[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269070":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1269070,856,2,"多选题","工程建设项目，特别是市政工程建设项目具有建设规模大、（ ）等特点。这一特点，决定了质量策划的难度。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","检测技术不完善",false,{"key":16,"text":17,"correct":18},"B","分期建设",true,{"key":20,"text":21,"correct":18},"C","多种专业配合",{"key":23,"text":24,"correct":18},"D","对施工工艺和施工方法的要求高",{"key":26,"text":27,"correct":14},"E","专业性强","BCD","工程建设项目，特别是市政工程建设项目具有建设规模大、分期建设、多种专业配合、对施工工艺和施工方法的要求高等特点。",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)专业管理实务 岗位知识","建筑工程",0]