[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,5,50,726,[13,34,46,58,70,82,94,106,114,126,138,150,162,174,186,198,210,222,234,246,255,267,279,291,303,315,326,338,350,362,374,386,398,410,422,434,446,458,470,482,490,502,514,524,536,544,556,568,576,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1268863,1,"单选题","为预防桥头跳车，分层填筑砂砾（石），控制最佳含水量和铺筑层厚，最大填筑厚度不超过（ ）cm，确保压实度符合标准要求。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","10",false,{"key":24,"text":25,"correct":22},"B","15",{"key":27,"text":28,"correct":29},"C","20",true,{"key":31,"text":32,"correct":22},"D","25","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1268864,"顶进误差严重超标的原因分析不包括。（ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"不能坚持初期或后期进行中心和高程的校测，使顶进误差加大",{"key":24,"text":41,"correct":29},"工作坑内前视方向有误差没有及时发现，或坑内引人水准标高未经复测，存在误差，均能造成顶进偏差过大",{"key":27,"text":43,"correct":22},"在顶进前已知管位在地下水位之内，未采取降水措施，或在顶进中遇浅层滞水，土质变软，首节管下扎，加大负误差",{"key":31,"text":45,"correct":22},"顶管顶进误差校正方式不当，造成误差超标，采用补救方式又不及时",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1268865,"工程质量特别重大事故，是指造成30人以上死亡，或者100人以上重伤，或者（ ）元以上直接经济损失的事故。",[50,52,54,56],{"key":20,"text":51,"correct":22},"1000万",{"key":24,"text":53,"correct":22},"5000万",{"key":27,"text":55,"correct":29},"1亿",{"key":31,"text":57,"correct":22},"1.5亿",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1268866,"工程质量一般事故，是指造成（ ）人以下死亡，或者10人以下重伤，或者100万元以上1000万元以下直接经济损失的事故。",[62,64,66,68],{"key":20,"text":63,"correct":22},"1",{"key":24,"text":65,"correct":22},"2",{"key":27,"text":67,"correct":29},"3",{"key":31,"text":69,"correct":22},"4",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1268867,"后张法施工压浆不饱满的原因分析不包括（ ）",[74,76,78,80],{"key":20,"text":75,"correct":22},"压浆时锚具处预应力筋间隙漏浆",{"key":24,"text":77,"correct":22},"压浆时，孔道未清净，有残留物或积水",{"key":27,"text":79,"correct":22},"水泥浆泌水率偏大",{"key":31,"text":81,"correct":29},"压浆时大气温度较低",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1268868,"管道基础下沉的原因分析不包括。（ ）",[86,88,90,92],{"key":20,"text":87,"correct":22},"槽底土体松软、含水量高，土体不稳定",{"key":24,"text":89,"correct":29},"地下水位高",{"key":27,"text":91,"correct":22},"土基压实度不合格，基础施工所用的水泥混冱土强度不合格",{"key":31,"text":93,"correct":22},"基座厚度偏差过大",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1268869,"水泥混凝土桥面铺装层的裂纹和龟裂原因不包括（ ）",[98,100,102,104],{"key":20,"text":99,"correct":22},"砂石原材料质量不合格",{"key":24,"text":101,"correct":22},"水泥混凝土铺装层与梁板结构未能很好地连接成为整体，有“空鼓”现象",{"key":27,"text":103,"correct":29},"桥面铺装层内钢筋网上保护层偏小，钢筋网未能起到防裂作用",{"key":31,"text":105,"correct":22},"未按施工方案要求进行养护及封闭施工，桥面铺筑完成后养护不及时，在混凝土尚未达到设计强度时即开放交通，造成了铺装的早期破坏",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1268870,"孔内水位必须稳定地高出孔外水位（ ）m以上，泥浆泵等钻孔配套设备能量应有一定的安全系数，并有备用设备，以应急需。",[110,111,112,113],{"key":20,"text":63,"correct":29},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},1268871,"板式橡胶支座质量缺陷原因分析不包括。（ ）",[118,120,122,124],{"key":20,"text":119,"correct":29},"板式橡胶支座粘结于支座垫石的环氧砂浆强度不足，使支座偏位",{"key":24,"text":121,"correct":22},"梁底面有些翘曲，或梁底预埋钢板变位，造成梁安放后与设计要求值出人过大，造成支座受力不等",{"key":27,"text":123,"correct":22},"桥台、桥墩或盖梁顶面实际标高大于设计值时，为保持梁底标高，将支座处留成凹槽去凑合，形成梁底与墩、台顶面净空过小",{"key":31,"text":125,"correct":22},"墩、台顶面未按桥面横坡要求留有坡度，造成部分梁下的墩、台顶面标高超标",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},1268872,"钻孔灌注桩钢筋笼上浮的原因不包括（ ）",[130,132,134,136],{"key":20,"text":131,"correct":29},"混凝土灌注过程中导管埋置深度不深",{"key":24,"text":133,"correct":22},"混凝土初凝和终凝时间太短",{"key":27,"text":135,"correct":22},"清孔时孔内泥浆悬浮的砂粒太多",{"key":31,"text":137,"correct":22},"混凝土灌注至钢筋骨架底部时，灌注速度太快",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1268873,"陆上埋设护筒时，在护筒底部夯填（ ）cm厚黏土，必须夯打密实。放置护筒后，在护筒四周对称均衡地夯填黏土，防止护筒变形或位移，夯填密实不渗水。",[142,144,146,148],{"key":20,"text":143,"correct":22},"30",{"key":24,"text":145,"correct":22},"40",{"key":27,"text":147,"correct":29},"50",{"key":31,"text":149,"correct":22},"60",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},1268874,"沥青混凝土桥面铺装层的开裂和脱落原因不包括（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"设计标准偏低，厚度偏薄",{"key":24,"text":157,"correct":22},"沥青混凝土铺装层漏水，在沥青混凝土与水泥混凝土中间形成一层水膜，在车辆荷载的反复作用下，两层分离、产生龟裂、造成脱落",{"key":27,"text":159,"correct":22},"上下粘层油未渗人到混凝土面层中，未起到粘结作用",{"key":31,"text":161,"correct":29},"桥面铺筑完成后养护不到位",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},1268875,"管道错口的原因分析不包括。（ ）",[166,168,170,172],{"key":20,"text":167,"correct":29},"管壁厚度不一致，对接时造成管道错口",{"key":24,"text":169,"correct":22},"管壁椭圆度超标，致使管子内径偏差过大，正误差和负误差在对口处产生相对错口",{"key":27,"text":171,"correct":22},"稳管时垫石不牢固，浇筑管座混凝土时，振动挤压造成管节上浮或移动，出现",{"key":31,"text":173,"correct":22},"同井距内分段安管，由于测量放线错误，待两段合拢时，对不上口，出现错口事故",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},1268876,"伸缩缝安装及使用质量缺陷原因分析不包括。（ ）",[178,180,182,184],{"key":20,"text":179,"correct":22},"导水U形槽锚、粘不牢，造成导水槽脱落",{"key":24,"text":181,"correct":22},"齿形板伸缩缝的锚板，滑板伸缩缝的联结角钢，橡胶伸缩缝的衔接梁与主梁预埋件焊接前，高程未进行核查",{"key":27,"text":183,"correct":22},"伸缩缝的各部分焊接件表面未除锈，施焊时焊接缝长度和高度不够，造成焊接不牢；施焊未跳焊，造成焊件变形大",{"key":31,"text":185,"correct":29},"混凝土保护带强度不足",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},1268877,"金属管道焊接合理的坡口角度以（ ）为宜。",[190,192,194,196],{"key":20,"text":191,"correct":22},"15°",{"key":24,"text":193,"correct":22},"30°",{"key":27,"text":195,"correct":29},"45°",{"key":31,"text":197,"correct":22},"60°",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1268878,"水泥混凝土路面的板中横向缝裂预防处理方法不包括（ ）",[202,204,206,208],{"key":20,"text":203,"correct":22},"路面混凝土施工时不得在板块中部停止，如遇意外原因造成施工暂停，应在分块处按规范中的胀缝要求处理，并加传力杆",{"key":24,"text":205,"correct":22},"严格控制路面混凝土原材料及配合比，保证混凝土的一致性",{"key":27,"text":207,"correct":29},"严格控制基层施工质量，消除可能造成路面强度突变的因素",{"key":31,"text":209,"correct":22},"切缝一定要及时",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1268879,"为防止现浇混凝土结构裂缝的产生，混凝土拆模时，混凝土的表面温度与中心温度之间、表面温度与外界气温之间的温差应不超过（ ）",[214,216,218,220],{"key":20,"text":215,"correct":22},"10℃",{"key":24,"text":217,"correct":22},"15℃",{"key":27,"text":219,"correct":29},"20℃",{"key":31,"text":221,"correct":22},"25℃",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},1268880,"空心板梁预制过程中芯模上浮的预防措施不包括（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"若采用胶囊做内模，应用定位箍筋与主筋联系加以固定，并应对称平衡地进行浇筑",{"key":24,"text":229,"correct":29},"加设通长钢带，在顶部每隔2m采用一道压杠压住钢带，防止上浮",{"key":27,"text":231,"correct":22},"当采用空心内模时，应与主筋相连或压重（压杠），防止上浮",{"key":31,"text":233,"correct":22},"分两层浇筑，先浇筑底板混凝土",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},1268881,"钻孔灌注桩坍孔与缩径的预防措施不包括（ ）",[238,240,242,244],{"key":20,"text":239,"correct":22},"陆上埋设护筒时，在护筒底部夯填50cm厚黏土，必须夯打密实。放置护筒后，在护筒四周对称均衡地夯填黏土，防止护筒变形或位移，夯填密实不渗水",{"key":24,"text":241,"correct":22},"孔内水位必须稳定地高出孔外水位1m以上，泥浆泵等钻孔配套设备使用时应有一定的安全系数，并有备用设备，以备急需",{"key":27,"text":243,"correct":29},"在邻桩成桩24h后开钻",{"key":31,"text":245,"correct":22},"发生坍孔时，用优质黏土回填至坍孔处1m以上，待自然沉实后再继续钻进",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},1268882,"工程施工质量问题一般分（ ）类。",[250,251,252,253],{"key":20,"text":65,"correct":22},{"key":24,"text":67,"correct":29},{"key":27,"text":69,"correct":22},{"key":31,"text":254,"correct":22},"5",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":27,"analysis":33},1268883,"沥青路面非沉陷型早期裂缝原因分析不包含下列哪项。（ ）",[259,261,263,265],{"key":20,"text":260,"correct":22},"施工缝未处理好，接缝不紧密，结合不良",{"key":24,"text":262,"correct":22},"沥青未达到适合于本地区气候条件和使用要求的质量标准，致使沥青面层温度收缩或温度疲劳应力（应变）大于沥青混合料的抗拉强度（应变）",{"key":27,"text":264,"correct":29},"刚性基层收缩裂缝的反射缝",{"key":31,"text":266,"correct":22},"桥梁、涵洞或通道两侧的填土产生固结或地基沉降",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1268884,"工程事故造成50人重伤，属于下列哪个等级的事故。（ ）",[271,273,275,277],{"key":20,"text":272,"correct":22},"特别重大事故",{"key":24,"text":274,"correct":29},"重大事故",{"key":27,"text":276,"correct":22},"较大事故",{"key":31,"text":278,"correct":22},"一般事故",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1268885,"沟槽沉陷的原因分析不包括。（ ）",[283,285,287,289],{"key":20,"text":284,"correct":22},"沟槽沉陷的原因",{"key":24,"text":286,"correct":22},"沟槽中的积水、淤泥、有机杂物没有清除和认真处理",{"key":27,"text":288,"correct":22},"部分槽段，尤其是小管径或雨水口连接管沟槽，槽宽较窄、夯实不力、没有达到要求的密实度",{"key":31,"text":290,"correct":29},"在回填土中含有较大的干土块或黏土块较多，回填土的夯实质量达不到要求",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":24,"analysis":33},1268886,"水泥混凝土路面的龟背状裂缝原因不包括（ ）",[295,297,299,301],{"key":20,"text":296,"correct":22},"混凝土原材料不合格，砂石料含泥量超过标准或水泥过期",{"key":24,"text":298,"correct":29},"道路基层压实度不合格",{"key":27,"text":300,"correct":22},"混凝土振捣收浆不符合要求",{"key":31,"text":302,"correct":22},"混凝土养护未按规范规定进行",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1268887,"路面壅包、搓板原因分析不包括（ ）",[307,309,311,313],{"key":20,"text":308,"correct":29},"沥青混合料级配欠合理、骨料多、嵌挤能力低，高温稳定性差",{"key":24,"text":310,"correct":22},"面层和基层局部结合不好，在气温较高时，经行车作用，产生顺行车方向或向弯道外侧推挤",{"key":27,"text":312,"correct":22},"表面处治用层铺法施工，洒油不匀，沥青用量过大或拌合法施工时，摊铺时细料集中，局部油量偏大",{"key":31,"text":314,"correct":22},"基层水稳性不好、压实不足、强度不均匀，使路面发生变形产生波浪",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":27,"analysis":33},1268888,"在设计时应保证沥青混凝土铺装层的厚度满足使用要求，对于高等级路（桥）面，厚度应大于（ ）cm。",[319,321,323,325],{"key":20,"text":320,"correct":22},"7",{"key":24,"text":322,"correct":22},"8",{"key":27,"text":324,"correct":29},"9",{"key":31,"text":21,"correct":22},{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},1268889,"路面范围内的井室周围，不应采用（ ）等材料回填。",[330,332,334,336],{"key":20,"text":331,"correct":29},"黄土",{"key":24,"text":333,"correct":22},"石灰土",{"key":27,"text":335,"correct":22},"砂",{"key":31,"text":337,"correct":22},"砂砾",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},1268890,"施工人员可以在沟槽放样时给规定槽宽留出适当余量，一般两边再加放（ ）cm，以防止因上宽下窄造成底部基础宽度不够。",[342,344,346,348],{"key":20,"text":343,"correct":22},"1~5",{"key":24,"text":345,"correct":29},"5~10",{"key":27,"text":347,"correct":22},"10~15",{"key":31,"text":349,"correct":22},"15~20",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},1268891,"避免成孔期间过往大型车辆和设备，控制开钻孔距应跳隔1~2根桩基开钻或新孔应在邻桩成桩（ ）小时后开钻。",[354,356,358,360],{"key":20,"text":355,"correct":22},"12",{"key":24,"text":357,"correct":22},"24",{"key":27,"text":359,"correct":29},"36",{"key":31,"text":361,"correct":22},"48",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":33},1268892,"不属于土路床的压实宽度不到位的原因是。（ ）",[366,368,370,372],{"key":20,"text":367,"correct":22},"边线控制不准",{"key":24,"text":369,"correct":22},"线桩丢失",{"key":27,"text":371,"correct":22},"边线桩移位",{"key":31,"text":373,"correct":29},"中线桩移位",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1268893,"井圈、井盖安装不符合要求质量问题及现象不包括（ ）",[378,380,382,384],{"key":20,"text":379,"correct":29},"混凝土井圈往砖砌井墙上安装时不坐水泥砂浆，单摆浮搁或垫沥青混合料或支垫碎砖、碎石等",{"key":24,"text":381,"correct":22},"位于未铺装地面上的检查井安装井圈后，未在其周围浇筑水泥混凝土圈予以固定",{"key":27,"text":383,"correct":22},"型号用错，在有重载交通的路面上安装轻型井盖",{"key":31,"text":385,"correct":22},"误将污水井盖安装在雨水检查井上或反之，或排水管渠检查井上安装其他专业井盖",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1268894,"现浇混凝土结构裂缝按深度的不同，可分为（ ）裂缝。",[390,392,394,396],{"key":20,"text":391,"correct":22},"2种",{"key":24,"text":393,"correct":29},"3种",{"key":27,"text":395,"correct":22},"4种",{"key":31,"text":397,"correct":22},"5种",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":31,"analysis":33},1268895,"不属于路基横向裂缝的原因。（ ）",[402,404,406,408],{"key":20,"text":403,"correct":22},"路基填料直接使用了液限大于50、塑性指数大于26的土",{"key":24,"text":405,"correct":22},"同一填筑层路基填料混杂，塑性指数相差悬殊",{"key":27,"text":407,"correct":22},"路基顶填筑层作业段衔接施工工艺不符合规范要求",{"key":31,"text":409,"correct":29},"路基顶下层平整度填筑厚度相差悬殊，且最小压实厚度小于20cm",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},1268896,"不属于路基填筑过程中翻浆原因的是。（ ）",[414,416,418,420],{"key":20,"text":415,"correct":29},"近地表下1~3m处有杂填土层",{"key":24,"text":417,"correct":22},"坑塘、水池排水后的淤泥含水量大，填土无法排淤",{"key":27,"text":419,"correct":22},"近地表下1~3m处有淤泥层",{"key":31,"text":421,"correct":22},"所填土中黏性土和非黏性土混填，黏性土含水量大，碾压中黏性土呈泥饼状，形成局部翻浆",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},1268897,"不属于混凝土出现蜂窝问题的原因是（ ）",[426,428,430,432],{"key":20,"text":427,"correct":22},"混凝土配合比不当或砂、石子、水泥材料加水量计量不准，造成砂浆少、粗骨料多",{"key":24,"text":429,"correct":22},"混凝土搅拌时间不够、未拌合均匀、和易性差、振捣不密实",{"key":27,"text":431,"correct":22},"下料不当或下料过高，未设串筒使粗骨料集中，造成石子、砂浆离析",{"key":31,"text":433,"correct":29},"钢筋较密，使用的混凝土坍落度过大",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1268898,"检验（收）批的质量验收记录由施工项目专业质量检查员填写，（ ）组织项目专业质量检查员等进行验收，并签字确认。",[438,440,442,444],{"key":20,"text":439,"correct":22},"总监理工程师",{"key":24,"text":441,"correct":29},"专业监理工程师",{"key":27,"text":443,"correct":22},"总监代表",{"key":31,"text":445,"correct":22},"监理员",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1268899,"沥青混合料生产单位应按同类型、同配比、每批次向施工单位提供一份产品质量合格证书。连续生产时，每（ ）t提供一次。",[450,452,454,456],{"key":20,"text":451,"correct":22},"1000",{"key":24,"text":453,"correct":29},"2000",{"key":27,"text":455,"correct":22},"3000",{"key":31,"text":457,"correct":22},"5000",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1268900,"水池应按设计要求进行满水试验和（ ），并由试验（检测）单位出具试验（检测）报告。",[462,464,466,468],{"key":20,"text":463,"correct":22},"水压试验",{"key":24,"text":465,"correct":22},"闭水试验",{"key":27,"text":467,"correct":22},"闭气试验",{"key":31,"text":469,"correct":29},"气密性试验",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":27,"analysis":33},1268901,"分项工程验收记录由施工项目专业（ ）填写，专业监理工程师组织施工单位项目专业（ ）等进行验收，并签字确认。",[474,476,478,480],{"key":20,"text":475,"correct":22},"技术负责人\u002F技术负责人",{"key":24,"text":477,"correct":22},"技术负责人\u002F质量检查员",{"key":27,"text":479,"correct":29},"质量检查员\u002F技术负责人",{"key":31,"text":481,"correct":22},"质量检查员\u002F质量检查员",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},1268902,"单位工程档案总案卷数超过（ ）卷的，应编制总目录卷。",[486,487,488,489],{"key":20,"text":28,"correct":29},{"key":24,"text":143,"correct":22},{"key":27,"text":145,"correct":22},{"key":31,"text":147,"correct":22},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1268903,"工程竣工验收应该由（ ）组织进行。",[494,496,498,500],{"key":20,"text":495,"correct":29},"建设单位",{"key":24,"text":497,"correct":22},"监理单位",{"key":27,"text":499,"correct":22},"施工单位",{"key":31,"text":501,"correct":22},"质量监督单位",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},1268904,"分项工程的检查验收中各检验批的验收资料完整且（ ）验收合格，则该分项工程验收合格。",[506,508,510,512],{"key":20,"text":507,"correct":22},"70%",{"key":24,"text":509,"correct":22},"80％",{"key":27,"text":511,"correct":22},"90",{"key":31,"text":513,"correct":29},"100％",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1268905,"分部工程完成后，由（ ）组织施工单位项目负责人和有关勘察、设计单位项目负责人等进行验收。",[518,520,522,523],{"key":20,"text":519,"correct":22},"项目经理",{"key":24,"text":521,"correct":22},"项目总工",{"key":27,"text":439,"correct":29},{"key":31,"text":441,"correct":22},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1268906,"竣工图章的尺寸为（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":29},"50mmx80mm",{"key":24,"text":531,"correct":22},"40mmx80mm",{"key":27,"text":533,"correct":22},"50mmx100mm",{"key":31,"text":535,"correct":22},"40mmx100mm",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1268907,"检验（收）批的质量验收记录由施工项目专业（ ）填写，专业监理工程师组织项目专业（ ）等进行验收，并签字确认。",[540,541,542,543],{"key":20,"text":475,"correct":22},{"key":24,"text":477,"correct":22},{"key":27,"text":479,"correct":22},{"key":31,"text":481,"correct":29},{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":27,"analysis":33},1268908,"冬期施工混凝土，应有检验混凝土抗冻性能的（ ）养护试块（ ）强度报告。",[548,550,552,554],{"key":20,"text":549,"correct":22},"标准\u002F抗压",{"key":24,"text":551,"correct":22},"标准\u002F抗折",{"key":27,"text":553,"correct":29},"同条件\u002F抗压",{"key":31,"text":555,"correct":22},"同条件\u002F抗折",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1268909,"市政基础设施工程施工资料分类，应根据（ ）和专业项目进行划分。",[560,562,564,566],{"key":20,"text":561,"correct":29},"工程类别",{"key":24,"text":563,"correct":22},"工程性质",{"key":27,"text":565,"correct":22},"工程概况",{"key":31,"text":567,"correct":22},"工程造价",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":27,"analysis":33},1268910,"单位工程验收记录由施工单位填写，验收结论由监理（建设）单位填写。综合验收结论由参加验收各方共同商定，（ ）填写。",[572,573,574,575],{"key":20,"text":497,"correct":22},{"key":24,"text":499,"correct":22},{"key":27,"text":495,"correct":29},{"key":31,"text":501,"correct":22},{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1268911,"应有沥青拌合厂按同类型、同配比、每批次向施工单位提供的至少一份产品质量合格证。连续生产时，每（ ）t提供一次。",[580,581,582,583],{"key":20,"text":451,"correct":22},{"key":24,"text":453,"correct":29},{"key":27,"text":455,"correct":22},{"key":31,"text":457,"correct":22},{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":24,"analysis":33},1268912,"水泥在使用前需要复试的主要项目有：胶砂强度、凝结时间、（ ）、细度等。",[588,590,592,594],{"key":20,"text":589,"correct":22},"标准稠度用水量",{"key":24,"text":591,"correct":29},"安定性",{"key":27,"text":593,"correct":22},"比表面积",{"key":31,"text":595,"correct":22},"含硫量",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]