[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,13,50,726,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1269265,3,"判断题","当参加验收各方对工程质量验收意见不一致时，应重新验收。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1269266,"隐蔽工程的验收应由施工单位准备好自检记录，在隐蔽验收日提前48h通知相关单位验收；未经隐蔽工程验收合格，不得进行下道工序的施工。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1269267,"当设计规定进行道路弯沉试验、荷载试验时，验收必须在试验完成后进行。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1269268,"检验批的合格质量主要取决于对主控项目的检验结果。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1269269,"许有一定偏差的项目，而放在一般项目中，用数据规定的标准，可以有允许偏差范围，并有不到20％的检查点可以超过允许偏差值，但也不能超过允许值的150％。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1269270,"外观质量对结构的使用要求、使用功能、美观等都有较大影响，必须通过抽样检查来确定能否合格，是否达到合格的工程内容。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1269271,"分项工程验收由专业监理工程师组织施工项目专业技术负责人等进行。分项工程验收是在检验批验收合格的基础上进行，通常起一个归纳整理的作用，是一个统计表，没有实质性验收内容。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1269272,"工程竣工验收合格后，建设单位应按规定将工程竣工验收报告和有关文件，报政府行政主管部门备案。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1269273,"检验批又称验收批，前者指施工单位自检，后者指监理人员参加的验收是施工质量控制和专业验收基础项目，通常需要按施工段、结构层变形缝、根件等进行划分。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1269274,"分部工程应按主要工种、材料、施工工艺、设备类别等进行划分。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1269275,"建设单位招标文件确定的每一个独立合同应为一个单位工程。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1269276,"检查项目中某一子项甚至某一抽查样本的检查结果若为不合格时，即行使对检查批质量的否决权。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1269277,"隐蔽工程是指那些在施工过程中上一道工序的工作结束，被下一道工序所掩盖，而无法进行复查的部位。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1269278,"分项工程验收由总监理工程师组织施工项目专业技术负责人等进行。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1269279,"工序是工程验收的最小单位，是分项工程乃至整个建筑工程质量验收的基础。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1269280,"主控项目是涉及结构安全、节能、环境保护和主要使用功能起决定作用的检验项目。它们应全部满足标准规定的要求，质量经抽样检（试）验全部合格。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1269281,"规模较大的单位工程，可将其能形成独立使用功能的部分为一个子单位工程。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1269282,"在浇筑水泥混凝土基础过程中突遇强降水，地面水大量冲入沟槽，使水泥浆流失，水泥混凝土结构损坏。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1269283,"埋地钢管环氧煤油沥青防腐绝缘层总厚度不够，涂层不均匀，有褶皱、鼓包等质量缺陷，影响整个管道系统的使用寿命。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1269284,"浇筑桥面混凝土之前必须严格按设计重新布设钢筋网，以保证钢筋网上下保护层。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1269285,"混凝土出现蜂窝，原因是下料不当或下料过高，未设串筒使粗骨料集中，造成石子、砂浆离析。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1269286,"一般缺陷是指对结构构件的受力性能或安装使用性能无决定性影响的缺陷。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1269287,"管道回填土应符合设计要求，且不得有石块、杂物、硬物等，以便避免伤及管道；严禁带水回填作业，管道周围应同中砂或砂性土回填。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1269288,"为使桥面铺装混凝土与行车道板紧密结合成整体，在进行梁板顶面拉毛或机械凿毛，以保证梁板与桥面铺装的结合。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1269289,"无损探伤检验取样数量与质量要求应按设计要求执行；设计无要求时，压力管道的取样数量应不小于焊缝量的10％。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1269290,"水泥稳定土类基层应选用初凝时间大于3h、终凝时间不小于6h的32.5级、42.5级普通硅酸盐水泥、矿渣硅酸盐水泥、火山灰硅酸盐水泥。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1269291,"桥头跳车的主要原因为桥头搭板搭板的一端搭在桥台牛腿上，基本无沉降，而另一端则置于路堤上，随路堤的沉降而下沉，使之在搭板的前后端形成较大的沉降坡差，当沉降到达一定数量时，就会引起跳车。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1269292,"碾压设备选择不当，超厚回填，填土土质不符合要求，带水回填回填冻块土和在冻槽上回填，不按段落分层夯实，会造成回填土不密实。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1269293,"避免路基“弹簧”现象，避免用天然稠度小于1.1、液限大于40、塑性指数大于18、含水量大于最佳含水量两个百分点的土作为路基填料。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1269294,"二灰基层洒水养生时，应使喷出的水成雾状，不得将水直接喷射或冲击二灰碎石基层表面，将表面冲成松散状。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1269295,"一旦发生管道基础高程错，如误差在验收规范允许偏差范围内，则一般作微小的调整；超过允许偏差范围只有拆除基础返工重做。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1269296,"检查井井框与路面高差值过大（标准为5mm）形成行驶冲击荷载，致使路基下沉造成检查井周边下沉、破损。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1269297,"钻孔灌注桩灌注水下混凝土时，灌注的桩顶标高应与设计标高相同。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1269298,"倒虹管必须做闭水试验。闭水试验应在管道灌满水经24h后进行。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1269299,"双层式沥青混合料面层是上下铺筑，宜在当天内完成。如间隔时间较长，下层受到污染，铺筑上层前应对下层进行清扫，并应浇洒适量粘层沥青。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1269300,"塌孔与缩径产生的原因基本相同，主要是地层复杂、钻进速度过快、护壁泥浆性能差、成孔后放置时间过长没有灌注混凝土等原因所造成。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1269301,"路面碾压过程中出现的横裂纹，往往是某区域的多道平行微裂纹，裂纹长度较短。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1269302,"顶管顶进工作井进人土层，每顶进300mm，测量不应少于一次；正常顶进时，每顶进1000mm，测量不应少于一次。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1269303,"当管道基础铺设后发现基础高度不符合设计要求，特别是重力流管道发生倒坡时，必须返工重做。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1269304,"填料宜采用非透水性土。处于常水位以下部分的填土，不得使用非透水性土壤。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1269305,"水泥混凝土面层应板面平整、密实，边角应整齐、无裂缝，并不得有石子外露和浮浆、脱皮、踏痕、积水等现象，蜂窝麻面面积不得大于总面积的0.5％。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1269306,"钻孔灌注桩施工中护筒的内径宜比桩径大100~150m“护筒一般埋置深度为2.0~4.0m。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1269307,"混凝土出现蜂窝，原因是钢筋较密，使用的粗骨料粒径过大或坍落度过小。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1269308,"混凝土质量评价依据标准有《普通混凝土力学性能试验方法标准》GB\u002FT50081-2002。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1269309,"避免路基“弹簧”现象，对产生“弹簧”部位，可将其过湿土翻晒、拌合均匀后重新碾压；或挖除换填含水量适宜的良性土壤后重新碾压。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1269310,"平基、管座的混凝土设计无要求时，宜采用强度等级不低于C20的低坍落度混凝土。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1269311,"混凝土出现蜂窝，原因是模板缝隙未堵严，水泥浆流失。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1269312,"避免路基“弹簧”现象，应清楚碾压层下软弱层，换填良性土壤后重新碾压。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1269313,"管道闭水试验试验段上游设计水头超过管顶内壁时，试验水头应以试验段上游设计水头加2m计。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1269314,"工程质量事故造成5000万元直接经济损失的是较大事故。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]