[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269079":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1269079,856,3,"判断题","当不合格品通知方和接收方意见不能协调时，则上级质量监督检查部门、公司质量主管负责人，乃至项目部负责人裁决。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(市政质量)专业管理实务 岗位知识","建筑工程",0]