[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269265":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1269265,856,3,"判断题","当参加验收各方对工程质量验收意见不一致时，应重新验收。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"先由施工单位检查评定合格，提交验收。由总监理工程师或建设单位项目负责人在表的验收结论栏目内填写“好”、“一般”、“差”（“差”的项目应进行返修后重新验收）。",{"id":6,"name":21,"category":22,"favorite":23},"(市政质量)专业管理实务 岗位知识","建筑工程",0]