[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-856-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":576},{"id":5,"name":6,"category":7,"favorite":8},856,"(市政质量)专业管理实务 岗位知识","建筑工程",0,1,50,726,[13,33,45,57,69,81,93,103,112,124,136,144,156,168,178,190,202,210,222,230,238,246,258,270,278,290,300,312,324,336,348,360,372,380,392,404,413,425,433,445,457,469,481,493,505,517,529,541,553,564],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1268662,"单选题","开展项目质量策划，一般可以分（ ）个步骤进行。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","2",true,{"key":23,"text":24,"correct":25},"B","3",false,{"key":27,"text":28,"correct":25},"C","4",{"key":30,"text":31,"correct":25},"D","5","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},1268663,"工程检测项目方法及控制措施中,如钢材进场必须进行型号、（ ）、炉号、批量等内容的检验。",[37,39,41,43],{"key":19,"text":38,"correct":21},"钢种",{"key":23,"text":40,"correct":25},"尺寸",{"key":27,"text":42,"correct":25},"类型",{"key":30,"text":44,"correct":25},"规格",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":30,"analysis":32},1268664,"以下不属于质量计划的编制要求有（ ）。",[49,51,53,55],{"key":19,"text":50,"correct":25},"材料、设备、机械、劳务及实验等采购控制",{"key":23,"text":52,"correct":25},"施工工艺过程的控制",{"key":27,"text":54,"correct":25},"搬运、存储、包装、成品保护和交付过程的控制",{"key":30,"text":56,"correct":21},"质量管理体系的设置",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":19,"analysis":32},1268665,"当质量计划需修改时，由项目部技术负责人提出修改意见，报（ ）审批。",[61,63,65,67],{"key":19,"text":62,"correct":21},"项目负责人",{"key":23,"text":64,"correct":25},"企业技术负责人",{"key":27,"text":66,"correct":25},"企业分管领导",{"key":30,"text":68,"correct":25},"企业法人",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":19,"analysis":32},1268666,"质量计划对进厂采购的工程材料、工程机械设备、施工机械设备、工具等做具体规定，包括对建设方供应产品的标准及进场复验要求；（ ）；明确追溯内容的形成，记录、标志的主要方法；需要的特殊质量保证证据等。",[73,75,77,79],{"key":19,"text":74,"correct":21},"采购的法规与规定",{"key":23,"text":76,"correct":25},"工程施工阶段的确定",{"key":27,"text":78,"correct":25},"正确试验程序的控制",{"key":30,"text":80,"correct":25},"采购的规程",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":27,"analysis":32},1268667,"（ ）应定期组织具有资质的质检人员进行内部质量审核，并验证质量计划的实施效果，当项目控制中存在问题或隐患时，应提出解决措施。",[85,87,89,91],{"key":19,"text":86,"correct":25},"项目经理",{"key":23,"text":88,"correct":25},"项目质量员",{"key":27,"text":90,"correct":21},"项目技术负责人",{"key":30,"text":92,"correct":25},"公司技术负责人",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":19,"analysis":32},1268668,"（ ）是本工程实施的最高负责人，对工程符合设计、验收规范、标准要求负责；对各阶段按期交工负责。",[97,98,100,102],{"key":19,"text":62,"correct":21},{"key":23,"text":99,"correct":25},"施工负责人",{"key":27,"text":101,"correct":25},"管理负责人",{"key":30,"text":68,"correct":25},{"id":104,"libraryId":5,"type":9,"typeLabel":15,"stem":105,"options":106,"answer":30,"analysis":32},1268669,"以下不属于质量计划的编制要求的是（ ）。",[107,108,110,111],{"key":19,"text":50,"correct":25},{"key":23,"text":109,"correct":25},"搬运、储存、包装、成品保护和交付过程的控制",{"key":27,"text":52,"correct":25},{"key":30,"text":56,"correct":21},{"id":113,"libraryId":5,"type":9,"typeLabel":15,"stem":114,"options":115,"answer":23,"analysis":32},1268670,"质量目标指合同范围内的全部工程的所有使用功能符合设计图纸要求。（ ）、分部、单位工程质量达到既定的施工质量验收标准。",[116,118,120,122],{"key":19,"text":117,"correct":25},"分段",{"key":23,"text":119,"correct":21},"分项",{"key":27,"text":121,"correct":25},"隐蔽",{"key":30,"text":123,"correct":25},"大型",{"id":125,"libraryId":5,"type":9,"typeLabel":15,"stem":126,"options":127,"answer":23,"analysis":32},1268671,"对实施过程出现的不合格品，项目部（ ）有权提出返工修补处理、降级处理或作不合格品处理意见和建议。",[128,130,132,134],{"key":19,"text":129,"correct":25},"施工员",{"key":23,"text":131,"correct":21},"质量员",{"key":27,"text":133,"correct":25},"实验员",{"key":30,"text":135,"correct":25},"资料员",{"id":137,"libraryId":5,"type":9,"typeLabel":15,"stem":138,"options":139,"answer":23,"analysis":32},1268672,"施工质量计划由（ ）组织质量、技术等部门人员编制，应按合同的约定提交监理、建设单位经企业技术负责人审核批准，审核后执行。",[140,141,142,143],{"key":19,"text":86,"correct":25},{"key":23,"text":90,"correct":21},{"key":27,"text":129,"correct":25},{"key":30,"text":131,"correct":25},{"id":145,"libraryId":5,"type":9,"typeLabel":15,"stem":146,"options":147,"answer":19,"analysis":32},1268673,"质量策划重点应放在（ ）的策划，策划过程应与施工方案、施工部署紧密结合。",[148,150,152,154],{"key":19,"text":149,"correct":21},"工程项目实现过程",{"key":23,"text":151,"correct":25},"工程项目设计",{"key":27,"text":153,"correct":25},"工程项目控制过程",{"key":30,"text":155,"correct":25},"工程筹划过程",{"id":157,"libraryId":5,"type":9,"typeLabel":15,"stem":158,"options":159,"answer":30,"analysis":32},1268674,"某市政工程施工企业中标某市一座互通立交桥。该工程的业主已委托某甲级监理单位进行工程监理。为保证工程施工质量，监理单位要求施工企业开工前编制好工程施工质量计划，做好质量预控工作。因此施工单位由项目质量负责人组织质量部门人员编制了施工质量计划，同时建立了质量责任制和考核评价办法，明确质量负责人对项目质量控制负过程质量控制由每道工序和岗位的责任人负责。请根据背景资料，回答下列问题。 关于建设工程项目的质量计划，下列说法正确的是（ ）。",[160,162,164,166],{"key":19,"text":161,"correct":25},"建设工程项目的质量计划就是建设单位的工程项目质量计划",{"key":23,"text":163,"correct":25},"建设工程项目的质量计划就是施工单位的工程项目质量计划",{"key":27,"text":165,"correct":25},"建设工程项目的质量计划就是设计单位的工程项目质量计划",{"key":30,"text":167,"correct":21},"建设工程项目的质量计划是由参与项目的各方分别进行质量计划而形成的质量计划体系",{"id":169,"libraryId":5,"type":9,"typeLabel":15,"stem":170,"options":171,"answer":19,"analysis":32},1268675,"某市政工程施工企业中标某市一座互通立交桥。该工程的业主已委托某甲级监理单位进行工程监理。为保证工程施工质量，监理单位要求施工企业开工前编制好工程施工质量计划，做好质量预控工作。因此施工单位由项目质量负责人组织质量部门人员编制了施工质量计划，同时建立了质量责任制和考核评价办法，明确质量负责人对项目质量控制负过程质量控制由每道工序和岗位的责任人负责。请根据背景资料，回答下列问题。 该项目建立的质量责任制和考核评价办法应明确（ ）是项目质量控制的责任人。",[172,173,174,176],{"key":19,"text":86,"correct":21},{"key":23,"text":90,"correct":25},{"key":27,"text":175,"correct":25},"项目质量负责人",{"key":30,"text":177,"correct":25},"项目施工负责人",{"id":179,"libraryId":5,"type":9,"typeLabel":15,"stem":180,"options":181,"answer":30,"analysis":32},1268676,"成本效益分析就是在成本和效益之间进行权衡，使效益（ ）成本。",[182,184,186,188],{"key":19,"text":183,"correct":25},"小于",{"key":23,"text":185,"correct":25},"不大于",{"key":27,"text":187,"correct":25},"等于",{"key":30,"text":189,"correct":21},"大于",{"id":191,"libraryId":5,"type":9,"typeLabel":15,"stem":192,"options":193,"answer":19,"analysis":32},1268677,"施工质量计划的编制主体是（ ）。",[194,196,198,200],{"key":19,"text":195,"correct":21},"施工承包企业",{"key":23,"text":197,"correct":25},"设计单位",{"key":27,"text":199,"correct":25},"建设单位",{"key":30,"text":201,"correct":25},"监理单位",{"id":203,"libraryId":5,"type":9,"typeLabel":15,"stem":204,"options":205,"answer":19,"analysis":32},1268678,"某市政工程施工企业中标某市一座互通立交桥。该工程的业主已委托某甲级监理单位进行工程监理。为保证工程施工质量，监理单位要求施工企业开工前编制好工程施工质量计划，做好质量预控工作。因此施工单位由项目质量负责人组织质量部门人员编制了施工质量计划，同时建立了质量责任制和考核评价办法，明确质量负责人对项目质量控制负过程质量控制由每道工序和岗位的责任人负责。请根据背景资料，回答下列问题。 施工项目质量计划应由（ ）组织有关人员编制。",[206,207,208,209],{"key":19,"text":90,"correct":21},{"key":23,"text":86,"correct":25},{"key":27,"text":175,"correct":25},{"key":30,"text":177,"correct":25},{"id":211,"libraryId":5,"type":9,"typeLabel":15,"stem":212,"options":213,"answer":30,"analysis":32},1268679,"分项工程可由一个或若干（ ）组成。",[214,216,218,220],{"key":19,"text":215,"correct":25},"标段",{"key":23,"text":217,"correct":25},"工序",{"key":27,"text":219,"correct":25},"部位",{"key":30,"text":221,"correct":21},"检验批",{"id":223,"libraryId":5,"type":9,"typeLabel":15,"stem":224,"options":225,"answer":23,"analysis":32},1268680,"质量目标指合同范围内的全部工程的所有使用功能符合设计（或更改）图纸要求。（ ）、分部、单位工程质量达到既定的施工质量验收标准。",[226,227,228,229],{"key":19,"text":117,"correct":25},{"key":23,"text":119,"correct":21},{"key":27,"text":121,"correct":25},{"key":30,"text":123,"correct":25},{"id":231,"libraryId":5,"type":9,"typeLabel":15,"stem":232,"options":233,"answer":23,"analysis":32},1268681,"（ ）是本工程实施的最高负责人，对工程符合设计、验收规范、标准要求负责；对各阶段、各工号按期交工负责。",[234,235,236,237],{"key":19,"text":99,"correct":25},{"key":23,"text":62,"correct":21},{"key":27,"text":101,"correct":25},{"key":30,"text":68,"correct":25},{"id":239,"libraryId":5,"type":9,"typeLabel":15,"stem":240,"options":241,"answer":19,"analysis":32},1268682,"质量策划的重点应放在（ ）的策划，策划过程应与施工方案、施工部署紧密结合。",[242,243,244,245],{"key":19,"text":149,"correct":21},{"key":23,"text":151,"correct":25},{"key":27,"text":153,"correct":25},{"key":30,"text":155,"correct":25},{"id":247,"libraryId":5,"type":9,"typeLabel":15,"stem":248,"options":249,"answer":23,"analysis":32},1268683,"某城市道路工程进行招标。A单位中标后与发包方签订了施工合同准备施工。首先由项目经理部索取设计图纸和技术资料，依据设计文件和设计技术交底的工程控制点进行复测，并主持对图纸审核，形成会审记录。接着企业对施工方班组长以上的人员进行质量知识培训，并保存培训记录。 设计交底最主要的目的是（ ）。",[250,252,254,256],{"key":19,"text":251,"correct":25},"对设计方案进行评价",{"key":23,"text":253,"correct":21},"发现和减少设计图纸的差错",{"key":27,"text":255,"correct":25},"施工方对图纸内容提出质疑",{"key":30,"text":257,"correct":25},"对施工方的技术培训",{"id":259,"libraryId":5,"type":9,"typeLabel":15,"stem":260,"options":261,"answer":23,"analysis":32},1268684,"下列不属于工程中材料的是。（ ）",[262,264,266,268],{"key":19,"text":263,"correct":25},"半成品",{"key":23,"text":265,"correct":21},"施工器具",{"key":27,"text":267,"correct":25},"原材料",{"key":30,"text":269,"correct":25},"成品",{"id":271,"libraryId":5,"type":9,"typeLabel":15,"stem":272,"options":273,"answer":27,"analysis":32},1268685,"方案一旦确定就不得随意更改，如提出更改必须以书面申请的方式，报（批准后，以修改方案的形式正式确定。",[274,275,276,277],{"key":19,"text":92,"correct":25},{"key":23,"text":86,"correct":25},{"key":27,"text":90,"correct":21},{"key":30,"text":131,"correct":25},{"id":279,"libraryId":5,"type":9,"typeLabel":15,"stem":280,"options":281,"answer":23,"analysis":32},1268686,"以一个建筑物或构筑物为对象而进行的施工准备是。（ ）",[282,284,286,288],{"key":19,"text":283,"correct":25},"全场性施工准备",{"key":23,"text":285,"correct":21},"单位工程施工准备",{"key":27,"text":287,"correct":25},"分项工程施工准备",{"key":30,"text":289,"correct":25},"开工前施工准备",{"id":291,"libraryId":5,"type":9,"typeLabel":15,"stem":292,"options":293,"answer":27,"analysis":32},1268687,"贮存期超过（ ）个月的过期水泥或受潮、结块的水泥，需重新检定其强度等级，并且不允许用于重要工程中。",[294,296,297,298],{"key":19,"text":295,"correct":25},"1",{"key":23,"text":20,"correct":25},{"key":27,"text":24,"correct":21},{"key":30,"text":299,"correct":25},"6",{"id":301,"libraryId":5,"type":9,"typeLabel":15,"stem":302,"options":303,"answer":27,"analysis":32},1268688,"下列不属于材料质量控制的内容的是。（ ）",[304,306,308,310],{"key":19,"text":305,"correct":25},"材料质量的标准",{"key":23,"text":307,"correct":25},"材料的性能",{"key":27,"text":309,"correct":21},"材料的厂家",{"key":30,"text":311,"correct":25},"材料取样、试验方法",{"id":313,"libraryId":5,"type":9,"typeLabel":15,"stem":314,"options":315,"answer":27,"analysis":32},1268689,"某城市道路工程进行招标。A单位中标后与发包方签订了施工合同准备施工。首先由项目经理部索取设计图纸和技术资料，依据设计文件和设计技术交底的工程控制点进行复测，并主持对图纸审核，形成会审记录。接着企业对施工方班组长以上的人员进行质量知识培训，并保存培训记录。 项目技术负责人的职责之一是负责施工组织设计、安全专项施工方案、关键部位、特殊工序以及（ ）技术交底。",[316,318,320,322],{"key":19,"text":317,"correct":25},"“三全”",{"key":23,"text":319,"correct":25},"“三新”",{"key":27,"text":321,"correct":21},"“四新”",{"key":30,"text":323,"correct":25},"隐蔽工程",{"id":325,"libraryId":5,"type":9,"typeLabel":15,"stem":326,"options":327,"answer":30,"analysis":32},1268690,"下列不属于技术准备的是。（ ）",[328,330,332,334],{"key":19,"text":329,"correct":25},"图纸会审",{"key":23,"text":331,"correct":25},"技术交底",{"key":27,"text":333,"correct":25},"施工组织设计编制",{"key":30,"text":335,"correct":21},"原材料送检",{"id":337,"libraryId":5,"type":9,"typeLabel":15,"stem":338,"options":339,"answer":30,"analysis":32},1268691,"下列不属于城镇桥梁预应力工程质量控制点的是。（ ）",[340,342,344,346],{"key":19,"text":341,"correct":25},"预埋管道位置、尺寸、连接等检查",{"key":23,"text":343,"correct":25},"张拉程序、张拉控制应力、伸长率、持荷时间控制",{"key":27,"text":345,"correct":25},"张拉设备、预应力筋、锚夹具检（试）验试验",{"key":30,"text":347,"correct":21},"焊接工艺评定",{"id":349,"libraryId":5,"type":9,"typeLabel":15,"stem":350,"options":351,"answer":19,"analysis":32},1268692,"某城市道路工程进行招标。A单位中标后与发包方签订了施工合同准备施工。首先由项目经理部索取设计图纸和技术资料，依据设计文件和设计技术交底的工程控制点进行复测，并主持对图纸审核，形成会审记录。接着企业对施工方班组长以上的人员进行质量知识培训，并保存培训记录。 设计交底时要求的参与方是（ ）等单位。",[352,354,356,358],{"key":19,"text":353,"correct":21},"建设、设计、施工",{"key":23,"text":355,"correct":25},"规划、设计、建设",{"key":27,"text":357,"correct":25},"设计、施工、质检",{"key":30,"text":359,"correct":25},"施工、监理、质检",{"id":361,"libraryId":5,"type":9,"typeLabel":15,"stem":362,"options":363,"answer":27,"analysis":32},1268693,"下列工作不属于对工程材料质量的控制的是。（ ）",[364,366,368,370],{"key":19,"text":365,"correct":25},"优选供货商",{"key":23,"text":367,"correct":25},"合理组织材料供应",{"key":27,"text":369,"correct":21},"正确使用、管理和保养好机械设备",{"key":30,"text":371,"correct":25},"加强检查验收",{"id":373,"libraryId":5,"type":9,"typeLabel":15,"stem":374,"options":375,"answer":27,"analysis":32},1268694,"单位工程、分部工程和分项工程开工前，（ ）应向承担施工的负责人或分包人进行书面技术交底。技术交底资料应办理签字手续并归档。",[376,377,378,379],{"key":19,"text":86,"correct":25},{"key":23,"text":92,"correct":25},{"key":27,"text":90,"correct":21},{"key":30,"text":131,"correct":25},{"id":381,"libraryId":5,"type":9,"typeLabel":15,"stem":382,"options":383,"answer":23,"analysis":32},1268695,"下列不属于三检制内容的是。（ ）",[384,386,388,390],{"key":19,"text":385,"correct":25},"自检",{"key":23,"text":387,"correct":21},"送检",{"key":27,"text":389,"correct":25},"互检",{"key":30,"text":391,"correct":25},"交接检",{"id":393,"libraryId":5,"type":9,"typeLabel":15,"stem":394,"options":395,"answer":27,"analysis":32},1268696,"影响施工质量的因素中，（ ）方面的因素不是主要因素。",[396,398,400,402],{"key":19,"text":397,"correct":25},"人",{"key":23,"text":399,"correct":25},"机械",{"key":27,"text":401,"correct":21},"资金",{"key":30,"text":403,"correct":25},"材料",{"id":405,"libraryId":5,"type":9,"typeLabel":15,"stem":406,"options":407,"answer":27,"analysis":32},1268697,"工程项目完工后，施工单位应自行组织有关人员进行检验，并将资料与自检结果，报（ ）申请验收.",[408,409,410,411],{"key":19,"text":199,"correct":25},{"key":23,"text":197,"correct":25},{"key":27,"text":201,"correct":21},{"key":30,"text":412,"correct":25},"监督站",{"id":414,"libraryId":5,"type":9,"typeLabel":15,"stem":415,"options":416,"answer":23,"analysis":32},1268698,"承台混凝土浇筑后，应检查承台表面无孔洞、露筋、缺棱掉角、蜂窝、麻面和宽度超过（ ）mm的收缩裂缝。",[417,419,421,423],{"key":19,"text":418,"correct":25},"0.1",{"key":23,"text":420,"correct":21},"0.15",{"key":27,"text":422,"correct":25},"0.2",{"key":30,"text":424,"correct":25},"0.25",{"id":426,"libraryId":5,"type":9,"typeLabel":15,"stem":427,"options":428,"answer":30,"analysis":32},1268699,"弯钩平直部分的长度，一般结构不宜小于箍筋直径的（ ）倍。",[429,430,431,432],{"key":19,"text":20,"correct":25},{"key":23,"text":24,"correct":25},{"key":27,"text":28,"correct":25},{"key":30,"text":31,"correct":21},{"id":434,"libraryId":5,"type":9,"typeLabel":15,"stem":435,"options":436,"answer":19,"analysis":32},1268700,"钢筋搭接焊时，焊缝长度应符合（ ）。（d为钢筋直径）",[437,439,441,443],{"key":19,"text":438,"correct":21},"双面焊缝长度不得小于5d,单面焊缝长度不得小于10d",{"key":23,"text":440,"correct":25},"双面焊缝长度不得小于10d，单面焊缝长度不得小于5d",{"key":27,"text":442,"correct":25},"单、双面焊缝均不得小于5d",{"key":30,"text":444,"correct":25},"单、双面焊缝均不得小于10d",{"id":446,"libraryId":5,"type":9,"typeLabel":15,"stem":447,"options":448,"answer":27,"analysis":32},1268701,"给水排水管道安装完毕后，应进行管道功能性试验。 水压试验管道内径大于或等于（ ）时，试验管段端部的第一个接口应采用柔性接口，或采用特制的柔性接口堵板。",[449,451,453,455],{"key":19,"text":450,"correct":25},"400m",{"key":23,"text":452,"correct":25},"500mm",{"key":27,"text":454,"correct":21},"600mm",{"key":30,"text":456,"correct":25},"800mm",{"id":458,"libraryId":5,"type":9,"typeLabel":15,"stem":459,"options":460,"answer":30,"analysis":32},1268702,"规划红线是道路的用地界线，常用（ ）表示。",[461,463,465,467],{"key":19,"text":462,"correct":25},"单实线",{"key":23,"text":464,"correct":25},"双实线",{"key":27,"text":466,"correct":25},"点画线",{"key":30,"text":468,"correct":21},"双点画线",{"id":470,"libraryId":5,"type":9,"typeLabel":15,"stem":471,"options":472,"answer":30,"analysis":32},1268703,"预制桩混凝土强度达到设计强度的（ ）方可运打。",[473,475,477,479],{"key":19,"text":474,"correct":25},"75%",{"key":23,"text":476,"correct":25},"80%",{"key":27,"text":478,"correct":25},"90%",{"key":30,"text":480,"correct":21},"100%",{"id":482,"libraryId":5,"type":9,"typeLabel":15,"stem":483,"options":484,"answer":19,"analysis":32},1268704,"预应力筋的张拉顺序应符合设计要求，当设计无规定时（ ）。",[485,487,489,491],{"key":19,"text":486,"correct":21},"宜先中间，后上、下或两侧",{"key":23,"text":488,"correct":25},"宜先两侧，后上、下或中间",{"key":27,"text":490,"correct":25},"宜先上、下，后中间或两侧",{"key":30,"text":492,"correct":25},"宜同时进行",{"id":494,"libraryId":5,"type":9,"typeLabel":15,"stem":495,"options":496,"answer":19,"analysis":32},1268705,"预应力筋下料宜使用（ ）。",[497,499,501,503],{"key":19,"text":498,"correct":21},"切断机或砂轮锯切断",{"key":23,"text":500,"correct":25},"电弧切割",{"key":27,"text":502,"correct":25},"氧气切割",{"key":30,"text":504,"correct":25},"手锯切割",{"id":506,"libraryId":5,"type":9,"typeLabel":15,"stem":507,"options":508,"answer":30,"analysis":32},1268706,"灌注桩在灌注混凝土过程中，导管的埋设深度宜控制在（ ）。",[509,511,513,515],{"key":19,"text":510,"correct":25},"1~2m",{"key":23,"text":512,"correct":25},"2~4m",{"key":27,"text":514,"correct":25},"4~6m",{"key":30,"text":516,"correct":21},"2~6m",{"id":518,"libraryId":5,"type":9,"typeLabel":15,"stem":519,"options":520,"answer":30,"analysis":32},1268707,"焊接接头长度区段内是指（ ）（d为钢筋直径）长度范围内，但不得小于500mm。",[521,523,525,527],{"key":19,"text":522,"correct":25},"20d",{"key":23,"text":524,"correct":25},"25d",{"key":27,"text":526,"correct":25},"30d",{"key":30,"text":528,"correct":21},"35d",{"id":530,"libraryId":5,"type":9,"typeLabel":15,"stem":531,"options":532,"answer":30,"analysis":32},1268708,"管内径大于（ ）mm的柔性管道，回填施工时应在管内设有竖向支撑。",[533,535,537,539],{"key":19,"text":534,"correct":25},"500",{"key":23,"text":536,"correct":25},"600",{"key":27,"text":538,"correct":25},"700",{"key":30,"text":540,"correct":21},"800",{"id":542,"libraryId":5,"type":9,"typeLabel":15,"stem":543,"options":544,"answer":23,"analysis":32},1268709,"在软土或其他不稳定土层中采用横排撑板支撑时，开始支撑的沟槽开挖深度不得超过（ ）。",[545,547,549,551],{"key":19,"text":546,"correct":25},"0.5m",{"key":23,"text":548,"correct":21},"1m",{"key":27,"text":550,"correct":25},"1.5m",{"key":30,"text":552,"correct":25},"2m",{"id":554,"libraryId":5,"type":9,"typeLabel":15,"stem":555,"options":556,"answer":19,"analysis":32},1268710,"管道第一次冲洗应用清洁水冲洗至出水口水样浊度小于3NTU为止，冲洗流速应大于（ ）m\u002Fs。",[557,559,561,562],{"key":19,"text":558,"correct":21},"1.0",{"key":23,"text":560,"correct":25},"1.5",{"key":27,"text":20,"correct":25},{"key":30,"text":563,"correct":25},"2.5",{"id":565,"libraryId":5,"type":9,"typeLabel":15,"stem":566,"options":567,"answer":27,"analysis":32},1268711,"管道水压试验时，向管道内注水应从（ ）缓慢注人。",[568,570,572,574],{"key":19,"text":569,"correct":25},"上游",{"key":23,"text":571,"correct":25},"两端",{"key":27,"text":573,"correct":21},"下游",{"key":30,"text":575,"correct":25},"其中任何一端",[577,580,583,586,589,592],{"id":9,"name":578,"category":7,"favorite":579},"领导干部任职前廉政法规知识测试题",92,{"id":581,"name":582,"category":7,"favorite":9},595,"建筑结构与设备",{"id":584,"name":585,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":587,"name":588,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":590,"name":591,"category":7,"favorite":8},534,"BIM工程师",{"id":593,"name":591,"category":7,"favorite":8},535]