[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":565},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,2,50,726,[13,34,46,57,69,81,93,105,117,129,141,151,163,173,185,194,206,218,230,242,250,262,274,284,293,305,317,328,336,346,358,370,382,392,401,409,417,429,441,453,465,474,484,496,504,516,524,532,544,553],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1268712,1,"单选题","给水排水管道安装完毕后，应进行管道功能性试验。 污水、雨污水合流管道及湿陷土、膨胀土、流砂地区的雨水管道，必须经（ ）试验合格后方可投人运行。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","强度",false,{"key":24,"text":25,"correct":26},"B","严密性",true,{"key":28,"text":29,"correct":22},"C","弯沉",{"key":31,"text":32,"correct":22},"D","冲击","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1268713,"沥青混合料面层不得在雨、雪天气及环境最高温度低于（ ）℃时施工。",[38,40,42,44],{"key":20,"text":39,"correct":22},"-5",{"key":24,"text":41,"correct":22},"-",{"key":28,"text":43,"correct":22},"3",{"key":31,"text":45,"correct":26},"5",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1268714,"箍筋弯钩的弯曲直径应大于被箍主钢筋的直径，且HPB300钢筋不得小于钢筋直径的（ ）倍。",[50,52,54,55],{"key":20,"text":51,"correct":22},"2",{"key":24,"text":53,"correct":26},"2.5",{"key":28,"text":43,"correct":22},{"key":31,"text":56,"correct":22},"3.5",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":24,"analysis":33},1268715,"预应力筋张拉，实际伸长值与理论伸长值的差值应符合设计要求；设计未规定时，实际伸长值与理论伸长值之差应控制在（ ）以内。",[61,63,65,67],{"key":20,"text":62,"correct":22},"4%",{"key":24,"text":64,"correct":26},"6%",{"key":28,"text":66,"correct":22},"8%",{"key":31,"text":68,"correct":22},"10%",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1268716,"路基挖方时，在距离直埋缆线（ ）范围内必须采用人工开挖。",[73,75,77,79],{"key":20,"text":74,"correct":22},"1m",{"key":24,"text":76,"correct":26},"2m",{"key":28,"text":78,"correct":22},"3m",{"key":31,"text":80,"correct":22},"4m",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},1268717,"悬臂梁梁体表面无孔洞、露筋、蜂窝、麻面和宽度超过（ ）m的收缩裂缝。",[85,87,89,91],{"key":20,"text":86,"correct":22},"0.1",{"key":24,"text":88,"correct":26},"0.15",{"key":28,"text":90,"correct":22},"0.2",{"key":31,"text":92,"correct":22},"0.25",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1268718,"城市桥梁工程中，如钢筋标注3?20，则“20”表示（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"钢筋根数",{"key":24,"text":100,"correct":26},"钢筋直径",{"key":28,"text":102,"correct":22},"钢筋间距",{"key":31,"text":104,"correct":22},"钢筋等级",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1268719,"管道两侧和管顶以上（ ）mm范围内的回填材料，应由沟槽两侧对称运入槽内，不得直接回填在管道上；回填其他部位时，应均匀运入槽内，不得集中推入。",[109,111,113,115],{"key":20,"text":110,"correct":22},"300",{"key":24,"text":112,"correct":22},"400",{"key":28,"text":114,"correct":26},"500",{"key":31,"text":116,"correct":22},"600",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},1268720,"预应力筋存放在室外时不得直接堆放在地面上，必须垫高、覆盖、防腐蚀、防雨露，时间不宜超过（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"3个月",{"key":24,"text":124,"correct":26},"6个月",{"key":28,"text":126,"correct":22},"12个月",{"key":31,"text":128,"correct":22},"24个月",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1268721,"管道第二次冲洗应在第一次冲洗后，用有效氯离子含量不低于（ ）mg\u002FL的清洁水浸泡24h后，再用清洁水进行第二次冲洗直至水质检测、管理部门取样化验合格为止。",[133,135,137,139],{"key":20,"text":134,"correct":22},"10",{"key":24,"text":136,"correct":22},"15",{"key":28,"text":138,"correct":26},"20",{"key":31,"text":140,"correct":22},"25",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1268722,"挡土墙地基承载力应符合设计要求，每道挡土墙基槽抽检（ ）点，查触（钎）探检测报告、隐蔽验收记录。",[145,147,148,149],{"key":20,"text":146,"correct":22},"1",{"key":24,"text":43,"correct":26},{"key":28,"text":45,"correct":22},{"key":31,"text":150,"correct":22},"7",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},1268723,"给水排水管道安装完毕后，应进行管道功能性试验。 无压管道应进行严密性试验，包括（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"强度试验",{"key":24,"text":158,"correct":22},"压力试验",{"key":28,"text":160,"correct":22},"闭水试验和压力试验",{"key":31,"text":162,"correct":26},"闭水试验和闭气试验",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},1268724,"当在使用中对水泥质量有怀疑或出厂日期逾（ ）时，应进行复检，并按复验结果使用。",[167,169,171,172],{"key":20,"text":168,"correct":22},"1个月",{"key":24,"text":170,"correct":22},"2个月",{"key":28,"text":122,"correct":26},{"key":31,"text":124,"correct":22},{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},1268725,"柔性管道管基有效支承角范围应采用（ ）填充密实，并与管壁紧密接触。",[177,179,181,183],{"key":20,"text":178,"correct":22},"素土",{"key":24,"text":180,"correct":22},"碎石",{"key":28,"text":182,"correct":22},"混凝土",{"key":31,"text":184,"correct":26},"中粗砂",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":28,"analysis":33},1268726,"管网总平面布置图标注建（构）筑物角坐标，通常标注其（ ）个角坐标。",[189,190,191,192],{"key":20,"text":146,"correct":22},{"key":24,"text":51,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":193,"correct":22},"4",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":28,"analysis":33},1268727,"装配式梁（板）质量控制，构件吊点的位置应符合设计要求，设计无要求时，应经计算确定。构件的吊环应竖直。吊绳与起吊构件的交角小于（ ）时应设置吊梁。",[198,200,202,204],{"key":20,"text":199,"correct":22},"30°",{"key":24,"text":201,"correct":22},"45°",{"key":28,"text":203,"correct":26},"60°",{"key":31,"text":205,"correct":22},"75°",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},1268728,"行车路线往往在某些点位置处汇集、专业上称该点为（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":26},"合流点",{"key":24,"text":213,"correct":22},"冲突点",{"key":28,"text":215,"correct":22},"分流点",{"key":31,"text":217,"correct":22},"汇集点",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":28,"analysis":33},1268729,"石灰稳定土类质量控制要点中，压实度抽检，城市快速路、主干路底基层大于或等于（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"90%",{"key":24,"text":225,"correct":22},"93%",{"key":28,"text":227,"correct":26},"0.95",{"key":31,"text":229,"correct":22},"0.98",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},1268730,"普通沥青混合料（70#石油沥青）摊铺温度为（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":22},"120℃~130℃",{"key":24,"text":237,"correct":26},"135℃~150℃",{"key":28,"text":239,"correct":22},"140℃~150℃",{"key":31,"text":241,"correct":22},"145℃~155℃",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1268731,"钢筋、砂浆、拉环、筋带的质量均应按设计要求控制。砌体挡土墙采用的砌筑和石料，强度应符合设计要求，按每品种、每检验（收）批（ ）组查试验报告。",[246,247,248,249],{"key":20,"text":146,"correct":26},{"key":24,"text":43,"correct":22},{"key":28,"text":45,"correct":22},{"key":31,"text":150,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1268732,"采用冷拉方法调直钢筋时，HPB300级钢筋的冷拉率不宜大于（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"1%",{"key":24,"text":257,"correct":26},"2%",{"key":28,"text":259,"correct":22},"0.03",{"key":31,"text":261,"correct":22},"0.05",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1268733,"生浅埋暗挖初期衬砌混凝土的强度应符合设计要求，按设计要求设置变形缝，且变形缝间距不宜大于（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"10m",{"key":24,"text":269,"correct":22},"15m",{"key":28,"text":271,"correct":22},"20m",{"key":31,"text":273,"correct":26},"25m",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1268734,"施工中应根据膨胀土自由膨胀率，选用适宜的碾压机具，碾压时应保持最佳含水量；压实土层松铺厚度不得大于（ ）cm。",[278,279,280,282],{"key":20,"text":134,"correct":22},{"key":24,"text":138,"correct":22},{"key":28,"text":281,"correct":26},"30",{"key":31,"text":283,"correct":22},"40",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1268735,"圆井采用砌筑逐层砌筑收口，偏心收口时每层收进不应大于（ ）mm。",[288,289,290,291],{"key":20,"text":138,"correct":22},{"key":24,"text":281,"correct":22},{"key":28,"text":283,"correct":22},{"key":31,"text":292,"correct":26},"50",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},1268736,"路基压实应在土壤含水量接近最佳含水量值时进行，最佳含水量是通过（ ）获得。",[297,299,301,303],{"key":20,"text":298,"correct":22},"设计",{"key":24,"text":300,"correct":22},"经验",{"key":28,"text":302,"correct":26},"实验",{"key":31,"text":304,"correct":22},"计算",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},1268737,"装配式梁板构件吊装时混凝土强度不得低于设计要求，设计未要求时，不得低于构件强度的（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"60％",{"key":24,"text":312,"correct":22},"70%",{"key":28,"text":314,"correct":26},"75％",{"key":31,"text":316,"correct":22},"90％",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},1268738,"构件吊运时混凝土的强度不得低于设计强度的（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":26},"75%",{"key":24,"text":324,"correct":22},"80%",{"key":28,"text":326,"correct":22},"0.9",{"key":31,"text":146,"correct":22},{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},1268739,"HRB335级、HRB400级钢筋的冷拉率不宜大于（ ）。",[332,333,334,335],{"key":20,"text":255,"correct":26},{"key":24,"text":257,"correct":22},{"key":28,"text":259,"correct":22},{"key":31,"text":261,"correct":22},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":20,"analysis":33},1268740,"沟槽回填管道应符合以下规定：压力管道水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于（ ）m。",[340,342,343,345],{"key":20,"text":341,"correct":26},"0.5",{"key":24,"text":146,"correct":22},{"key":28,"text":344,"correct":22},"1.5",{"key":31,"text":51,"correct":22},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},1268741,"跨水域桥梁的调整构筑物应结合（ ）仔细识读。",[350,352,354,356],{"key":20,"text":351,"correct":22},"平面、立面图",{"key":24,"text":353,"correct":22},"平面、布置图",{"key":28,"text":355,"correct":22},"平面、剖面图",{"key":31,"text":357,"correct":26},"平面、桥位图",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1268742,"闭气试验时，地下水位应低于管外底（ ）mm，环境温度为-15~50℃，下雨时不得进行闭气试验。",[362,364,366,368],{"key":20,"text":363,"correct":22},"100",{"key":24,"text":365,"correct":22},"120",{"key":28,"text":367,"correct":26},"150",{"key":31,"text":369,"correct":22},"180",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1268743,"箱梁支架预压的目的不包括（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"检验支架的强度及稳定性",{"key":24,"text":377,"correct":26},"消除地基的弹性变形",{"key":28,"text":379,"correct":22},"测量出支架的弹性变形",{"key":31,"text":381,"correct":22},"为调整支架标高提供依据",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1268744,"钢筋筋调直，可用机械或人工调直。经调直后的钢筋不得有局部弯曲、死弯、小波浪形，其表面伤痕不应使钢筋截面减小（ ）。",[386,388,390,391],{"key":20,"text":387,"correct":22},"3%",{"key":24,"text":389,"correct":26},"5%",{"key":28,"text":86,"correct":22},{"key":31,"text":88,"correct":22},{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},1268745,"弯钩平直部分的长度，有抗震要求的结构不得小于箍筋直径的（ ）倍。",[396,397,398,400],{"key":20,"text":193,"correct":22},{"key":24,"text":45,"correct":22},{"key":28,"text":399,"correct":22},"8",{"key":31,"text":134,"correct":26},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1268746,"路基压实度的控制，压实应先轻后重、先慢后快、均匀一致，压路机最快速度不宜超过（ ）km\u002Fh。",[405,406,407,408],{"key":20,"text":146,"correct":22},{"key":24,"text":51,"correct":22},{"key":28,"text":43,"correct":22},{"key":31,"text":193,"correct":26},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1268747,"在施工范围内一般应选用渗水性土或砂砾填筑：台背顺路线方向，上部距翼墙尾端不少于台高加（ ）m。",[413,414,415,416],{"key":20,"text":146,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":43,"correct":22},{"key":31,"text":193,"correct":22},{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":31,"analysis":33},1268748,"市政管道纵断面布局一般分为上下两部分，上方为（ ），下方为（ ）",[421,423,425,427],{"key":20,"text":422,"correct":22},"纵断图,结构图",{"key":24,"text":424,"correct":22},"纵断图,平面图",{"key":28,"text":426,"correct":22},"结构图,列表",{"key":31,"text":428,"correct":26},"纵断图,列表",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1268749,"验槽后原状土地基局部超挖或扰动时应按规范的有关规定进行处理；岩石地基局部超挖时，应将基底碎渣全部清理，回填低强度等级混凝土或粒径（ ）mm的砂石回填夯实。",[433,435,437,439],{"key":20,"text":434,"correct":22},"5~10",{"key":24,"text":436,"correct":26},"10~15",{"key":28,"text":438,"correct":22},"15~20",{"key":31,"text":440,"correct":22},"20~25",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":33},1268750,"水泥稳定土类质量控制要点中，水泥稳定土类材料7d抗压强度，城市快速路、主干路底基层为（ ）MPa。",[445,447,449,451],{"key":20,"text":446,"correct":22},"1~2",{"key":24,"text":448,"correct":22},"2~3",{"key":28,"text":450,"correct":26},"3~4",{"key":31,"text":452,"correct":22},"4~5",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1268751,"水泥稳定土的初期强度（ ），其强度随期龄增长。",[457,459,461,463],{"key":20,"text":458,"correct":26},"高",{"key":24,"text":460,"correct":22},"低",{"key":28,"text":462,"correct":22},"增长明显",{"key":31,"text":464,"correct":22},"增加平缓",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1268752,"根据GB50204-2002（2011年版）要求，进场钢筋必须进行钢筋重量偏差检测。测量钢筋重量偏差时，试样应从不同钢筋上截取，数量不少于（ ）根。",[469,470,471,472],{"key":20,"text":43,"correct":22},{"key":24,"text":45,"correct":26},{"key":28,"text":150,"correct":22},{"key":31,"text":473,"correct":22},"9",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},1268753,"二灰稳定土早期强度（ ），随龄期增长，并与养护温度密切相关。",[478,480,482,483],{"key":20,"text":479,"correct":26},"较低",{"key":24,"text":481,"correct":22},"较高",{"key":28,"text":460,"correct":22},{"key":31,"text":458,"correct":22},{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1268754,"拌制混凝土应优先采用（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":26},"硅酸盐水泥",{"key":24,"text":491,"correct":22},"矿渣硅酸盐水泥",{"key":28,"text":493,"correct":22},"火山灰质硅酸盐水泥",{"key":31,"text":495,"correct":22},"粉煤灰硅酸盐水泥",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},1268755,"混凝土路缘石外观质量合格品缺棱掉角影响顶面或侧面的破坏最大投影尺寸应小于等于（ ）mm。",[500,501,502,503],{"key":20,"text":134,"correct":22},{"key":24,"text":138,"correct":22},{"key":28,"text":281,"correct":26},{"key":31,"text":283,"correct":22},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},1268756,"混凝土井壁模块的空心率应不小于（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":26},"40％",{"key":24,"text":511,"correct":22},"45％",{"key":28,"text":513,"correct":22},"50％",{"key":31,"text":515,"correct":22},"55％",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1268757,"混凝土路缘石外观质量优等品可视面粘皮（蜕皮）及表面缺损面积应小于等于（ ）mm。",[520,521,522,523],{"key":20,"text":134,"correct":22},{"key":24,"text":138,"correct":26},{"key":28,"text":281,"correct":22},{"key":31,"text":283,"correct":22},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":28,"analysis":33},1268758,"锚具、夹具和连接器的硬度检（试）验要求每个零件测试点为（ ）点，当硬度值符合设计要求分范围应判为合格。",[528,529,530,531],{"key":20,"text":146,"correct":22},{"key":24,"text":51,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":22},{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},1268759,"钢材应用广泛、品种繁多，对于市政工程用钢材多的主要是（ ）和预应力钢筋混凝土所用钢材。",[536,538,540,542],{"key":20,"text":537,"correct":26},"钢筋混凝土",{"key":24,"text":539,"correct":22},"金属品",{"key":28,"text":541,"correct":22},"板材",{"key":31,"text":543,"correct":22},"型材",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},1268760,"混凝土的最大水泥用量（包括矿物掺合料）不宜超过500kg\u002Fm3；配制大体积混凝土时水泥用量不宜超过（ ）kg\u002Fm3。",[548,549,550,552],{"key":20,"text":110,"correct":22},{"key":24,"text":363,"correct":22},{"key":28,"text":551,"correct":26},"350",{"key":31,"text":367,"correct":22},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},1268761,"热拌沥青混合料正常施工温度（到达工地温度）为（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"100℃~110℃",{"key":24,"text":560,"correct":26},"140℃~155℃",{"key":28,"text":562,"correct":22},"150℃~160℃",{"key":31,"text":564,"correct":22},"165℃~175℃",[566,569,572,575,578,581],{"id":15,"name":567,"category":7,"favorite":568},"领导干部任职前廉政法规知识测试题",92,{"id":570,"name":571,"category":7,"favorite":15},595,"建筑结构与设备",{"id":573,"name":574,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":576,"name":577,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":579,"name":580,"category":7,"favorite":8},534,"BIM工程师",{"id":582,"name":580,"category":7,"favorite":8},535]