[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269163":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1269163,856,3,"判断题","压力管道水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于Im。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"压力管道水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于0.5m。",{"id":6,"name":21,"category":22,"favorite":23},"(市政质量)专业管理实务 岗位知识","建筑工程",0]