[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269099":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1269099,856,3,"判断题","确定项目目标，首先应依据施工组织设计的项目质量总目标和工程项目的组成与划分，逐级分解，落实责任部门和个人。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"确定项目目标：首先应依据施工组织设计的项目质量总目标和工程项目的组成与划分，逐级分解，落实责任部门和个人。",{"id":6,"name":21,"category":22,"favorite":23},"(市政质量)专业管理实务 岗位知识","建筑工程",0]