[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269159":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1269159,856,3,"判断题","预应力筋拉完毕，实际位置与设计位置的偏差不得大于10mm，且不得大于构件截面最短边长的4%。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"预应力筋拉完毕，实际位置与设计位置的偏差不得大于5mm，且不得大于构件截面最短边长的4%。",{"id":6,"name":21,"category":22,"favorite":23},"(市政质量)专业管理实务 岗位知识","建筑工程",0]