key":31,"text":93,"correct":29},"碳素墨水",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1268919,"ISO族标准就是在（ ）、程序、过程、总结方面规范质量管理。",[98,100,102,104],{"key":20,"text":99,"correct":22},"范围",{"key":24,"text":101,"correct":22},"组织",{"key":27,"text":103,"correct":22},"职责",{"key":31,"text":105,"correct":29},"机构",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1268920,"备案机关发现建设单位在竣工验收过程中有违反国家有关建设工程质量管理规定行为的，应当在收讫竣工验收备案文件（ ）日内，责令停止使用，重新组织竣工验收。",[110,112,114,116],{"key":20,"text":111,"correct":22},"5",{"key":24,"text":113,"correct":22},"10",{"key":27,"text":115,"correct":29},"15",{"key":31,"text":117,"correct":22},"30",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1268921,"以下哪项不属于四大质量管理过程。（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"管理职责过程",{"key":24,"text":125,"correct":29},"机构管理过程",{"key":27,"text":127,"correct":22},"资源管理过程",{"key":31,"text":129,"correct":22},"产品实现过程",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1268922,"以下哪项不属于四个策划（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"质量管理体系策划",{"key":24,"text":137,"correct":22},"产品实现策划",{"key":27,"text":139,"correct":22},"设计和开发策划",{"key":31,"text":141,"correct":29},"机构管理策划",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1268923,"质量管理体系（ ）文件是用以规定质量管理工作的原则，阐述质量管理体系的构成，明确有关部门和人员的质量职能，规定各项活动的目的要求、内容和程序的文件。",[146,148,150,152],{"key":20,"text":147,"correct":22},"见证性",{"key":24,"text":149,"correct":29},"法规性",{"key":27,"text":151,"correct":22},"共性",{"key":31,"text":153,"correct":22},"特殊性",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1268924,"项目技术负责人的职责之一是负责施工组织设计、安全专项施工方案、关键部位、特殊工序以及（ ）技术交底。",[158,160,162,164],{"key":20,"text":159,"correct":29},"“四新”",{"key":24,"text":161,"correct":22},"“三全”",{"key":27,"text":163,"correct":22},"“三新”",{"key":31,"text":165,"correct":22},"隐蔽工程",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1268925,"以下哪项不属于资料员岗位职责（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"负责提供管理数据、信息资料",{"key":24,"text":173,"correct":22},"参与建立施工资料管理系统",{"key":27,"text":175,"correct":29},"负责汇总、整理、移交劳务管理资料",{"key":31,"text":177,"correct":22},"负责施工资料管理系统的运用、服务和管理",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1268926,"分项工程应由（ ）组织施工单位项目专业技术负责人等进行验收。",[182,184,186,188],{"key":20,"text":183,"correct":22},"建设单位负责人",{"key":24,"text":185,"correct":22},"建设单位项目负责人",{"key":27,"text":187,"correct":22},"总监理工程师",{"key":31,"text":189,"correct":29},"专业监理工程师",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1268927,"某工程竣工时，施工单位经过初验，认为已按合同约定的要求完成施工，提请作竣工验收，由于场地狭小，施工单位仍占用部分房屋作为办公用房，根据对竣工验收资料的要求，施工单位已将全部质量保证资料复印齐全供审核。经质量监督站初步抽验，观感、质量得分率为83％。质量保证资料未能通过，并提出了整改通知单。根据背景资料，回答以下问题： 本工程竣工验收后，应由（ ）负责向有关部门办理竣工备案。",[194,195,196,197],{"key":20,"text":67,"correct":29},{"key":24,"text":65,"correct":22},{"key":27,"text":63,"correct":22},{"key":31,"text":198,"correct":22},"设计单位",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},1268928,"项目负责人代表企业实施施工项目管理，组建项目部。贯彻执行国家法律、法规、政策和（ ）标准，执行企业的管理制度，维护企业的合法权益。",[203,205,207,209],{"key":20,"text":204,"correct":22},"合法性",{"key":24,"text":206,"correct":22},"合理性",{"key":27,"text":208,"correct":29},"强制性",{"key":31,"text":210,"correct":22},"自主性",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1268929,"分项工程应由专业监理工程师组织施工单位（ ）进行验收。",[215,216,218,220],{"key":20,"text":39,"correct":22},{"key":24,"text":217,"correct":29},"项目专业技术负责人",{"key":27,"text":219,"correct":22},"质量员",{"key":31,"text":221,"correct":22},"施工员",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},1268930,"建设单位应当自工程竣工验收合格之日起（ ）日内，依照本办法规定，向工程所在地的县级以上地方人民政府建设行政主管部门备案。",[226,228,230,231],{"key":20,"text":227,"correct":22},"3",{"key":24,"text":229,"correct":22},"8",{"key":27,"text":115,"correct":29},{"key":31,"text":117,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},1268931,"以下哪种不属于三种监视和测量（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"体系业绩监视和测量",{"key":24,"text":239,"correct":22},"过程的监视和测量",{"key":27,"text":241,"correct":22},"产品的监视和测量",{"key":31,"text":243,"correct":29},"结果的监视和测量",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":27,"analysis":33},1268932,"（ ）要对控制工程实体质量起主要作用，能保证工程的适用性、符合性。",[248,250,252,254],{"key":20,"text":249,"correct":22},"操作人员",{"key":24,"text":251,"correct":22},"资金",{"key":27,"text":253,"correct":29},"要素",{"key":31,"text":255,"correct":22},"责任",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},1268933,"市政工程质量管理中实施ISO9000标准的意义不包括（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"降低产品成本，提高经济效益",{"key":24,"text":263,"correct":22},"提高工作效率",{"key":27,"text":265,"correct":29},"提高工作质量",{"key":31,"text":267,"correct":22},"开拓国内外市场的需要。",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},1268934,"与一般的产品质量相比较，工程质量具有如下一些特点：影响因素多，质量变动（ ），决策、设计、材料、机械、环境、施工工艺、管理制度以及参建人员素质等均直接或间接地影响工程质量。",[272,274,276,278],{"key":20,"text":273,"correct":29},"大",{"key":24,"text":275,"correct":22},"小",{"key":27,"text":277,"correct":22},"较大",{"key":31,"text":279,"correct":22},"较小",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1268935,"工程质量监督机构应当在工程竣工验收之日起（ ）日内，向备案机关提交工程质量监督报告。",[284,285,286,287],{"key":20,"text":111,"correct":29},{"key":24,"text":113,"correct":22},{"key":27,"text":115,"correct":22},{"key":31,"text":117,"correct":22},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":27,"analysis":33},1268936,"工程施工质量验收应在施工单位自检基础上，按（ ）工程的顺序进行。",[292,294,296,298],{"key":20,"text":293,"correct":22},"分项工程、验收批、分部（子分部）工程、单位（子单位）",{"key":24,"text":295,"correct":22},"验收批、分部（子分部）工程、分项工程、单位（子单位）",{"key":27,"text":297,"correct":29},"验收批、分项工程、分部（子分部）工程、单位（子单位）",{"key":31,"text":299,"correct":22},"分项工程、分部（子分部）工程、验收批、单位（子单位）",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},1268937,"根据有关法律法规工程返修的规定，以下说法正确的是（ ）。",[304,306,308,310],{"key":20,"text":305,"correct":22},"对施工过程中出现质量问题的建设工程，若非施工单位原因造成的，施工单位不负责返修",{"key":24,"text":307,"correct":29},"对施工过程中出现质量问题的建设工程，无论是否施工单位原因造成的，施工单位都应负责返修",{"key":27,"text":309,"correct":22},"对竣工验收不合格的建设工程，若非施工单位原因造成的，施工单位不负责返修",{"key":31,"text":311,"correct":22},"对竣工验收不合格的建设工程，若是施工单位原因造成的，施工单位负责有偿返修",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},1268938,"由组织的最高管理者正式颁布的、该组织总的质量宗旨和方向叫作（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":29},"质量方针",{"key":24,"text":319,"correct":22},"质量目标",{"key":27,"text":321,"correct":22},"质量策划",{"key":31,"text":323,"correct":22},"质量保证",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":31,"analysis":33},1268939,"以下哪项不是施工岗位职责（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"参与施工组织管理策划",{"key":24,"text":331,"correct":22},"参与制订并调整施工进展计划、施工资源需求计划，编制施工作业计划",{"key":27,"text":333,"correct":22},"负责施工作业班组的技术交底",{"key":31,"text":335,"correct":29},"负责施工中技术质量问题的解决和处理",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},1268940,"分部工程应由（ ）组织施工单位项目负责人和项目技术、质量负责人进行验收。",[340,341,342,343],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":22},{"key":27,"text":187,"correct":29},{"key":31,"text":189,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1268941,"具备独立施工条件并能形成独立使用功能的建筑物及构筑物为一个（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":29},"单位工程",{"key":24,"text":351,"correct":22},"分项工程",{"key":27,"text":353,"correct":22},"分部工程",{"key":31,"text":355,"correct":22},"检验批",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},1268942,"虽然每个施工企业的过程具有独特性，但仍可确定一些典型过程，例如：企业管理过程，资源管理过程，实现过程，（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"测量、搜集绩效分析数据过程",{"key":24,"text":363,"correct":22},"反思过程",{"key":27,"text":365,"correct":22},"改进有效性和效率过程",{"key":31,"text":367,"correct":29},"测量、分析与改进过程",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1268943,"施工企业质量管理的各项要求是通过（ ）实现的。",[372,374,376,378],{"key":20,"text":373,"correct":29},"质量管理体系",{"key":24,"text":375,"correct":22},"工程管理体系",{"key":27,"text":377,"correct":22},"质量员管理体系",{"key":31,"text":379,"correct":22},"质量控制体系",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":27,"analysis":33},1268944,"某工程竣工时，施工单位经过初验，认为已按合同约定的要求完成施工，提请作竣工验收，由于场地狭小，施工单位仍占用部分房屋作为办公用房，根据对竣工验收资料的要求，施工单位已将全部质量保证资料复印齐全供审核。经质量监督站初步抽验，观感、质量得分率为83％。质量保证资料未能通过，并提出了整改通知单。根据背景资料，回答以下问题： 下列说法正确的是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"建设单位应当在工程竣工验收15个工作日前将验收的时间、地点及验收组名单书面通知负责监督该工程的质量监督机构",{"key":24,"text":387,"correct":22},"监理单位组织工程竣工验收，对工程勘察、设计、施工、设备安装质量和各管理环节等方面做出全面评价，形成经验收组人员签署的工程竣工验收意见",{"key":27,"text":389,"correct":29},"参与工程竣工验收的建设、勘察、设计、施工、监理等各方不能形成一致意见时，应当协商提出解决方法，待意见一致后，重新组织工程竣工验收",{"key":31,"text":391,"correct":22},"设计单位组织工程竣工验收，应到实地查验工程质量",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1268945,"工程项目建设不像一般工业产品的生产那样，在固定的生产流水线，有规范化的生产工艺和完善的检测技术，有成套的生产设备和稳定的生产环境，因此工程质量具有（ ）、质量波动较大的特点。",[396,398,400,402],{"key":20,"text":397,"correct":29},"干扰因素多",{"key":24,"text":399,"correct":22},"检测技术不完善",{"key":27,"text":401,"correct":22},"不稳定的生产环境",{"key":31,"text":403,"correct":22},"管理水平参差不齐",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1268946,"工程建设中拟采用的新技术、新工艺、新材料，不符合现行强制性标准规定的，应当由拟采用单位提请（ ）组织专题技术论证，报批准标准的建设行政主管部门或者国务院有关主管部门审定。",[408,409,410,412],{"key":20,"text":63,"correct":22},{"key":24,"text":67,"correct":29},{"key":27,"text":411,"correct":22},"质监站",{"key":31,"text":198,"correct":22},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1268947,"建设工程在施工过程中，分项工程交接多、中间产品多、隐蔽工程多，因此质量存在（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"波动性",{"key":24,"text":420,"correct":29},"隐蔽性",{"key":27,"text":422,"correct":22},"局限性",{"key":31,"text":424,"correct":22},"不可预见性",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},1268948,"以下哪项不属于四大质量管理过程（ ）。",[429,430,431,432],{"key":20,"text":123,"correct":22},{"key":24,"text":127,"correct":22},{"key":27,"text":125,"correct":29},{"key":31,"text":129,"correct":22},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},1268949,"以下哪项属于安全员岗位职责（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":29},"参与施工现场环境监督管理",{"key":24,"text":440,"correct":22},"负责核查进厂材料、设备的质量保证资料，进场资料的抽样复验、见证取样、委托、送检和标识",{"key":27,"text":442,"correct":22},"负责施工控制网的测试",{"key":31,"text":444,"correct":22},"负责施工的各个阶段和各主要部位的放线、验线",{"id":446,"libraryId":5,"type":447,"typeLabel":448,"stem":449,"options":450,"answer":462,"analysis":33},1268951,2,"多选题","属于施工项目质量计划编制的方法的有（ ）。",[451,453,455,457,459],{"key":20,"text":452,"correct":29},"材料设备质量管理及措施",{"key":24,"text":454,"correct":29},"工程检测项目方法及控制措施",{"key":27,"text":456,"correct":22},"施工工艺过程的控制",{"key":31,"text":458,"correct":22},"安装和调试的过程控制",{"key":460,"text":461,"correct":22},"E","材料与机械设备的检测","AB",{"id":464,"libraryId":5,"type":447,"typeLabel":448,"stem":465,"options":466,"answer":475,"analysis":33},1268952,"要求（ ）等必须做可追溯性记录，质量计划要对其可追溯性范围、程序、标识、所需记录及如何控制和分发这些记录等内容做出规定。",[467,468,470,471,473],{"key":20,"text":165,"correct":29},{"key":24,"text":469,"correct":29},"分项分部工程质量验评",{"key":27,"text":349,"correct":22},{"key":31,"text":472,"correct":22},"临时工程",{"key":460,"text":474,"correct":29},"特殊要求的工程","ABE",{"id":477,"libraryId":5,"type":447,"typeLabel":448,"stem":478,"options":479,"answer":490,"analysis":33},1268953,"某市政工程施工企业中标某市一座互通立交桥。该工程的业主已委托某甲级监理单位进行工程监理。为保证工程施工质量，监理单位要求施工企业开工前编制好工程施工质量计划，做好质量预控工作。因此施工单位由项目质量负责人组织质量部门人员编制了施工质量计划，同时建立了质量责任制和考核评价办法，明确质量负责人对项目质量控制负过程质量控制由每道工序和岗位的责任人负责。请根据背景资料，回答下列问题。 下列选项中属于施工项目质量计划内容的有（ ）。",[480,482,484,486,488],{"key":20,"text":481,"correct":29},"质量总目标及其分解目标",{"key":24,"text":483,"correct":29},"质量管理组织机构和职责",{"key":27,"text":485,"correct":22},"施工进度计划",{"key":31,"text":487,"correct":29},"施工材料、设备等物质的质量管理及控制措施",{"key":460,"text":489,"correct":29},"施工质量控制点及其跟踪控制的方式与要求","ABDE",{"id":492,"libraryId":5,"type":447,"typeLabel":448,"stem":493,"options":494,"answer":505,"analysis":33},1268954,"对工程行业而言，质量计划主要是针对特定的工程项目编制的规定（ ）文件。",[495,497,499,501,503],{"key":20,"text":496,"correct":29},"专门的质量措施",{"key":24,"text":498,"correct":29},"资源",{"key":27,"text":500,"correct":22},"能力",{"key":31,"text":502,"correct":29},"活动顺序",{"key":460,"text":504,"correct":22},"工期","ABD",{"id":507,"libraryId":5,"type":447,"typeLabel":448,"stem":508,"options":509,"answer":520,"analysis":33},1268955,"属于施工项目质量计划编制的方法有（ ）。",[510,512,514,516,518],{"key":20,"text":511,"correct":29},"收集有关工程资料",{"key":24,"text":513,"correct":29},"确定项目质量目标",{"key":27,"text":515,"correct":29},"设置质量管理体系",{"key":31,"text":517,"correct":29},"制定项目质量控制程序",{"key":460,"text":519,"correct":22},"明确质量监管体系","ABCD",{"id":522,"libraryId":5,"type":447,"typeLabel":448,"stem":523,"options":524,"answer":535,"analysis":33},1268956,"对不合格品处置正确的有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":29},"对实施过程出现的不合格品，项目部质量员有权提出返工修补处理、降级处理或作不合格品处理意见和建议",{"key":24,"text":528,"correct":29},"质量监督检查部门应以图纸（更改）、技术资料、检测记录为依据用书面形式向以下各方发出通知",{"key":27,"text":530,"correct":29},"当分项分部项目工程不合格时通知项目质量副经理和生产副经理",{"key":31,"text":532,"correct":22},"当分项工程不合格时通知项目负责人和公司主管经理",{"key":460,"text":534,"correct":29},"当单位工程不合格时通知项目负责人和公司生产经理","ABCE",{"id":537,"libraryId":5,"type":447,"typeLabel":448,"stem":538,"options":539,"answer":549,"analysis":33},1268957,"以下属于质量计划的编制要求的有（ ）。",[540,541,543,545,547],{"key":20,"text":319,"correct":29},{"key":24,"text":542,"correct":29},"管理职责",{"key":27,"text":544,"correct":29},"资源提供",{"key":31,"text":546,"correct":22},"项目改进策划",{"key":460,"text":548,"correct":22},"管理计划","ABC",{"id":551,"libraryId":5,"type":447,"typeLabel":448,"stem":552,"options":553,"answer":564,"analysis":33},1268959,"工程竣工验收的组织包括（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":29},"检验批及分项工程验收",{"key":24,"text":557,"correct":29},"专项验收",{"key":27,"text":559,"correct":29},"分部工程验收",{"key":31,"text":561,"correct":29},"竣工预验收",{"key":460,"text":563,"correct":29},"竣工验收","ABCDE",{"id":566,"libraryId":5,"type":447,"typeLabel":448,"stem":567,"options":568,"answer":564,"analysis":33},1268960,"施工准备阶段质量控制主要包括（ ）。",[569,571,573,575,577],{"key":20,"text":570,"correct":29},"建立项目质量控制管理体系和质量保证体系，编制项目质量保证计划",{"key":24,"text":572,"correct":29},"制订施工现场的各种质量管理制度，完善项目计量及质量检测技术和手段",{"key":27,"text":574,"correct":29},"组织设计交底和图纸审核，是施工项目质量控制的重要环节",{"key":31,"text":576,"correct":29},"编制施工组织设计，将质量保证计划与施工工艺和施工组织进行融合，是施工项目质量控制的至关重要环节",{"key":460,"text":578,"correct":29},"对材料供应商和分包商进行评估和审核",{"id":580,"libraryId":5,"type":447,"typeLabel":448,"stem":581,"options":582,"answer":549,"analysis":33},1268961,"工程建设项目中的人员包括（ ）等直接参与市政工程建设的所有人员。",[583,585,587,588,590],{"key":20,"text":584,"correct":29},"决策管理人员",{"key":24,"text":586,"correct":29},"技术人员",{"key":27,"text":249,"correct":29},{"key":31,"text":589,"correct":22},"监理人员",{"key":460,"text":591,"correct":22},"督查人员",{"id":593,"libraryId":5,"type":447,"typeLabel":448,"stem":594,"options":595,"answer":564,"analysis":33},1268962,"影响工程质量的主要因素控制包括（ ）。",[596,598,600,602,604],{"key":20,"text":597,"correct":29},"人的因素影响",{"key":24,"text":599,"correct":29},"材料的控制",{"key":27,"text":601,"correct":29},"机械设备的控制",{"key":31,"text":603,"correct":29},"工艺方法的控制",{"key":460,"text":605,"correct":29},"环境因素的控制",{"id":607,"libraryId":5,"type":447,"typeLabel":448,"stem":608,"options":609,"answer":620,"analysis":33},1268963,"某城市道路工程进行招标。A单位中标后与发包方签订了施工合同准备施工。首先由项目经理部索取设计图纸和技术资料，依据设计文件和设计技术交底的工程控制点进行复测，并主持对图纸审核，形成会审记录。接着企业对施工方班组长以上的人员进行质量知识培训，并保存培训记录。 施工机械设备是指施工过程中使用的各类机械设备，包括（ ）以及施工安全设备等。",[610,612,614,616,618],{"key":20,"text":611,"correct":22},"施工器具",{"key":24,"text":613,"correct":29},"运输设备",{"key":27,"text":615,"correct":29},"测量仪器",{"key":31,"text":617,"correct":29},"计量器具",{"key":460,"text":619,"correct":22},"检测仪器","BCD",{"id":622,"libraryId":5,"type":447,"typeLabel":448,"stem":623,"options":624,"answer":564,"analysis":33},1268964,"技术交底的内容应根据具体工程有所不同，主要包括（ ）；其中质量标准要求是重要部分。",[625,627,629,631,633],{"key":20,"text":626,"correct":29},"施工图纸",{"key":24,"text":628,"correct":29},"施工组织设计",{"key":27,"text":630,"correct":29},"施工工艺",{"key":31,"text":632,"correct":29},"技术安全措施",{"key":460,"text":634,"correct":29},"规范要求、操作规范",[636,639,642,645,648,651],{"id":15,"name":637,"category":7,"favorite":638},"领导干部任职前廉政法规知识测试题",92,{"id":640,"name":641,"category":7,"favorite":15},595,"建筑结构与设备",{"id":643,"name":644,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":646,"name":647,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":649,"name":650,"category":7,"favorite":8},534,"BIM工程师",{"id":652,"name":650,"category":7,"favorite":8},535]