[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,10,50,726,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1269115,3,"判断题","技术交底是施工技术管理的重要环节，通常分为检验批、分项、分部工程，按照企业管理规定在正式施工前分别进行。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1269116,"技术交底是施工技术管理的重要环节，通常分为分项、分部和单位工程，按照企业管理规定在正式施工前分别进行。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1269117,"监理单位应根据《建设工程监理规范》的要求对工程进行竣工预验收。符合规定后由监理单位向建设单位提交工程竣工报告和完整的质量控制资料，申请建设单位组织竣工验收。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1269118,"质量预控是指施工技术人员和质量管理人员事先对分项分部工程进行分析，找出在施工过程中可能或容易出现的质量环节，制订相应的对策，采取质量预控措施予以预防。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1269119,"施工阶段质量控制是整个工程质量控制的重点。根据工程项目质量目标要求，加强对施工现场及施工工艺的监督管理，重点控制工序质量，督促施工人员严格按设计施工图纸、施工工艺、国家有关质量标准和操作规程进行施工和管理。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1269120,"对于重要工程或关键施工部位所用的材料，原则上必须进行全部检（试）验，材料质量抽样和检（试）验的方法要符合有关材料质量标准和测试规程，能反应检验（收）批次材料的质量与性能。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1269121,"施工准备阶段的控制是指工程正式开始前所进行的质量策划，这项工作是工程施工质量控制的基础和先导。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1269122,"施工阶段质量控制是指规程正式开始前所进行的质量策划。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1269123,"桥管安装前的地基、基础、下部结构工程经验收合格，墩台顶面高程、中线及孔跨径满足设计和管道安装要求。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1269124,"模板支架的制作与安装，对混凝土、钢筋混凝土结构与构件的外观质量、几何尺寸的准确以及结构的强度和刚度等将起到重要的作用。模板、支架的施工质量是工程质量控制的重要环节，必须引起高度重视。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1269125,"管道支架底座的支承结构、预埋件等的加工、安装应符合设计要求，且连接牢固。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1269126,"支撑形式有横撑、竖撑和板桩撑，横撑和竖撑由撑板、主柱和撑扛组成。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1269127,"模板制作质量应符合现行国家标准。支架、拱架安装完毕，经检（试）验合格后方可安装模板，浇筑混凝土和砌筑前，应对模板、支架和拱架进行检查和验收，合格后方可施工。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1269128,"内外井壁应采用水泥砂浆勾缝。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1269129,"铺砌式面层施工控制要点中，砂浆平均抗压强度等级应符合设计要求，任一组试件抗压强度最低值不得低于设计强度的80%。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1269130,"下部结构是桥梁位于支座以下的部分，由桥墩、桥台以及它们的基础组成。下部结构作用是支承上部结构，并将结构重力传递给地基。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1269131,"砌筑时应同时安装踏步，踏步安装后再砌筑砂浆未达到规定抗压强度前不得踩踏。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1269132,"钢筋安装位置与预应力管道或锚件位置发生冲突时，可适当调整预应力管道的位置，确保钢筋安装位置准确。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1269133,"沉管施工沉放前、后管道无变形、受损；沉放及接口连接后管道无滴漏、线漏和明显渗水现象。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1269134,"砌筑时，铺浆应饱满，灰浆与砌筑四周粘结紧密、不得漏浆，上下砌筑应错缝砌筑。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1269135,"桥管管节吊装的吊点位置应符合设计要求，采用分段悬臂拼装的，每管段轴线安装的挠度曲线变化应符合设计要求。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1269136,"雨水口的槽底应夯实并及时浇筑混凝土基础，雨水口位置对，深度符合设计要求，安装不得扭歪，井框、井篦安装平稳、牢固，支、连管应顺直，无倒坡、错口及破损现象。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1269137,"道路路基是路面结构的基础，路基工程的质量是道路基层、面层平整稳定的关键，坚固稳定的路基是路面荷载承受和安全行车的保障。在路基施工中，只有加强施工质量控制，严格执行技术标准，才能提高路基的稳定性，保证道路的耐久性。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1269138,"混凝土灌注前，应对设立模板的外形尺寸、中线、标高、各种预埋件等进行隐蔽工程检查，并填写记录；检查合格后，方可进行灌注。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1269139,"预应力筋锚固后的外露长度不宜小于30mm。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1269140,"夯管时，应将第一节管夯入接受工作井不少于300mm，并检查露出部分管节的外防腐层及管口损伤情况。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1269141,"钢筋接头应按设计要求或规范规定选用焊接接头或机械连接接头。焊接接头应优先选择闪光对焊；机械连接接头适用于HRB335和HRB400光圆钢筋的连接。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1269142,"沉管施工，接口连接形式符合设计文件要求；柔性接口无渗水现象；混凝土刚性接口密实、无裂缝，无滴漏、线漏和明显渗水现象。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1269143,"钢筋下料是结构施工的主要隐蔽项目，钢筋使用前除应检查其外观质量外，还必须按材料质量的控制要求进行检（试）验及试验。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1269144,"当钢管或球墨铸铁管道变形率超过2%，但不超过3%时；化学建材管道变形率超过3%，但不超过5%时；应采取选用适合回填材料按规定重新回填施工，直至设计高程。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1269145,"挖方路基施工，边坡修整与边坡的稳定是影响施工质量的主要工序之一。当通过高的边坡或挖方路段水文地质情况不良时，应及时采取必要的应急措施或设置必要的防护工程。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1269146,"柔性管道胸腔两侧沟槽回填，应分层回填密实，压实后每层厚度为100~200mm。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1269147,"水泥进场时，应附有出厂检（试）验报告和产品合格证明文件。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1269148,"钻孔灌注桩施工时，不得用加深钻孔深度的方式代替清孔。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1269149,"支架和拱架，应按施工方案循环卸落，卸落量宜由小渐大。每一循环中，在横向应同时卸落，在纵向应对称均衡卸落。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1269150,"沥青混凝土桥面铺装完成后，面层表面应坚实、平整，无裂纹、松散、油包、麻面。桥面铺装层与桥头路接槎应紧密、平顺。检查应全数检查，采用观察的方法。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1269151,"各种沥青重量均应符合设计及规范要求，粗集料应控制好级配范围，细集料应洁净、干燥、无风化、无杂质。沥青混合料品质应符合保罗米试验配合比技术要求。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1269152,"污水、雨污水合流管道及湿陷土、膨胀土、流砂地区的雨水管道，必须经严密性试验合格后方可投入运行。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1269153,"泵送混凝土应符合下列规定：坍落度为60~200mm；碎石级配，骨料最大粒径25mm。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1269154,"基层是路面结构中的主要承重层，主要承受由面层传来的车辆荷载垂直力，应具有足够的强度、刚度、水稳定性和平整度。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1269155,"管道纵断面图中，水平方向表示管线长度、垂直方向表示高程。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1269156,"砌筑结构的井室砌筑应垂直砌筑，需收口砌筑时，应按设计要求的位置设置钢筋混凝土梁进行收口。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1269157,"钢筋调直，只能用机械调直。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1269158,"盾构施工的给水排水管道设有现浇钢筋混凝土二次衬砌的，衬砌的断面形式、结构形式和厚度，以及衬砌的变形缝位置和构造符合设计要求；全断面钢筋混凝土二次衬砌的，衬砌应一次浇筑成型，浇筑时应左右对称、高度基本一致，混凝土达到规定强度方可拆模。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1269159,"预应力筋拉完毕，实际位置与设计位置的偏差不得大于10mm，且不得大于构件截面最短边长的4%。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1269160,"预应力筋在存放、搬运、施工操作过程中应避免机械损伤和有害的锈蚀。如长时间存放，必须安排定期的外观检查。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1269161,"钢筋的形状、尺寸应按照设计要求进行加工。加工后的钢筋，其表面不应有削弱钢筋截面的伤痕。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1269162,"压力管道水压试验进行实际渗水量测定时，宜采用注水法。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1269163,"压力管道水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于Im。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1269164,"现浇混凝土盖梁拆除模板后检查盖梁表面无孔洞、露筋、蜂窝、麻面；检查盖梁的裂缝，不得超过设计规定的受力裂缝，检查应全数检查。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]