[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269024":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1269024,856,2,"多选题","下列主控项目包括的主要内容有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","重要材料、成品、半成品及附件的材质，检查出厂证明及试验数据",true,{"key":16,"text":17,"correct":18},"B","外观质量",false,{"key":20,"text":21,"correct":14},"C","结构的强度、刚度和稳定性等数据，检查试验报告",{"key":23,"text":24,"correct":14},"D","工程进行中和完毕后必须进行检测，现场抽查或检查试测记录",{"key":26,"text":27,"correct":18},"E","允许偏差项目","ACD","下列主控项目包括的主要内容有：1.重要材料、成品、半成品及附件的材质，检查出厂证明及试验数据、2.结构的强度、刚度和稳定性等数据，检查试验报告、3.工程进行中和完毕后必须进行检测，现场抽查或检查试测记录",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)专业管理实务 岗位知识","建筑工程",0]